additives under metro tunnels in Hanoi continue to spray

Thế Kỷ |

Hanoi - Recorded at more than 10:00 p.m. on February 20, additives under the Nhon - Hanoi Railway Station metro tunnel continued to spray at many locations.

At more than 10:00 p.m. on February 20, the reporter recorded at Lane 7 Giang Van Minh (Ba Dinh District, Hanoi), the additive under the Nhon - Hanoi Railway Station metro tunnel continued to spray strongly.

Accordingly, in many locations, such as along the drainage culverts in the alley, drainage culverts in the yard of houses... the yellow foam, accompanied by smoke continues to rise from the ground, quickly spreading throughout the alley, with an unpleasant smell.

Vi tri phun len manh nhat. Anh: The Ky
The location of strongest spraying. Photo: The Ky
Goc tuong mot nha dan co hien tuong phun chat phu gia len (khoanh do), vi tri gan cong thoat nuoc. Anh: The Ky
The corner of a house has the phenomenon of spraying additives from the metro tunnel up (circulared into red), located near the drainage culvert. Photo: The Ky

At the scene, people were on standby to prevent the substance from flooding into the house. The investor's person was also present, taking tarpaulins to cover the locations where the additive was sprayed.

"We can't sleep tonight, we just have to park our vehicles in neighboring alleys to prevent the substance from spreading into our homes," said Ms. Le Thu - a resident in alley 7 Giang Van Minh.

Image of a substance from the Nhon - Hanoi Railway Station metro tunnel issued on the night of February 20. Video: The Ky

Previously, the Hanoi Urban Railway Project Management Board (MRB) informed that at around 4:00 p.m. on February 20, during the digging process of the TBM 1 machine, the Nhon - Hanoi Railway Station metro tunnel addition began to spray on the ground, in the area of lane 7 Giang Van Minh.

The initial cause was determined to be that there may be underground wells or old drainage culverts that have created a path for tunnel borers to flow up to the ground (these old wells and culverts are no longer in use).

MRB is closely coordinating with relevant units to accurately assess the cause and deploy technical measures to prevent similar incidents in the next phase.

Thế Kỷ
TIN LIÊN QUAN

Hanoi metro tunnel underpass, tunnel drilling accessories float to the ground

|

On the evening of February 20, the Hanoi Urban Railway Management Board informed about the phenomenon of tunnel excavation and spraying on the ground at the Hanoi Metro tunnel drilling project.

Close -up of the train running in the tunnel of Metro Nhon - Hanoi Station

|

The train is considered a "transport blood vessel" in the tunnel, helping the TBM tunnel to operate continuously and ensure the progress of the Metro Nhon - Hanoi Station project.

Inside the tunnel where the "Speed" TBM is on duty

|

The TBM tunnel boring machine named "Than toc" of the Nhon - Hanoi station metro project has drilled more than 980m of tunnel.

8-lane road in Hanoi after traffic light adjustment

|

The Tran Huu Duc - Trinh Van Bo road (Nam Tu Liem district, Hanoi) has had its traffic light signal adjusted after a persistent traffic jam.

VFF admits mistakes of the referee in the match between Ho Chi Minh City and Thanh Hoa

|

The Vietnam Football Federation (VFF) has officially informed about the control of the match between Ho Chi Minh City and Thanh Hoa in round 11 of V.League 2024-2025.

Dien Bien suddenly has hail

|

On the afternoon of February 21, some localities in Dien Bien province had widespread thunderstorms, many areas experienced hail.

List of self-employed companies of large securities companies

|

The self-made list of stock giants in 2024 reflects the adjustment in investment strategies, aiming to optimize profits and control risks.

Champions League 1/8 draw results: Liverpool vs PSG

|

Results of the draw for matches in the round of 16, quarter-finals and semi-finals of the Champions League 2024-2025.

Hanoi metro tunnel underpass, tunnel drilling accessories float to the ground

Anh Tuấn - Tô Thế |

On the evening of February 20, the Hanoi Urban Railway Management Board informed about the phenomenon of tunnel excavation and spraying on the ground at the Hanoi Metro tunnel drilling project.

Close -up of the train running in the tunnel of Metro Nhon - Hanoi Station

Thế Kỷ |

The train is considered a "transport blood vessel" in the tunnel, helping the TBM tunnel to operate continuously and ensure the progress of the Metro Nhon - Hanoi Station project.

Inside the tunnel where the "Speed" TBM is on duty

Tô Thế |

The TBM tunnel boring machine named "Than toc" of the Nhon - Hanoi station metro project has drilled more than 980m of tunnel.