On August 25, in an exchange with a reporter from Lao Dong Newspaper, a representative of the Dong Nai City Construction Investment Project Management Board said that currently the investor is drastically coordinating with local authorities and functional agencies to complete site clearance for the project to upgrade and expand road 25B (Ton Duc Thang road) section from the center of Nhon Trach ward to National Highway 51 to promptly open the entire project to traffic by the end of 2026.
The 25B road upgrade project, the site handover rate reached more than 98%, is currently still entangled in the Hiep Phuoc intersection area (Nhon Trach ward).
The project to upgrade and expand road 25B section from the center of Nhon Trach ward to National Highway 51 has a length of more than 9.2km, started in December 2024, with a total investment of nearly 1,500 billion VND and is being expanded to 10 lanes.
The 25B road upgrade and expansion project along with the 25C road construction project (from Huong Lo 19 to National Highway 51) being simultaneously implemented are 2 projects implemented by Dong Nai to create 2 traffic axes connecting from Long Thanh airport to Ho Chi Minh City and vice versa.
According to the plan, roads 25B and 25C will connect Long Thanh airport through National Highway 51 to the Ben Luc - Long Thanh expressway, Ring Road 3 of Ho Chi Minh City, reducing the load on the Ho Chi Minh City - Long Thanh - Dau Giay expressway.
Dong Nai City People's Committee has also requested Nhon Trach and Long Thanh wards to accelerate progress and soon hand over the entire site to complete the 25B road project and put it into operation at the end of 2026.
The construction appearance of expanding the 25B road in Dong Nai to 10 lanes, connecting Ho Chi Minh City:








Dong Nai has 4 key transport infrastructure projects being implemented to serve the connection of Long Thanh airport. To date, Component Project 1, Bien Hoa - Vung Tau expressway has been put into operation; Component Project 3, Ho Chi Minh City Ring Road 3 and Provincial Road 25C Construction Project (section from National Highway 51 to Huong Lo 19) are expected to be opened to traffic in October 2026; Provincial Road 25B Upgrade and Expansion Project (section from the center of Nhon Trach commune to National Highway 51) will be opened to traffic at the end of 2026.
