Preparing to auction more than 5,000m2 of land in Dong Anh, Hanoi

KHÁNH AN |

Hanoi - Of the total 11,342.1 square meters of land that Hanoi City has just transferred to Dong Anh District, there are more than 5,106 square meters of residential land for land use rights auction.

Vice Chairman of Hanoi People's Committee Nguyen Trong Dong has just signed a decision to hand over 11,342.1 square meters of land in Xuan Canh commune, Dong Anh district to Dong Anh district People's Committee to implement the project of building technical infrastructure for the land use rights auction area of ​​Van Loc 2 village.

The location, boundary, and area of ​​the land are determined in the master plan drawing, scale 1/500 of the project to build the land use rights auction area in Van Loc 2 village, Xuan Canh commune, Dong Anh district, prepared by Ngoc Minh Construction Investment Consulting Joint Stock Company.

Of the total 11,342.1m2 of land, 5,106m2 of residential land (including plots of land coded LK13 to LK16) is for auction of land use rights. The People's Committee of Dong Anh district is allocated land by the state without collecting land use fees. The land use term is according to the investment project implementation term as prescribed. The method of land allocation is land allocation through auction of land use rights to implement projects using land as prescribed in Article 125 of the 2024 Land Law.

With 6,236.1m2 of land for traffic, trees and connecting technical infrastructure (including plots of land with symbols CXNO, GT), the State allocates land without collecting land use fees; Dong Anh District People's Committee invests in building technical infrastructure synchronous with the common infrastructure of the area according to the approved planning and assigns it to the management unit according to regulations.

Hanoi People's Committee requests Dong Anh District People's Committee to organize the construction of technical infrastructure according to the approved investment project, ensuring the overall planning and synchronous connection of technical infrastructure and regional infrastructure.

Dong Anh District People's Committee is responsible for preparing and approving the master plan to ensure that there is no interleaved land area, and that land is used economically and effectively. Prepare a plan for auctioning land use rights and submit it to competent authorities for approval and organize auctions of land use rights in accordance with the procedures prescribed by the 2024 Land Law, the 2016 Property Auction Law, Decrees, Circulars guiding the implementation and current regulations of the city on auctions of land use rights to allocate land with land use fees or lease land in Hanoi, ensuring compliance with legal regulations, publicity, transparency and efficiency.

KHÁNH AN
RELATED NEWS

Live broadcast of the 2025 Victory Cup award ceremony

|

Live broadcast of the Victory Cup 2025 award ceremony taking place at 8:00 PM today (January 29).

Live football Nam Dinh vs Lion City at the C1 Southeast Asian Cup

|

The match between Nam Dinh Club and Lion City at the C1 Southeast Asian Cup 2025-2026, takes place at 7:30 PM today (January 29).

Information on the arrangement of newspapers and magazines of mass associations in the coming time

|

Information on arranging legal entities, including newspapers and magazines inside mass organizations, was raised by Ms. Ha Thi Nga at the press meeting at the beginning of Spring 2026.

Special envoy of Mr. Xi Jinping arrives in Vietnam to congratulate the success of the 14th Party Congress

|

Special envoy of General Secretary and President of China Xi Jinping visits Vietnam to convey congratulations on the success of the 14th Party Congress.

Suspected expired meat in schools: Have been inspected but no errors detected

|

Ho Chi Minh City - Regarding the reflection of suspected expired meat being put into schools, Hiep Phuoc Commune People's Committee said that Sago Food Company has been inspected and no violations have been detected.

Credit loan package broken, golden land project in Dak Lak turns into a rusty iron block

|

Dak Lak - Dak Lak Center project, with a total investment of hundreds of billions of VND, was abandoned into a rusty iron block because the bank unilaterally terminated the credit loan package contract.

Gasoline and oil prices simultaneously increase from 3 pm today, January 29

|

Gasoline and oil prices simultaneously increased from 3 pm today, January 29, after adjustments by the inter-Ministry of Industry and Trade - Finance.

The newly discovered Hai Su Vang oil field has great potential

|

Oil reserves discovered at block 15-2, which is the Hai Su Vang field, belonging to the Mekong basin, are being operated by Murphy Oil's subsidiary.

Chi tiết 11 ô đất chuẩn bị đấu giá ở quận Cầu Giấy, Hà Nội

KHÁNH AN |

Hà Nội - Năm 2025 quận Cầu Giấy dự kiến triển khai 22 dự án, trong đó, 7 dự án đấu giá quyền sử dụng 11 ô đất.

Chuẩn bị đấu giá hơn 3.800m2 đất ở tại Phú Xuyên, Hà Nội

KHÁNH AN |

Trong tổng diện tích 8.694,2m2 đất mà TP Hà Nội vừa giao cho huyện Phú Xuyên có 3.822m2 đất ở để quản lý, tổ chức đấu giá quyền sử dụng đất.

Một huyện ở Hà Nội chuẩn bị đấu giá hơn 11.000m2 đất ở

KHÁNH AN |

Trong tổng diện tích 19.727,5 m2 đất mà TP Hà Nội vừa giao cho huyện Thường Tín, có 11.066,7 m2 đất ở để quản lý, tổ chức đấu giá quyền sử dụng đất.