Binh Dinh proposes to repair damaged roads due to highway service

Hoài Luân |

Dozens of roads in Binh Dinh were severely damaged by trucks carrying construction materials for the highway, but the project investor repaired them carelessly and hastily.

On January 7, the People's Committee of Binh Dinh province said that it had requested the Ministry of Transport to direct Project Management Board 2 and Project Management Board 85 (investors) to immediately repair and restore local roads affected during the transportation of construction materials for the North-South Expressway project, the section passing through the province.

Timely fix and repair potholes, subsidence, flooding, damage... that do not ensure traffic safety for people and vehicles.

Doan duong qua xa Nhon Loc (thi xa An Nhon) hu hong nang do anh huong thi cong cao toc Bac - Nam. Anh: Cong Tam
The road section through Nhon Loc commune (An Nhon town) was severely damaged due to the impact of the construction of the North-South expressway project. Photo: Cong Tam

Regarding the Project to Enhance Traffic Connectivity in the Central Highlands region, it is recommended that the Ministry of Transport direct the investor to seriously handle traffic infrastructure shortcomings and enhance traffic safety on National Highway 19 through the province.

In addition, direct the investor to consider prioritizing the upgrading and expansion of Trang II Bridge at Km24+650, Nuoc Xanh Bridge at Km36+546 and Dong Xiem Bridge at Km39+482 on National Highway 19 through the province, to synchronize with the road surface on the route.

According to the Department of Transport of Binh Dinh province, through inspection, the provincial road system currently has 4 routes (DT629, 630, 636 and 638) that are severely damaged due to serving the construction of the North-South Expressway project, with a total length of more than 105km. At the same time, the road system in the localities also recorded 56 routes that were seriously damaged, with a total length of more than 66km.

One of the most severely damaged routes is the section Km1+00 - Km3+170 (DT629). This damage causes many difficulties for people in the area to travel.

Recently, the investor has directed the construction unit to inspect, fix and repair damaged and degraded routes during the construction of the North-South expressway project.

However, the work of repairing and overcoming this situation has not been done promptly, is still sketchy, hasty, and in many cases is still formal, not meeting quality requirements.

In addition, prolonged rainy weather has made construction routes "more seriously ill", seriously affecting people's travel and daily life. In some areas, traffic accidents tend to increase.

Hoài Luân
TIN LIÊN QUAN

Binh Dinh proposes road sector to handle damage on national highways

|

Regarding the serious degradation of national highways, Binh Dinh requested the road sector to direct route management units and BOT investors to immediately repair the damage.

Dozens of roads in Binh Dinh are severely damaged due to highway maintenance

|

Through inspection, Binh Dinh has 4 provincial roads and 56 locally managed roads that were severely damaged by vehicles carrying construction materials for the expressway project.

Trucks carrying construction materials for the highway destroyed many roads in Binh Dinh

|

Through inspection, many residential roads and provincial roads in Binh Dinh province were seriously damaged by vehicles carrying construction materials for the highway.

Sad news

|

Mrs. Vo Thi Gai (born in 1945, residing at 156 Ly Tu Trong, Da Nang city) is the mother of comrade Tran Thanh Nhan - employee of Lao Dong newspaper representative office in the Central region - passed away at 20:45 on January 9, 2025 (ie December 10, Giap Thin year); aged 80.

Air pollution unexpectedly decreased, Hanoi people were excited

|

Recorded on January 10, air pollution levels in Hanoi decreased significantly due to cold winds.

Faulty traffic lights, motorbikes pushed, cars lined up waiting

|

HCMC - On January 10, the traffic light at the intersection of National Highway 22 - Giap Hai (Cu Chi district) was faulty, causing people to not dare to drive through the intersection.

Ensuring food safety during Lunar New Year 2025

|

Ho Chi Minh City - To ensure food safety during the 2025 Lunar New Year, the city will strengthen control and prevent the production and trading of poor quality food.

Capital Youth Park is about to be "revived"

|

Currently, the Capital Youth Park (Hai Ba Trung District, Hanoi) has had its surrounding fence system removed to create an open space to serve the people.

Binh Dinh proposes road sector to handle damage on national highways

Hoài Phương |

Regarding the serious degradation of national highways, Binh Dinh requested the road sector to direct route management units and BOT investors to immediately repair the damage.

Dozens of roads in Binh Dinh are severely damaged due to highway maintenance

Hoài Phương |

Through inspection, Binh Dinh has 4 provincial roads and 56 locally managed roads that were severely damaged by vehicles carrying construction materials for the expressway project.

Trucks carrying construction materials for the highway destroyed many roads in Binh Dinh

Hoài Phương |

Through inspection, many residential roads and provincial roads in Binh Dinh province were seriously damaged by vehicles carrying construction materials for the highway.