Proposal to review 3 railway and metro lines connecting Long Thanh airport

HÀ ANH CHIẾN |

Airports Corporation of Vietnam (ACV) proposed to review the overall planning of 3 railway and metro projects within Long Thanh airport to avoid overload.

On May 10, Vietnam Airports Corporation (ACV) just sent a document to the Ministry of Construction, Ho Chi Minh City People's Committee and Dong Nai City People's Committee on considering arranging railway lines within the scope of Long Thanh International Airport (abbreviated as Long Thanh airport).

According to ACV, regarding the investment in the construction of railway lines within Long Thanh airport, to date, Dai Quang Minh Real Estate Investment Joint Stock Company has sent a document to ACV on seeking opinions on the route plan and location of works on the Thu Thiem - Long Thanh railway route project.

In addition, ACV is coordinating with the Department of Construction of Dong Nai City, Donacoop Infrastructure Investment Joint Stock Company on developing an investment plan for the metro section within Long Thanh airport for the Ben Thanh - Suoi Tien metro line extension project to the City Administrative Center and Long Thanh airport.

Accordingly, it is expected that there will be 3 railway lines including: North - South high-speed railway line; Thu Thiem - Long Thanh railway line and extending the Ben Thanh - Suoi Tien metro line to the City Administrative Center, Long Thanh airport will be invested simultaneously along the vacant land area between the main road of Long Thanh airport and build railway stations to access passenger terminals of Long Thanh airport (vacant land area of 40 m wide, planned for 2 high-speed railway lines North - South and Thu Thiem - Long Thanh railway line).

In which, for the North-South high-speed railway line and the Thu Thiem - Long Thanh railway line, ACV has had a written agreement with the Railway Project Management Board (Ministry of Construction) on the route plan, station location, and connection plan. The Railway Project Management Board has also summarized and reported to the Ministry of Construction.

Regarding the project to extend the Ben Thanh - Suoi Tien metro line to the City Administrative Center and Long Thanh airport, ACV has not yet received the planning as well as the route plan and approved station locations within Long Thanh airport.

Thus, currently, within the scope of Long Thanh airport, there is still no consensus on planning, route location, and construction plan for all railway lines. Therefore, ACV does not have enough basis to consider and respond to opinions on related contents for investors of each railway project.

ACV proposed that the Ministry of Construction take the lead or assign competent authorities to take the lead in reviewing the overall plan, the arrangement of all railway lines within Long Thanh airport to avoid overload in construction space planning between railway lines, conflicts in the construction process, and potential risks in the operation process between railway lines and Long Thanh Airport.

ACV also proposed that the Ministry of Construction, Ho Chi Minh City People's Committee, and Dong Nai City People's Committee have opinions directing investors of railway projects to proactively coordinate with each other, build a route plan, railway station location, connection plan and related contents appropriately, ensuring synchronization and unity in planning, construction and exploitation plans.

HÀ ANH CHIẾN
RELATED NEWS

Satellite city of Long Thanh airport focuses on building housing for workers

|

Immediately after officially becoming a ward-level administrative unit, Nhon Trach ward, Dong Nai city simultaneously deployed tasks to ensure full operational facilities according to the urban government model.

Long Thanh Airport recruits 35 job positions, salary 15 million VND/month

|

Dong Nai - Long Thanh Airport, which will be put into operation at the end of 2026, is recruiting 35 job positions with attractive salaries not lower than 15 million VND/month.

Long Thanh airport lacks labor

|

Dong Nai - Long Thanh Airport is targeted to be put into commercial operation in the fourth quarter of 2026, but still faces difficulties due to labor shortages.

Long Thanh Airport recruits 400 personnel for commercial operation at the end of 2026

|

Dong Nai - Airports Corporation of Vietnam (ACV) is recruiting 400 personnel to work at Long Thanh airport when this project goes into commercial operation at the end of 2026.

Live football Cong An Ha Noi vs Nam Dinh in V.League

|

Live match between Hanoi Police and Nam Dinh in round 22 of LPBank V.League 2025-2026, taking place at 7:15 PM today (May 10).

Fining concrete trucks blocking roads causing congestion after Lao Dong Newspaper's reflection

|

HUE - Concrete pump truck driver parked across the road causing congestion in Hue City fined 5 million VND.

Live football match Hoang Anh Gia Lai vs PVF-CAND in V.League

|

Live match between Hoang Anh Gia Lai and PVF-CAND in round 22 of LPBank V.League 2025-2026, taking place at 5:00 PM today (May 10).

54km of expressway to be opened to traffic soon, going from Dong Nai to Ho Chi Minh City takes less than 1 hour

|

The entire Bien Hoa - Vung Tau expressway is opened to traffic, shortening the travel time from the center of Dong Nai to the intersection of National Highway 56 HCMC to about 40-50 minutes.

Satellite city of Long Thanh airport focuses on building housing for workers

Minh Châu |

Immediately after officially becoming a ward-level administrative unit, Nhon Trach ward, Dong Nai city simultaneously deployed tasks to ensure full operational facilities according to the urban government model.

Long Thanh Airport recruits 35 job positions, salary 15 million VND/month

HÀ ANH CHIẾN |

Dong Nai - Long Thanh Airport, which will be put into operation at the end of 2026, is recruiting 35 job positions with attractive salaries not lower than 15 million VND/month.

Long Thanh airport lacks labor

HÀ ANH CHIẾN |

Dong Nai - Long Thanh Airport is targeted to be put into commercial operation in the fourth quarter of 2026, but still faces difficulties due to labor shortages.

Long Thanh Airport recruits 400 personnel for commercial operation at the end of 2026

HÀ ANH CHIẾN |

Dong Nai - Airports Corporation of Vietnam (ACV) is recruiting 400 personnel to work at Long Thanh airport when this project goes into commercial operation at the end of 2026.