Current status of E2 Dien Bien Phu hill before investing 35 billion VND

QUANG ĐẠT |

The E2 Hill relic in Dien Bien belongs to the Dien Bien Phu battlefield National Special Historical Relic, with an investment of 35 billion VND.

In mid-February 2025, Dien Bien province approved the project "Construction of the President Ho Chi Minh Memorial House and investment in additional construction items at the E2 Hill Relic" with a total investment of 35 billion VND.

The E2 Hill relic (belonging to Tan Thanh ward and Him Lam ward, Dien Bien Phu city) with an area of 76,466.5m2 (no protection area II) was classified by the Prime Minister as a special national relic in 2009.

aaaa
The water supply and drainage system has degraded.

According to Lao Dong, some items at the E2 Hill relic have degraded, including the fire prevention and fighting system and water supply and drainage...

aaa
The fire prevention and fighting system will be invested in when the project is implemented.

The investment in construction of the project has profound political and social significance and humanistic values. Educate the traditional patriotic tradition, demonstrating the affection and gratitude of the Party, State and people for President Ho Chi Minh. Create highlights in architecture and space, attracting people and tourists to visit and travel.

aaa
Panorama of E2 Hill is one of the strongholds of the French army in the Dien Bien Phu Campaign.

It is known that the project to build the "Construction of the President Ho Chi Minh Memorial House and investment in additional construction items at the E2 Hill Relic" is invested by the Department of Culture, Sports and Tourism of Dien Bien province. This is a group C project; a civil project, level III; the minimum life of the project is 50 years.

The President Ho Chi Minh Memorial House has a construction area of 160m2; designed in traditional architecture, with a 2-storey roof architecture.
In addition, there are some items: left and right floors; stone roofs; restoration of exhibition houses; relic stele; relic sea; leveling of the ground; yard, internal road...

aaa
E2 Hill is adjacent to E1 Hill. Photo: Google Maps.

The project implementation progress is from 2024-2026, this project is built with support capital from Ho Chi Minh City. The function of project management is assigned to the Project Management Board of Civil and Industrial Works of Dien Bien province.

aaa
The President Ho Chi Minh Memorial Site on E2 Hill was built in 2005.

During the Dien Bien Phu Campaign, E2 Hill belongs to the Dominican Resistance Center, one of the five eastern defensive peaks in the Central subdivision, with the task of preventing the Vietnam People's Army from attacking the Dien Bien Phu stronghold Group from the East.

aaaa
Project perspective "Construction of the President Ho Chi Minh Memorial House and investment in additional construction items at the E2 Hill Relic".

After 36 days and nights of strong and heroic fighting, the Vietnamese army completely took control of the two tops of E1 and E2, destroying 5 105mm artillery pieces, 6 large-scale anti-ship pieces, 1 battalion, 1 tank, 1 ammunition depot, destroying hundreds of French soldiers, launching a successful attack and destroying the following strongholds, contributing to the overall victory of the Dien Bien Phu Campaign.

QUANG ĐẠT
TIN LIÊN QUAN

Approving the inspection results of the Politburo in Dien Bien

|

On March 23, Inspection Team No. 1911 of the Politburo and the Secretariat had a working session to approve the draft report on inspection results in Dien Bien province.

Dien Bien opens a festival to commemorate the cloth general Hoang Cong Chat

|

Dien Bien - Thanh Ban Phu Festival is held annually to commemorate the cloth general Hoang Cong Chat in the history of the borderland.

Dien Bien builds President Ho Chi Minh Memorial House

|

Dien Bien province has just approved a 35 billion VND project to build a Memorial House for President Ho Chi Minh in Dien Bien Phu city.

House fire in Hanoi, a boy died

|

Hanoi - A fire broke out at a level 4 house in Hoai Duc district, the authorities quickly took the 2-year-old boy who was trapped outside but the victim died.

The Ministry of Education and Training plans 17 university admission methods in 2025

|

The Ministry of Education and Training (MOET) plans to have 17 university admission methods in 2025.

Quang Binh stops the off-provincial working group to reorganize the apparatus

|

Quang Binh - The Provincial Party Committee requires not to organize working groups outside the province to focus on arranging the apparatus and administrative units at all levels.

Candidates report being 20 minutes late for the National High School Grants Exam-HCM

|

Candidates taking the Ho Chi Minh City National University's Competency Assessment (VNU-HCM) exam report being 20 minutes late in taking the test due to the test monitor's error.

Approving the inspection results of the Politburo in Dien Bien

VĂN THÀNH CHƯƠNG |

On March 23, Inspection Team No. 1911 of the Politburo and the Secretariat had a working session to approve the draft report on inspection results in Dien Bien province.

Dien Bien opens a festival to commemorate the cloth general Hoang Cong Chat

QUANG ĐẠT |

Dien Bien - Thanh Ban Phu Festival is held annually to commemorate the cloth general Hoang Cong Chat in the history of the borderland.

Dien Bien builds President Ho Chi Minh Memorial House

QUANG ĐẠT |

Dien Bien province has just approved a 35 billion VND project to build a Memorial House for President Ho Chi Minh in Dien Bien Phu city.