Photo

People flock to the airport near Tet, Noi Bai enters peak season

|

Hanoi - Ahead of the Binh Ngo Lunar New Year 2026, Noi Bai International Airport recorded a sharp increase in domestic and international travel demand.

Tet is coming to every small alley in Hanoi, people line up to buy traditional braised fish

|

In the last days of the year, Hanoi puts on a new coat. Tet is present from the big red streets to the small alleys fragrant with braised fish, pickled vegetables, creeping into the market rhythm, carrying street vendors.

Spring in the Detention Center in Can Tho

|

Can Tho - Spring spreads in Can Tho Detention Center, bringing a warm and humane Tet atmosphere to prisoners.

Quang An flower market bustling in the days leading up to the Binh Ngo Lunar New Year 2026

|

Hanoi - Dao Nhat Tan taking to the streets has attracted people in the Capital at Quang An flower market (Tay Ho district), bringing a close-up Tet atmosphere.

Solemn Rewarding Ceremony in Hue Imperial Palace

|

HUE - The Thuong Tieu ceremony, the Neu tree erecting ceremony to announce the Lunar New Year, was solemnly held at the Hue Citadel, attracting a large number of tourists.

Churches in Ho Chi Minh City are brightly lit, people check in early

|

HCMC - Before Christmas 2024, many churches in HCMC are decorated with lights and colorful flowers, attracting people and tourists to visit and take photos.

Series of projects create a new look in Muong Pon flood center

|

Nearly 5 months after the historic flash flood in Muong Pon commune, Dien Bien district, Dien Bien province, a series of constructions are springing up on old land.

T-90 tanks of the Vietnamese army at the Defense exhibition

|

Two versions of the T-90 tank of the Vietnam People's Army appeared at the Vietnam International Defense Exhibition 2024, including the T-90SK command version.

Start drilling and breaking the road surface on the remaining Phong Chau bridge section

|

Phu Tho - Truong Son Construction Corporation is drilling and breaking the road surface on the remaining Phong Chau bridge section in Phung Nguyen commune, Lam Thao district.

Bustling scene of moving garbage dump blocking Can Tho - Ca Mau highway

|

Can Tho – Following the Prime Minister’s direction, the construction of the landfill site blocking the Can Tho - Ca Mau expressway is being urgently accelerated.

Vehicles stall en masse due to deep flooding in a district on the outskirts of Ho Chi Minh City

|

HCMC - A series of vehicles stalled while driving through a flooded road due to high tides in Nha Be district on the evening of December 17.

Clearing a series of encroaching factories in Den Lu III resettlement area

|

On December 17, the functional forces of Hoang Van Thu ward coordinated with Hoang Mai district to enforce the illegal encroachment of land at Den Lu III resettlement area.

The vital bridge on Highway 3 is about to open to traffic

|

After more than 2 years of construction, the vital bridge on National Highway 3 connecting Thai Nguyen - Hanoi is about to open to traffic.

Aircraft, military dogs on display at Defense Exhibition

|

A squadron of SU-30MK2 fighter jets and helicopters carrying the national flag will fly in welcome at the opening ceremony of the Vietnam International Defense Exhibition 2024.

12 years of building Metro Line 1 and memorable milestones

|

Ho Chi Minh City - Metro Line 1 (Ben Thanh - Suoi Tien) will officially operate on December 22, 2024, concluding a 12-year construction journey with many memorable milestones.

Streets in Ho Chi Minh City flooded when the tide peaked

|

Continuous high tides on December 15-16 caused many roads in Ho Chi Minh City to be flooded, affecting people's travel.

Clearing illegal parking lots to build schools in the most populous ward of Hanoi

|

The huge illegal parking lot located on two plots of land TH3 and NT3 in the Linh Dam Lake service and housing complex (Hoang Liet, Hoang Mai, Hanoi) has just been cleared.

Racing against time to open the only road connecting Nha Trang - Da Lat

|

Khanh Hoa - Dozens of staff and mechanical equipment have been deployed to Khanh Le Pass to blast rocks and clear the road, determined to connect the road from Nha Trang to Da Lat.

On the demolition site of the remaining Phong Chau bridge

|

Phu Tho - The construction unit is implementing many measures to dismantle the remaining Phong Chau bridge, while preparing for the construction of a new bridge.

Hundred billion dong embankment in Thai Nguyen is about to be completed

|

Thai Nguyen - The embankment to prevent landslides on Cong River through Dai Tu district with an investment capital of hundreds of billions of VND is gradually taking shape after nearly 1 year of construction.