Preparing to auction more than 5,000m2 of land in Dong Anh, Hanoi

KHÁNH AN |

Hanoi - Of the total 11,342.1 square meters of land that Hanoi City has just transferred to Dong Anh District, there are more than 5,106 square meters of residential land for land use rights auction.

Vice Chairman of Hanoi People's Committee Nguyen Trong Dong has just signed a decision to hand over 11,342.1 square meters of land in Xuan Canh commune, Dong Anh district to Dong Anh district People's Committee to implement the project of building technical infrastructure for the land use rights auction area of ​​Van Loc 2 village.

The location, boundary, and area of ​​the land are determined in the master plan drawing, scale 1/500 of the project to build the land use rights auction area in Van Loc 2 village, Xuan Canh commune, Dong Anh district, prepared by Ngoc Minh Construction Investment Consulting Joint Stock Company.

Of the total 11,342.1m2 of land, 5,106m2 of residential land (including plots of land coded LK13 to LK16) is for auction of land use rights. The People's Committee of Dong Anh district is allocated land by the state without collecting land use fees. The land use term is according to the investment project implementation term as prescribed. The method of land allocation is land allocation through auction of land use rights to implement projects using land as prescribed in Article 125 of the 2024 Land Law.

With 6,236.1m2 of land for traffic, trees and connecting technical infrastructure (including plots of land with symbols CXNO, GT), the State allocates land without collecting land use fees; Dong Anh District People's Committee invests in building technical infrastructure synchronous with the common infrastructure of the area according to the approved planning and assigns it to the management unit according to regulations.

Hanoi People's Committee requests Dong Anh District People's Committee to organize the construction of technical infrastructure according to the approved investment project, ensuring the overall planning and synchronous connection of technical infrastructure and regional infrastructure.

Dong Anh District People's Committee is responsible for preparing and approving the master plan to ensure that there is no interleaved land area, and that land is used economically and effectively. Prepare a plan for auctioning land use rights and submit it to competent authorities for approval and organize auctions of land use rights in accordance with the procedures prescribed by the 2024 Land Law, the 2016 Property Auction Law, Decrees, Circulars guiding the implementation and current regulations of the city on auctions of land use rights to allocate land with land use fees or lease land in Hanoi, ensuring compliance with legal regulations, publicity, transparency and efficiency.

KHÁNH AN
RELATED NEWS

Lien Binh Phat made a miracle when he won the Best Actor award of Kim Chung

|

On the evening of October 18, Lien Binh Phat was officially named in the category of "Best Actor" at the Golden Bell Awards.

Hour 9: Cam Do - Part 2

|

Hour 9 No. 173 - The two were each other's first loves after many years of meeting again. Is their love this time complete?

Hanoi Traffic Police simultaneously check alcohol concentration, revealing two opposite attitudes of drivers

|

Hanoi - During the alcohol concentration test, some people happily complied, while others tried to avoid the request of the traffic police force.

Philippine beauty crowned Miss Grand International 2025

|

On the evening of October 18, Philippine Beauty - Emma Tiglao won the crown at the Miss Grand International 2025 final in Thailand.

Traffic congestion on National Highway 13 in the East of Ho Chi Minh City is about to end

|

HCMC - People in the East of HCMC are excited by the news that National Highway 13 will soon have a 4-lane and 10-lane elevated road, hoping that the traffic jam will soon end.

Road subsidence, Provincial Road 204A in Cao Bang is almost broken

|

Cao Bang - Provincial Road 204A has a section of road subsided, the road surface has sagging, almost broken.

Thailand, Singapore investigate Prince Group of scam boss Chen Zhi

|

Thailand and Singapore are reviewing financial relationships with Prince Group in Cambodia after Chen Zhi was accused by the US of running an online fraud empire.

The program "65 years of Vietnam - Cuba affection" touches the hearts of all Vietnamese people

|

On October 18, the Closing Ceremony of the Campaign to Support the Cuban People "65 years of Vietnam - Cuba" and the award ceremony and performance of the winning work of the Songwriting Campaign "Vietnam - Cuba, forever the song of solidarity and friendship" took place.

Chi tiết 11 ô đất chuẩn bị đấu giá ở quận Cầu Giấy, Hà Nội

KHÁNH AN |

Hà Nội - Năm 2025 quận Cầu Giấy dự kiến triển khai 22 dự án, trong đó, 7 dự án đấu giá quyền sử dụng 11 ô đất.

Chuẩn bị đấu giá hơn 3.800m2 đất ở tại Phú Xuyên, Hà Nội

KHÁNH AN |

Trong tổng diện tích 8.694,2m2 đất mà TP Hà Nội vừa giao cho huyện Phú Xuyên có 3.822m2 đất ở để quản lý, tổ chức đấu giá quyền sử dụng đất.

Một huyện ở Hà Nội chuẩn bị đấu giá hơn 11.000m2 đất ở

KHÁNH AN |

Trong tổng diện tích 19.727,5 m2 đất mà TP Hà Nội vừa giao cho huyện Thường Tín, có 11.066,7 m2 đất ở để quản lý, tổ chức đấu giá quyền sử dụng đất.