There will be a new 6-lane road in Thuong Tin district

KHÁNH AN |

Hanoi - Thuong Tin District is preparing to build a 2.7km long, 6-lane road, passing through Khanh Ha and Hoa Binh communes.

On March 24, the Hanoi People's Committee issued a decision approving the Ngoc Hoi - Phu Xuyen route plan, scale 1/500 (phase 1 - section from Ring Road 4 to Provincial Road 427).

Accordingly, the route passes through Khanh Ha, Hoa Binh communes, Thuong Tin district, Hanoi city with a length of about 2.7km. The starting point is at the intersection with Ring Road 4 and the end point is at the intersection with Provincial Road 427.

The route has a typical cross-section of 65m (6 lanes, 3 lanes in each direction); the median strip is 11.5m wide; the parallel roads on both sides are 2x7.5m wide (2x7.5m on each side of the road); 2 secondary median strips on both sides are 2x1m wide; the sidewalks on both sides are 2x7m wide.

The City People's Committee assigned the Department of Planning and Architecture to inspect and confirm the 1/500 scale route plan dossier in accordance with the content of this decision; responsible for the accuracy of the submitted data.

Assign the People's Committee of Thuong Tin district to preside over and coordinate with the Department of Planning and Architecture and related units to organize the public announcement of the route plan, at a scale of 1/500 approved by the City People's Committee. Hand over the dossier to the People's Committees of Hoa Binh and Khanh Ha communes to manage the construction planning along both sides of the road and related units to implement the work of establishing construction investment projects according to regulations.

Along with reviewing the investment scale of the Ngoc Hoi - Phu Xuyen road construction project, in case the project has not fully invested in the cross-section scale according to the plan, the People's Committee of Thuong Tin district is responsible for organizing the preparation, appraisal, approval of documents and organizing the placement of boundary markers according to the plan and is responsible for managing the land area reserved for road cross-section expansion according to the approved route plan.

The Chairman of the People's Committee of Thuong Tin district, the Chairmen of the People's Committees of Khanh Ha and Hoa Binh communes are responsible for organizing the management of boundary markers, the construction of works on both sides of the road according to the approved route plan, boundary markers and road protection corridors according to regulations. Inspect and handle violations of planning according to authority and regulations of law.

KHÁNH AN
TIN LIÊN QUAN

A new 30m wide road is about to be built in Dan Phuong district

|

Hanoi - The road under the investment project to build a road from Tien Tan dike to Dan Phuong Kindergarten is about 1.5km long and 30m wide.

There will be a new road worth nearly 200 billion VND in Thuong Tin district

|

Hanoi - The City People's Committee has just approved the investment policy to build a new road about 1.65km long in Van Diem commune, Thuong Tin district.

New road to pass through the VND14,000 billion project in Hanoi

|

Hanoi - Dan Phuong District will have a new route connecting to the extended Hoang Quoc Viet road, the section passing through the New Life Urban Area Project - Sunshine Grand Capital.

Official list of 51 wards of Hanoi after the merger

|

Hanoi City has 126 commune-level administrative units, including 51 wards and 75 communes after the arrangement and merger.

Drainage project is under construction, people in Thu Duc City suffer from bad roads and traffic jams

|

HCMC - The Nguyen Duy Trinh drainage project is under construction for a long time, causing the roads to be flooded, muddy, and congested during the rainy season, causing difficulties for people.

Iran fires more than 370 missiles at Israel, US diplomatic facility damaged

|

Iran's heavy missile attacks have caused heavy damage to Israel, and the US diplomatic facility in Tel Aviv has also been affected.

Permanent Vice President of the Vietnam General Confederation of Labor Thai Thu Xuong congratulates Lao Dong Newspaper

|

On the occasion of the 100th anniversary of the Vietnam Revolutionary Press (June 21,25 - June 21, 2025), on the afternoon of June 16, Permanent Vice President of the Vietnam General Confederation of Labor Thai Thu Xuong and a working delegation of the Vietnam General Confederation of Labor came to congratulate the collective of cadres, reporters and employees of Lao Dong Newspaper.

The reason why People's Artist Tu Long apologized to the audience after 6 nights of performance

|

People's Artist Tu Long and many artists were choked up in emotion when witnessing the support of the audience for Call Me by Fire.

A new 30m wide road is about to be built in Dan Phuong district

KHÁNH AN |

Hanoi - The road under the investment project to build a road from Tien Tan dike to Dan Phuong Kindergarten is about 1.5km long and 30m wide.

There will be a new road worth nearly 200 billion VND in Thuong Tin district

KHÁNH AN |

Hanoi - The City People's Committee has just approved the investment policy to build a new road about 1.65km long in Van Diem commune, Thuong Tin district.

New road to pass through the VND14,000 billion project in Hanoi

KHÁNH AN |

Hanoi - Dan Phuong District will have a new route connecting to the extended Hoang Quoc Viet road, the section passing through the New Life Urban Area Project - Sunshine Grand Capital.