Officially building Phu Kieng bridge worth 600 billion in Nha Trang in 3 years

Hữu Long |

Khanh Hoa - The project to build Phu Kieng Bridge in Nha Trang with an investment capital of nearly 600 billion VND will be implemented in the next 3 years.

On October 31, Nha Trang City People's Council agreed to invest in 18 projects with a total capital of 644 billion VND. Notably, the list of approved projects includes the project to build Phu Kieng Bridge in Vinh Ngoc Commune with an investment capital of nearly 600 billion VND.

Nhieu nam qua, viec nguoi dan di chuyen qua cau go Phu Kieng co thu phi. Anh: Huu Long
For many years, people traveling across Phu Kieng wooden bridge have been charged a toll. Photo: Huu Long

Phu Kieng Bridge, Vinh Ngoc Commune will be invested by Nha Trang City People's Committee with a total capital of nearly 600 billion VND (70% from the provincial budget and 30% from the city budget). The Phu Kieng Bridge construction project will be implemented in the period of 2024-2027.

The project aims to facilitate people's travel needs, develop infrastructure, connect traffic from the southern region to the northern region of the city, and develop urban areas.

Before building the bridge, the locality will organize an architectural competition to select the optimal design that meets appropriate usage needs according to current regulations.

Cau go Phu Kieng duoc nguoi dan xay dung cach day hang chuc nam va xuong cap tu lau. Anh: Huu Long
Phu Kieng wooden bridge was built by locals decades ago and has long since deteriorated. Photo: Huu Long

Currently, Phu Kieng wooden bridge was built by local people more than 22 years ago. During its operation, the bridge has seriously degraded due to termites and damage, so the locality plans to build a new bridge with reinforced concrete.

People in the three villages of Xuan Ngoc, Hon Nghe 1, Hon Nghe 2 in Vinh Ngoc commune, Nha Trang city, want to go to the commune center through Phu Kieng wooden bridge built by a local. Traveling through this wooden bridge is tolled and has existed for many years.

Hữu Long
RELATED NEWS

Removing obstacles in temporary anchorage area for international passenger ships to Nha Trang

|

The local upgrade of Nha Trang Port affects the reception of international cruise ships. To solve this problem, the tourism industry has chosen Cam Ranh International Port as a temporary replacement and completed procedures for the anchorage area to receive ships at the private marina.

45 central streets of Nha Trang will ban parking on even and odd days

|

Khanh Hoa - From November 1, the parking ban on odd and even days will officially be implemented on 45 streets in Nha Trang.

Proposal to welcome international cruise ships at Ana Marina Nha Trang Port

|

Khanh Hoa - Khanh Hoa Province Department of Tourism has just proposed a number of new locations to arrange for international cruise ship passengers to Nha Trang.

9th Hour No. 184: Short Happiness - Part 2

|

9th Hour - Loving a city man and then being forced to have an abortion, a country girl decides to keep her child. Where will this love tragedy push the fate of both mother and child?

People release buffaloes and crawl to the edge of the Vinh Hao - Phan Thiet expressway

|

Lam Dong - From the locations where the barbed wire fence was cut, people released buffaloes and cows into the corridor next to the Vinh Hao - Phan Thiet expressway.

It's a bit of a bit of a bit of a bit of a bit of a bit.

Vinh Chau purple onions in season, rural workers have more jobs

|

Can Tho - Vinh Chau is not only famous for its purple onion fields but also creates stable livelihoods for thousands of local workers.

US economy accelerates in 2025, opening a brighter growth period in 2026

|

The US economy recorded strong growth in 2025, GDP broke through in the third quarter and consumption maintained its momentum, creating a positive foundation for the outlook for 2026.

How Thanh Nhan deceived the U23 Korean goalkeeper

|

Striker Thanh Nhan took the decisive penalty to bring home a bronze medal for U23 Vietnam at the 2026 AFC U23 Championship.

Removing obstacles in temporary anchorage area for international passenger ships to Nha Trang

Hữu Long |

The local upgrade of Nha Trang Port affects the reception of international cruise ships. To solve this problem, the tourism industry has chosen Cam Ranh International Port as a temporary replacement and completed procedures for the anchorage area to receive ships at the private marina.

45 central streets of Nha Trang will ban parking on even and odd days

Hữu Long |

Khanh Hoa - From November 1, the parking ban on odd and even days will officially be implemented on 45 streets in Nha Trang.

Proposal to welcome international cruise ships at Ana Marina Nha Trang Port

Phương Linh |

Khanh Hoa - Khanh Hoa Province Department of Tourism has just proposed a number of new locations to arrange for international cruise ship passengers to Nha Trang.