Waste treatment plant stops operating due to unpaid wages, un agreed operating unit price

Phúc Khánh - Bảo Lâm |

Lam Dong - More than 64,000 tons of waste are stagnant at Bao Loc Waste Treatment Plant due to problems with treatment unit prices and unpaid wages to workers.

On the afternoon of November 5, Mr. Than Nguyen Vinh Thang - Chief of Office of Bao Loc Ward 3 People's Committee said that the locality is coordinating with relevant units to remove difficulties and inadequacies at Bao Loc Waste Treatment Plant.

The fact that the plant has left more than 64,000 tons of waste behind for a long time poses a serious risk of environmental pollution. Currently, many areas in the waste treatment plant are stagnant, overgrown with weeds.

Thong ke so bo, hien tai dang co hon 64.000 tan rac u dong boc mui hoi thoi tai Nha may rac Bao Loc (thon 2, phuong 3 Bao Loc). Anh: Phuc Khanh
Preliminary statistics show that there are currently more than 64,000 tons of garbage accumulated at Bao Loc Waste Treatment Plant (village 2, Ward 3 Bao Loc). Photo: Phuc Khanh

According to the People's Committee of Bao Loc Ward 3, this situation is prolonged due to many reasons. In particular, the main reason is that the machinery system is old, often damaged and the long-term unpaid wages of workers have not been resolved.

In particular, the Bao Loc Construction Investment Project Management Board and Friendly Green Environment Joint Stock Company - the factory operator - have not yet agreed on a unit price for waste treatment.

Therefore, the factory has not been paid for expenses for many months, and has no funding to pay salaries.

Doc theo tuyen duong noi bo dai hang tram met vao Nha may dang tro thanh noi chua rac bat dac di. Anh: Phuc Khanh
Along the internal road hundreds of meters long to the factory is becoming a place for redundant garbage. Photo: Phuc Khanh

Up to now, Friendly Green Environment Joint Stock Company owes workers more than 2 billion VND in wages. Due to unpaid wages, many workers have quit their jobs.

Before proposing to return to work, workers asked the company to advance at least 800 million VND before returning to work. On November 5, the company temporarily paid 300 million VND, committing to pay the remaining amount as soon as possible.

The leader of Bao Loc Ward 3 said that the Ward Union will step in to protect the legitimate rights of workers.

On the same day, the Department of Agriculture and Environment of Lam Dong province worked with the People's Committee of Bao Loc Ward 3 to find a solution to remove difficulties for the factory.

Nui rac u dong khien nuoc thai chay tran gay o nhiem moi truong. Anh: Phuc Khanh
The mountain of garbage stagnates, causing wastewater to overflow, polluting the environment. Photo: Phuc Khanh

Mr. Le Dinh Trong, Chairman of the Board of Directors of Friendly Green Environment Joint Stock Company, said that the company is investing in a new large-capacity machinery separator and incinerator system, expected to increase processing capacity to 600 tons/day and night, instead of more than 150 tons as before.

From April 2024 to now, the unit price for waste treatment has continuously changed, from 453,000 VND/ton to 136,000 VND/ton, currently temporarily applying the level of 300,000 VND/ton but only 75% is paid.

Mr. Trong said that regular changes in unit prices have greatly affected waste treatment efficiency, and at the same time recommended that the authorities reconsider unit prices to better suit the reality.

Phúc Khánh - Bảo Lâm
RELATED NEWS

Close-up of the garbage mountain of more than 64,000 tons at risk of causing serious pollution in Lam Dong

|

Lam Dong - Bao Loc waste treatment plant is stuck with more than 64,000 tons of waste, as high as a mountain, posing a potential risk of serious pollution in the surrounding area.

Difficulty solving the problem of waste treatment in Ninh Binh

|

Ninh Binh province is oriented to become a centrally-governed city - a world heritage city by 2030. However, the pressure from treating thousands of tons of household waste every day is becoming a "bottleneck" for the locality's green growth target.

Many landfills and waste treatment sites in Ninh Binh province are overloaded

|

Ninh Binh - Hundreds of tons of waste are generated every day, while the treatment capacity is not yet available, which causes many landfills to be overloaded.

Heavy rain combined with high tides, many roads in Ho Chi Minh City submerged in water

|

HCMC - On the evening of November 5, due to the impact of heavy rain combined with high tides, a series of roads in HCMC were submerged in water.

Russia tightens hold, calls on Ukrainian forces in Pokrovsk to join

|

Russia said Ukrainian forces were surrounded in two key cities and had no way out.

Many projects and works "left alone and suffered a miserable life" cause huge waste

|

Delegate To Thi Bich Chau stated that in reality, there are many projects and works that have lasted for many years, "leaving the whole liver and the whole moon" causing huge waste.

Experts predict that gold prices may increase by 1,000 USD/ounce

|

Gold prices are expected to continue a strong upward trend next year, with the next major fluctuation possibly pushing prices up by about 1,000 USD/ounce.

Live football Nam Dinh 0-1 Gamba Osaka at: Round 2

|

Live match between Nam Dinh and Gamba Osaka in AFC Champions League Two 2025-2026, taking place at 7:15 p.m. today (November 5).

Bắt đối tượng mang 300g ma túy từ Đồng Nai lên Lâm Đồng tiêu thụ

Phúc Khánh - Văn Hữu |

Lâm Đồng – Duyên mang túy từ Đồng Nai lên phường B’Lao thuê khách sạn để giao dịch thì bị các trinh sát Công an Lâm Đồng ập vào khống chế bắt giữ.

Close-up of the garbage mountain of more than 64,000 tons at risk of causing serious pollution in Lam Dong

Phúc Khánh |

Lam Dong - Bao Loc waste treatment plant is stuck with more than 64,000 tons of waste, as high as a mountain, posing a potential risk of serious pollution in the surrounding area.

Công an Lâm Đồng bắt giữ thanh niên 19 tuổi thay tên đổi họ, lẩn trốn truy nã

Phúc Khánh |

Lâm Đồng – Sau thời gian bỏ trốn và bị cơ quan điều tra truy nã về tội tổ chức sử dụng trái phép chất ma túy, Nguyễn Văn Long đã bị cơ quan công an bắt giữ.

Difficulty solving the problem of waste treatment in Ninh Binh

NGUYỄN TRƯỜNG |

Ninh Binh province is oriented to become a centrally-governed city - a world heritage city by 2030. However, the pressure from treating thousands of tons of household waste every day is becoming a "bottleneck" for the locality's green growth target.

Many landfills and waste treatment sites in Ninh Binh province are overloaded

NGUYỄN TRƯỜNG |

Ninh Binh - Hundreds of tons of waste are generated every day, while the treatment capacity is not yet available, which causes many landfills to be overloaded.