Da Nang calls for investment of VND1,800 billion for semiconductor laboratories

Nguyễn Linh |

The Da Nang Department of Finance invites to invest VND1,800 billion in the advanced packaging technology laboratory project for semiconductor microchips.

On May 11, the Da Nang Department of Finance announced that it had invited investors to participate in the Laborator project serving the production of advanced packaging technology for semiconductor microchips in Da Nang, with a total investment of VND1,800 billion. The project is proposed by VSAP LAB Joint Stock Company, expected to be built on an area of 2,298m2 at Software Park No. 2 (Thuan Phuoc Ward, Hai Chau District).

The project focuses on advanced packaging technology for semiconductor microchips, meeting the Politburo's Resolution No. 57 on scientific and technological development and Decision No. 1018 of the Prime Minister on the strategy of developing Vietnam's semiconductor industry until 2030, with a vision to 2050. At the same time, the project is in the project of developing semi -conductor and artificial intelligence of the city.

The laboratory will conduct research and development of technology in the field of semiconductor microchips and artificial intelligence, including research and development of high-tech electrical and electronic products. The project also provides inspection, product testing, installation, maintenance, consultation, training and technical solutions. With a capacity of 10 million products/year, the project hopes to promote production and provide high-tech services in the semiconductor sector.

The project is designed with 4 floors and a roof railing, with a total floor area of about 5,685 m2, with a synchronous technical infrastructure, including electricity, water, fire protection, communication, air conditioning, environmental control. The laboratory will be equipped with modern equipment such as wafer bonding, wire bonding, FOWLP, optical scanning, electrical plating, standard packaging, measurement and analysis (X-ray, SEM), and automatic testing (ATE).

The project has an operating period of 50 years, expected to be implemented from the second quarter of 2025 to the fourth quarter of 2026. Registration documents are received from May 10 to May 24.

Nguyễn Linh
TIN LIÊN QUAN

The Government urges the progress of Tuy Loan intersection managed by Da Nang

|

The Government is speeding up the progress of the Tuy Loan intersection project on the Da Nang - Quang Ngai Expressway.

Progress of key projects worth hundreds of billions of VND being implemented in Da Nang

|

Da Nang is simultaneously implementing many key projects from renovating the drainage system to building parks and hospitals.

Da Nang establishes a working group to research urban railways to Quang Nam

|

Da Nang City will study the construction of an urban railway line to Quang Nam, to promote traffic connectivity and socio-economic development of the two localities.

4 outstanding scientific works receive the Bao Son Award 2024

|

On the evening of May 11, the Vietnam Union of Science and Technology Associations in coordination with the Bao Son Education and Training Fund awarded prizes to 4 outstanding scientific works.

Singer Duy Manh withdraws lawsuit demanding Mercedes Vietnam to compensate 2.5 billion VND

|

Singer Duy Manh said that he withdrew the lawsuit against Mercedes-Benz Vietnam Company related to the fire of the S450 Luxury car despite previously asking the company for compensation of 2.5 billion VND.

Western tourists eat and sleep with chickens along the motorbike backpacking route in Ha Giang

|

Ha Giang - Video recording the moment a foreign tourist hugged a rooster while backpacking here in recent days received great attention.

Barcelona beat Real Madrid 4-3, close to La Liga championship

|

On the evening of May 11, Barcelona won 4-3 against Real Madrid in round 35 of La Liga 2024-2025.

Updated gold price at the end of session 11.5: Heavy losses when surfing

|

Updated gold price at the end of the session on January 11: Although domestic gold prices increased last week, buyers still suffered losses of 1.3 to 2.7 million VND/tael if they "surf".

The Government urges the progress of Tuy Loan intersection managed by Da Nang

Nguyễn Linh |

The Government is speeding up the progress of the Tuy Loan intersection project on the Da Nang - Quang Ngai Expressway.

Progress of key projects worth hundreds of billions of VND being implemented in Da Nang

Nguyễn Linh |

Da Nang is simultaneously implementing many key projects from renovating the drainage system to building parks and hospitals.

Da Nang establishes a working group to research urban railways to Quang Nam

Nguyễn Linh |

Da Nang City will study the construction of an urban railway line to Quang Nam, to promote traffic connectivity and socio-economic development of the two localities.