Toll collection for 13 North-South expressways invested by the State is coming soon

Minh Hạnh |

The Ministry of Construction approves the toll rates for 13 North-South expressways in the East in the period 2021 - 2025. This is the basis for implementing toll collection for expressways invested by the State.

The Ministry of Construction has just approved toll rates for 13 sections of the North-South Expressway in the East invested by the State. This is the basis for deploying toll collection on these expressways in the near future.

According to the decision of the Ministry of Construction, the toll rate is applied to vehicles traveling on sections of the North-South Expressway Construction Project in the East phase 2021 - 2025, including: Hoa Lien - Tuy Loan, Bai Vot - Ham Nghi, Ham Nghi - Vung Ang, Vung Ang - Bung, Bung - Van Ninh, Van Ninh - Cam Lo, Quang Ngai - Hoai Nhon, Hoai Nhon - Quy Nhon, Quy Nhon - Chi Thanh, Chi Thanh - Van Phong, Van Phong - Nha Trang, Can Tho - Hau Giang and Hau Giang - Ca Mau.

The Ministry of Construction assigns the Vietnam Road Administration to publicly disclose the collection level, collection method, subjects of fee payment, cases of exemption and reduction, and organize fee collection in accordance with the law on fees and charges.

Previously, the Vietnam Road Administration submitted to the Ministry of Construction for approval the toll level for using the expressway for the Hoa Lien - Tuy Loan route and sections of the North-South Expressway Project in the East phase 2021 - 2025.

According to the proposed plan, the expressway usage fee is on 13 sections of the route according to each route and vehicle group. The fee is calculated based on the actual travel distance of vehicles and collected entirely in the form of non-stop electronic toll collection (ETC).

Among the approved routes, the Van Phong - Nha Trang route has the highest maximum toll. With a length of 83.35km, the toll for group 1 vehicles is 32,625 VND/trip, while group 5 vehicles have to pay 130,500 VND/trip.

Some other routes with notable fees include: Bai Vot - Ham Nghi, 30,492km long, maximum fee from 13,774 - 55,094 VND; Ham Nghi - Vung Ang is 58,415km long, fees range from 23,136 - 100,544 VND; Vung Ang - Bung is 57,339km long, fees range from 27,063 - 108,252 VND.

For the Hoa Lien - Tuy Loan route, 11.472km long, the maximum toll for group 1 vehicles is 9,750 VND and for group 5 vehicles is 39,000 VND.

The remaining expressways such as Quang Ngai - Hoai Nhon, Hoai Nhon - Quy Nhon, Quy Nhon - Chi Thanh, Chi Thanh - Van Phong, Can Tho - Hau Giang and Hau Giang - Ca Mau are also applied corresponding tolls according to the length of the route and vehicle group.

Minh Hạnh
RELATED NEWS

Driver fined 13 million VND for stopping car on highway for passenger to go to the toilet

|

The traffic police force has just fined a passenger car driver for stopping vehicles on the highway to let passengers go to the toilet.

AI camera detects vehicles traveling at 126 km/h on Noi Bai - Lao Cai highway

|

The AI camera system of the Traffic Police Department records vehicles running 126 km/h on the Noi Bai - Lao Cai expressway and many traffic violations in Hanoi.

Today, the entire Long Thanh intersection is opened to connect highways

|

Dong Nai - It is expected that around 6 pm on June 6, all branches of Long Thanh intersection will be officially put into operation.

Overview of the 692 billion VND road connecting 2 expressways in Phu Tho

|

Phu Tho - The 2.7km longer route connecting Noi Bai - Lao Cai expressway with Tuyen Quang - Phu Tho expressway is in the process of being completed.

Experts warn of the risk of dehydration and heat shock in workers in the summer

|

According to experts, summer weather with high temperatures makes outdoor workers face the risk of dehydration, exhaustion and heat shock.

Sea of people" flock to the Perfume River bank to watch the opening of Hue International Music Week 2026

|

HUE - People and tourists enjoy special art performances on the opening night of Hue International Music Week 2026 by the Perfume River.

Clearing ground to implement the National Highway 6 upgrade project

|

Hanoi - Phu Nghia Commune People's Committee mobilizes maximum manpower and machinery to demolish the project, accelerating the progress of site clearance for the National Highway 6 upgrade project.

Live football Brazil vs Morocco at World Cup 2026

|

Live football match between Brazil and Morocco in Group C of the 2026 World Cup at 5:00 AM today (May 14).

Driver fined 13 million VND for stopping car on highway for passenger to go to the toilet

Tô Thế |

The traffic police force has just fined a passenger car driver for stopping vehicles on the highway to let passengers go to the toilet.

AI camera detects vehicles traveling at 126 km/h on Noi Bai - Lao Cai highway

Tô Thế |

The AI camera system of the Traffic Police Department records vehicles running 126 km/h on the Noi Bai - Lao Cai expressway and many traffic violations in Hanoi.

Today, the entire Long Thanh intersection is opened to connect highways

Hà Anh Chiến |

Dong Nai - It is expected that around 6 pm on June 6, all branches of Long Thanh intersection will be officially put into operation.

Overview of the 692 billion VND road connecting 2 expressways in Phu Tho

Bài và ảnh: Tô Công |

Phu Tho - The 2.7km longer route connecting Noi Bai - Lao Cai expressway with Tuyen Quang - Phu Tho expressway is in the process of being completed.