Bac Ninh urgently overcomes landslides on Ngu Huyen Khe riverbank

Vân Trường |

Bac Ninh - Vice Chairman of the Provincial People's Committee Ngo Tan Phuong has just inspected the situation of overcoming the landslide incident on the Ngu Huyen Khe river bank.

Due to the impact of storm No. 10 and the widespread heavy rain, in Tien Du commune, there have been 3 landslides on Ngu Huyen Khe river in Vinh Phuc, An Phu, Gioi Te villages with a total length of about 110m and 1 leak at An Phu pumping station.

Faced with the above situation, Tien Du commune promptly grasped the current situation and proposed solutions to handle the placement of warning signs in dangerous areas, mobilizing 60 people from the shock force, 950 bamboo trees, 20,000 sacks, 365m3 of soil, 6 transport vehicles, 2 excavators... to urgently handle the incident according to the "4 on-site" motto.

At the same time, arrange a standing force, send professional staff to closely monitor areas at risk of further landslides to have a handling plan, ready for further response.

After listening to the commune's report and directly inspecting the landslides, Vice Chairman of the People's Committee of Bac Ninh province Ngo Tan Phuong highly appreciated the proactive spirit of the Party Committee and government of Tien Du commune in mobilizing human resources, materials, and means to promptly handle and respond to the landslide incident on the Ngu Huyen Khe riverbank caused by storms.

Emphasizing that in the coming time, Bac Ninh province will continue to be susceptible to heavy rains caused by storms and tropical depressions, Mr. Ngo Tan Phuong requested Tien Du commune to urgently mobilize all forces, materials and means to promptly overcome and handle landslides on the Ngu Huyen Khe river bank by October 4.

Review the reserve funds at the commune level to handle landslides, if they do not meet the request of the province to arrange funds from the provincial Natural Disaster Prevention Fund according to regulations.

Proactively coordinate with relevant departments and branches to continue reviewing and promptly detecting incidents related to dykes, irrigation works, and residential areas prone to flooding.

From there, develop and deploy solutions and timely remedial measures to ensure the safety of people's lives and property, essential infrastructure and agricultural production in the area.

Vân Trường
RELATED NEWS

Progress of Aeon Commercial Center project worth nearly VND4,000 billion in Bac Ninh

|

Bac Ninh - The Aeon shopping mall project is expected to start construction on December 19, 2025 - the occasion of the 14th National Congress of the Party.

Bac Ninh has an additional social housing project with a scale of 1,000 apartments

|

Bac Ninh - The social housing project located in Tan Tien ward consists of 2 buildings with 19 floors and 17 floors.

High-rise house fire in Hanoi, many people ran to the upper floors to escape

|

Hanoi - The fire broke out at a high-rise house in Thanh Liet ward.

Truck overflows into bridge, headed into river on National Highway 28

|

Lam Dong - Truck hit the guardrails in the middle of National Highway 28 and then crashed into a bridge, headed into the river.

Strange and rare animals continuously appear in Cao Bang

|

Cao Bang is continuously recording the appearance of rare animals, even species that are unfamiliar to the natural environment of Vietnam.

The Politburo requests that people not lack food and medicine after storm No. 10

|

Overcoming the consequences of storm No. 10, the Politburo requires that people not lack food, clean water, medicine, or housing.

Progress of Aeon Commercial Center project worth nearly VND4,000 billion in Bac Ninh

Vân Trường |

Bac Ninh - The Aeon shopping mall project is expected to start construction on December 19, 2025 - the occasion of the 14th National Congress of the Party.

Có những dự án nhà ở xã hội nào tại phường Võ Cường, tỉnh Bắc Ninh?

Trần Tuấn |

Bắc Ninh - Bạn đọc gửi câu hỏi về các dự án nhà ở xã hội tại phường Võ Cường và cách thức đăng ký mua.

Bac Ninh has an additional social housing project with a scale of 1,000 apartments

Trần Tuấn |

Bac Ninh - The social housing project located in Tan Tien ward consists of 2 buildings with 19 floors and 17 floors.