The early season of Northwest Ban flowers "captivates" Hanoians

Việt Anh - Hoàng Xuyến |

These days, the rows of white Bauhinia trees along Hoang Dieu Street (Ba Dinh, Hanoi) have bloomed. The pristine beauty of the Northwest flower has attracted many people.

Việt Anh - Hoàng Xuyến
TIN LIÊN QUAN

Reasons for the fierce fire of a gasoline tank truck on the highway

|

The authorities have determined the initial cause of the fire of a gas tank truck on the Noi Bai - Lao Cai Expressway, passing through Yen Bai province.

There is still 1 month left to hand over enough land to expand Tam Trinh Street

|

Hanoi - Hoang Mai District scheduled to hand over enough land to expand Tam Trinh Street on April 30. Thus, there is 1 month left for the locality to complete this target.

3 unfinished BT projects of Phuc Son Group in Khanh Hoa

|

Phuc Son Group currently has 3 BT (build - transfer) projects in Nha Trang, of which only the Ngoc Hoi Intersection project has determined the construction roadmap. The remaining two projects are currently on hold due to legal problems.

Forecast of changes in La Nina and weather in the summer of 2025

|

The impact of La Nina is forecast to affect the weather in the summer of 2025.

HCMC will expand National Highway 13 to accommodate 10 lanes connecting Binh Duong

|

The Chairman of the Ho Chi Minh City People's Committee assigned the project preparation task, the investor of the project to expand National Highway 13 (from Binh Trieu Bridge to the border of Binh Duong province) to 60 m, accommodating 10 lanes.

Gold prices increase sharply, Germanyans worry about gold reserves in the US

|

In the context of the continuous increase in gold prices, Germans are starting to worry about more than 110 billion euros in gold reserves in the US.

Apartment residents in Ho Chi Minh City check houses after earthquake in Myanmar

|

HCMC - After the earthquake in Myanmar, many HCMC residents are worried, proactively checking their homes and assessing their safety level.

Hanoi begins construction of nearly VND2,400 billion intersection

|

Hanoi - The project of the different level of the intersection between Ring Road 3.5 and Thang Long Avenue, with an investment capital of nearly VND 2,400 billion, has begun construction.

Đường nghìn tỉ ở Hà Nội "khựng" lại trước vạch đích

HỮU CHÁNH |

Hà Nội - Dự án đường nghìn tỉ ở Hoài Đức đạt 80% tiến độ nhưng tạm ngừng thi công do vướng mắc giải phóng mặt bằng.

Mùa hoa ban tô sắc màu Tây Bắc giữa lòng thủ đô

Hương Chi |

Cứ đến cuối tháng 2 đầu tháng 3, khi Hà Nội tạm biệt những cơn gió lạnh tê tái và màu trời bàng bạc trầm lặng của mùa Đông cũng là lúc nhiều con đường Thủ đô xuất hiện sắc hồng tím mộng mơ của hoa ban.

Thổn thức ngắm hoa ban Tây Bắc bung nở khắp Hà Nội

Linh Boo |

Một mùa hoa ban nữa lại đến, những hàng cây ban bung nở trên nhiều tuyến phố tạo nên cảnh sắc mùa xuân thơ mộng giữa lòng Thủ Đô.