Ha Nam issues second alert on Day River

Thu Giang |

On September 22, the authorities of Ha Nam province issued an urgent dispatch on issuing a second warning on the Day River and proactively responding to floods.

Due to the impact of heavy rain in Ha Nam province on the night of September 21 and on September 22, 2024, the water level on the Day River at Phu Ly measured at 1:00 p.m. on September 22, 2024 was 3.65 m, 0.15 m above alarm level II (according to Decision No. 05/2020/QD-TTG dated October 31, 2020 of the Prime Minister, the alarm level I on the Day River at Phu Ly hydrological station is 3.50).

On September 22, the Standing Office of the Steering Committee for Natural Disaster Prevention and Control and Search and Rescue (PCTT&TKCN) of Ha Nam province issued a second alert on the Day River and requested the PCTT&TKCN Steering Committees of Kim Bang, Thanh Liem districts and Phu Ly city to implement the following contents:

Carry out patrolling and guarding to protect dikes according to the alarm level in accordance with the instructions in Circular No. 01/2009/TT-BNN dated January 6, 2009 of the Ministry of Agriculture and Rural Development guiding patrolling and guarding to protect dikes during the flood season.

Q
Ha Nam issues alert II on Day River. Photo: Ha Nam Provincial People's Committee

Regularly check and be ready to deploy dike protection plans, culverts under the dike, embankments to protect the banks and key weak dike points.

Closely monitor water level developments on the river and proactively implement plans to evacuate people living in riverbank areas, ensuring safety of people and property.

Organize a serious on-duty team, closely monitor the developments of rain and floods to be ready to handle situations from the first hour; promptly inform and report to the Standing Office of the Steering Committee for Disaster Prevention and Control and Search and Rescue of Ha Nam province.

Thu Giang
RELATED NEWS

A ward in Hanoi resolves land procedures overdue for 134 days, must apologize to citizens

|

Hanoi - Long Bien Ward is assessed as still having shortcomings and limitations when resolving administrative procedures on land, including dossiers that are overdue for 134 days.

Prenn Pass road closed in Da Lat for 6 days to repair landslide site

|

Lam Dong - Functional agencies decided to close Prenn Pass road for 6 days to repair and fix damaged points caused by previous landslides.

Forecast of the time to end widespread severe cold in the North

|

According to a representative of the meteorological agency, it is forecast that widespread severe cold and frost in the North will last until about January 10, to prevent frost and frost in mountainous areas.

Ho Chi Minh City launches campaign to handle sidewalk and roadway encroachment throughout the area

|

Ho Chi Minh City is deploying a peak period of inspection and handling of sidewalk and roadway encroachment throughout the area to restore urban order.

A restaurant yacht catches fire on the Saigon River

|

Ho Chi Minh City - Restaurant yacht on Saigon River suddenly catches fire, functional forces are controlling the fire.

Ha Nam regulates bidding criteria to select investors for urban areas

Thu Giang |

The People's Council of Ha Nam province has just issued a Resolution stipulating criteria for bidding to select investors to implement projects using land to build urban areas.

Ha Nam announced the dissolution of a branch

Thu Giang |

On September 20, the People's Committee of Ha Nam province announced the dissolution of the Ha Nam Provincial Construction Inspection Branch (under the Ha Nam Provincial Department of Construction).

Hà Nam yêu cầu giám sát việc xử lý chất thải sau mưa bão

TRÍ MINH |

Khắc phục hậu quả bão số 3 và mưa lũ sau bão, Hà Nam yêu cầu tăng cường giám sát xử lý chất thải của các doanh nghiệp trên địa bàn.