Permanent insecurity on temporary bridges in the heart of Hanoi

Nguyễn Linh - An Phương |

Hanoi - Every day, thousands of people around the Lu River have to bet their lives on the aging, seriously degraded iron bridges.

Nguyễn Linh - An Phương
TIN LIÊN QUAN

Bridge on the billion-dollar road in Hanoi re-constructed in September

|

Hanoi - L3 bridge over Lu river - a package of the Ring Road 2.5 project, Dam Hong - National Highway 1A section, will resume construction in September after many years of suspension.

People suffer from traffic, roads in Hanoi have not yet set a date for repair

|

Hanoi - Nguyen Canh Di Street has been degraded, with many "elephant and chicken cages" that have become a nightmare for many years for people and vehicles.

To Lich River less odor, Hanoi residents stop holding their breath when passing

|

Hanoi - Once a deadly river that forces people to hold their breath every time it passes, the To Lich River is having its first positive changes.

Close-up of the sinking hole that almost "swallowed" SH on the central route of Hanoi

|

Hanoi - A sinkhole appeared on Truong Chinh Street, almost "swallowing" the SH.

A director died in a mine in Cao Bang

|

Cao Bang - A Director of mangan mine in Cao Bang died of suspected suffocation.

Foreign investors expect stocks to reach 1,800 points

|

With a low valuation level and positive investor sentiment, the stock market may continue to increase in the coming time.

Caught 1 of 2 crocodiles discovered in Hoi Canal in Ca Mau

|

Ca Mau - People discovered 2 crocodiles under Hoi Canal, Khanh Binh Commune. The local government has arrested 1 child and is continuing to search for the remaining child.

The search team for the victim of a sunken cruise ship wants to return the money transferred by someone with 50 million VND

|

Quang Ninh - Rescue Team 116 hopes to send back the person transferring 50 million VND, as the team is searching for victims of the tourist boat incident in Ha Long Bay.

Bridge on the billion-dollar road in Hanoi re-constructed in September

HỮU CHÁNH |

Hanoi - L3 bridge over Lu river - a package of the Ring Road 2.5 project, Dam Hong - National Highway 1A section, will resume construction in September after many years of suspension.

People suffer from traffic, roads in Hanoi have not yet set a date for repair

HỮU CHÁNH |

Hanoi - Nguyen Canh Di Street has been degraded, with many "elephant and chicken cages" that have become a nightmare for many years for people and vehicles.

To Lich River less odor, Hanoi residents stop holding their breath when passing

Nguyễn Linh - An Phương |

Hanoi - Once a deadly river that forces people to hold their breath every time it passes, the To Lich River is having its first positive changes.