Photo

Female track and field athlete crawls to the finish line at the National Marathon Championship

|

Female athlete Hoang Thi Ngoc Hoa suddenly fell but still strained herself to crawl across the finish line at the National Marathon Championship - Tien Phong Newspaper 2026.

Project of over 31,200 billion VND in Can Tho lacks millions of cubic meters of sand

|

Can Tho - The Chau Doc - Can Tho - Soc Trang expressway project is facing a shortage of materials as the amount of sand brought to the construction site does not meet construction needs.

Overview of the repair site of the Lo River bridge pier that once had bare steel reinforcement

|

Phu Tho - The Lo River bridge in Doan Hung commune was damaged, the bridge pier once had bare steel reinforcement and is now being urgently repaired by the construction unit.

Striker Xuan Son and weight issues

|

Xuan Son's physical condition and weight became the focus when coach Kim Sang-sik frankly said that this striker has not reached his best form.

Workers work through noon to push forward the high-speed railway resettlement project in Hue

|

HUE - Workers work in the sun through noon, taking advantage of favorable weather to accelerate construction, ensuring the progress of the high-speed railway resettlement project.

Hanoi: Wood factory fire, after 4 hours smoke and fire still billowing

|

On the afternoon of December 29, a large fire broke out at several factories in Lien Ha craft village (Dan Phuong, Hanoi).

Colorful Mong ethnic culture in Dien Bien

|

Dien Bien - In the jubilant atmosphere of welcoming the New Year, thousands of tourists joined in the Mong ethnic cultural festival in the highlands.

Colorful Ninh Kieu flower lanterns before the opening ceremony

|

Can Tho - The festive atmosphere is filling Ninh Kieu wharf, ready for the opening program of the Tourism Festival - Ninh Kieu Lantern Night, Can Tho on the evening of December 30.

Current status of the urban area to be built on the prime land of Nguyen Trai

|

After many times Hanoi City urged the relocation of a series of factories on prime land on Nguyen Trai Street, up to now, three factories have completed their relocation from the inner city.

People cover a newly expanded lane in Hanoi with tarpaulins

|

Hanoi - Before the traffic reorganization, the two newly expanded lanes under the Cat Linh - Ha Dong elevated railway were still very chaotic.

Hundreds of trucks carrying rocks in Tuyen Quang destroy residential roads

|

Tuyen Quang - Hundreds of heavy trucks carrying rocks every day plow through and destroy residential roads in Ham Yen district, causing people to live in constant fear.

Huge waves destroyed houses in Nhat Tri islet, Nha Trang

|

Khanh Hoa - People living on Nhat Tri islet in Nha Trang have suffered heavy damage due to high tide erosion.

Admire the 300-year-old twin longan trees in Nam Dinh

|

Nam Dinh - On both sides of Van Chi temple (Van Loc village, old Xuan Phong commune, now Xuan Giang commune, Xuan Truong district) are famous for a pair of ancient longan trees that are green all year round.

Cars stalled en masse due to deep flooding after heavy rain

|

HCMC - Heavy rain on the evening of December 28 caused many roads to be deeply flooded, and many vehicles to stall.

On the large highway construction site at the end of the year

|

Can Tho - At the Can Tho section of the highway construction site, there is always the bustling sound of machinery and workers working in the last days of 2024.

Vietnam team "hides cards" before the second leg of the ASEAN Cup semi-finals

|

The Vietnamese team had an official training session at Viet Tri Stadium (Phu Tho), before the second leg of the ASEAN Cup semi-final against the Singapore team.

The largest stadium in the northern mountainous region at the finish line

|

After more than 2 years of construction, the Thai Nguyen stadium project with an investment capital of more than 500 billion VND is entering the final stage and is preparing for completion.

People flocked to queue up to experience Metro Line 1

|

HCMC - On the morning of December 28, thousands of people flocked to the stations of Metro Line 1 to experience this new form of public transport.

Discovering a relic cluster over 4 centuries old in Thuy Nguyen, Hai Phong

|

Hai Phong - With a history of more than 400 years, Tay communal house (Thuy Nguyen, Hai Phong) is recognized as a national monument because of its architecture typical of ancient Vietnamese communal houses.

Metro No. 1 resumes operation, Ben Thanh station is crowded with passengers

|

HCMC - Metro Line 1 resumed operations after an electrical safety system failure triggered by lightning, passengers lined up at Ben Thanh station waiting for the train.