Prime Minister cuts ribbon to inaugurate new Phong Chau Bridge

Tô Công |

On the morning of September 28, Prime Minister Pham Minh Chinh attended and cut the ribbon to inaugurate the new Phong Chau bridge - National Highway 32C, Phu Tho province.

The new Phong Chau bridge project is about 652.88m long. Starting point from Km0+00 (about Km21+50.0/National Highway 32C avoiding the old Viet Tri city), in Phung Nguyen commune, Phu Tho province; ending point Km0+652.88 (about Km18+551.4/National Highway 32C), in Van Xuan commune, Phu Tho province.

Of which, the length of Phong Chau bridge is about 383.3m (to the end of the abutment); the road section at both ends of the sliding bridge connecting to the existing road on the Phung Nguyen commune side is about 113.8m; on the Van Xuan commune side is about 155.78m.

Thu tuong Pham Minh Chinh du Le khanh thanh cong trinh cau Phong Chau moi tai Phu Tho sang ngay 28.9. Anh: Tung Vy.
Prime Minister Pham Minh Chinh attended the inauguration ceremony of the new Phong Chau bridge project in Phu Tho on the morning of September 28. Photo: Tung Vy.
Khu vuc to chuc le khanh thanh tai dau cau phia xa Phung Nguyen, tinh Phu Tho. Anh: To Cong.
The area where the inauguration ceremony was held at the bridgehead on the Phung Nguyen commune side, Phu Tho province. Photo: To Cong.

During the project construction process, the contractor appointed as Truong Son Construction Corporation has upheld the highest sense of responsibility, developed a scientific and detailed construction plan and plan; mobilized enough human resources, financial resources, and modern machinery to focus on organizing the construction of "3 shifts" and "4 teams".

As a result, the investment project to build the new Phong Chau bridge - National Highway 32C, Phu Tho province was built according to the Emergency Construction Order and was completed within 9 months, 3 months shorter than the contract.

Dai tuong Phan Van Giang - Uy vien Bo Chinh tri, Bo truong Bo Quoc phong den tham du le khanh thanh. Anh: Ngoc Phuc.
General Phan Van Giang - Politburo member, Minister of National Defense attended the inauguration ceremony. Photo: To Cong.

It is expected that the project will be completed with a total cost of about 438.796 billion VND, an excess of nearly 196.6 billion VND compared to the total investment, an excess of more than 361.2 billion VND compared to the Prime Minister's Capital allocation Decision (800 billion VND).

The remaining capital after this construction is being proposed by the Ministry of Construction to be used to invest in upgrading and expanding the road connecting the new Phong Chau bridge with the inter-regional road, about 5km long, level III road standards, with a total estimated investment of about 150 billion VND, implementation period from 2025 - 2027.

Thu tuong Pham Minh Chinh, Dai tuong Phan Van Giang cung cac lanh dao, dai bieu thuc hien nghi thuc gan bien cau Phong Chau. Anh: Duc Hoang.
Prime Minister Pham Minh Chinh, General Phan Van Giang and leaders and delegates performed the ceremony of attaching the Phong Chau bridge sign. Photo: Duc Hoang.

Also on the morning of September 28, many people in Phu Tho province came to watch the inauguration ceremony, everyone was delighted when an important traffic project was opened to traffic and put into use after many months of waiting since the old bridge collapsed on September 9, 2024.

Dong dao va con nhan dan da tap trung tai khu vuc to chuc le khanh thanh. Anh: To Cong.
A large number of people gathered at the inauguration ceremony area. Photo: To Cong.

Mr. Tran Van Hieu - a resident of Xuan Lung commune, Phu Tho province (Xuan Huy commune, old Lam Thao district) - excitedly said: "Our people have been waiting every day for the new Phong Chau bridge to open to traffic, from last night to the inauguration ceremony this morning as if opening a festival, no project has ever made everyone so interested and looking forward to it".

Toan canh cau Phong Chau moi. Anh: To Cong.
Panorama of the new Phong Chau bridge. Photo: To Cong.

The invested project has promptly handled the collapse of the old Phong Chau bridge on National Highway 32C, ensuring urgency, quickly resolving traffic disruptions, overcoming the consequences of storms and floods; promptly connecting the traffic network in the area, creating favorable conditions for people to travel across both sides of the river; supporting socio-economic development, ensuring national defense and security in the area.

Tô Công
RELATED NEWS

Tomorrow, September 28, the new Phong Chau bridge will be inaugurated

|

Phu Tho - A stage has been set up to celebrate the inauguration of the new Phong Chau bridge, making people even more excited.

People count the days waiting for Phong Chau bridge to open to traffic

|

Phu Tho - In about a week, the new Phong Chau bridge across the Red River will officially open to traffic, meeting the people's expectations.

The story of the 9th crew member who was lucky to survive the ship's accident in Quang Tri

|

Quang Tri - When the boat sank, the 3-year-old crew member (from An Giang province) plunged into the sea and then clung to the buoy. When the waves dropped him off the buoy, he swam to shore and was rescued in time.

The two state-owned aviation giants have changed positively but still face many challenges

|

The two largest airlines, Vietnam Airlines and ACV, both recorded strong recoveries, but still faced many financial and cost challenges.

Overcoming floods to bring 2 pregnant women to the hospital

|

Quang Tri - During the flood caused by storm No. 10, Ta Put Commune Police promptly supported and brought the two mothers who overcame the flood to a medical facility safely.

Europe faces the risk of paying a heavy price for trying to shoot down Russian fighters

|

Russian Foreign Minister Sergei Lavrov has issued a series of strong warnings to the West and the US about the intention to attack Moscow.

How did the Vice Principal explain the incident to prevent students from being suspected of being poisoned from going to the hospital

|

Quang Tri - Ms. Do Thi Hong Hue, Vice Principal of a school where students were suspected of being poisoned, said that preventing students from going to the hospital was to wait for a car to transport them instead of a motorbike.

Green trees fell on a car in Da Nang, 6 people trapped were rescued

|

Da Nang - A tree fell and crushed a car at the Phan Hanh Son - An Duong Vuong intersection, 6 people trapped were rescued safely by the Fire Prevention and Rescue Police.

Tomorrow, September 28, the new Phong Chau bridge will be inaugurated

Tô Công |

Phu Tho - A stage has been set up to celebrate the inauguration of the new Phong Chau bridge, making people even more excited.

People count the days waiting for Phong Chau bridge to open to traffic

Tô Công - Trọng Tùng |

Phu Tho - In about a week, the new Phong Chau bridge across the Red River will officially open to traffic, meeting the people's expectations.

Trên công trường dự án đường liên vùng 2.120 tỉ đồng kết nối cầu Phong Châu

Tô CÔng |

Phú Thọ - Dự án đường liên vùng 2.120 tỉ đồng đang thi công tuyến đường kéo dài từ Km0 đến Quốc lộ 32, gần khu vực cầu Phong Châu.