In the early stages of Long Thanh airport, priority should be given to cargo exploitation and support for Tan Son Nhat

MINH QUÂN - ANH CHIẾN |

According to Associate Professor, Dr. Nguyen Thien Tong, in the first phase, Long Thanh airport should prioritize cargo exploitation, logistics service development, and support Tan Son Nhat airport.

Traffic connecting Ho Chi Minh City with Long Thanh is currently overloaded

Long Thanh airport (Long Thanh commune, Dong Nai province) according to the basic schedule will be completed on December 19, 2025, inaugurated according to regulations, and put into commercial operation in early 2026.

Associate Professor, Dr. Nguyen Thien Tong - former Head of the Faculty of Aviation Engineering, Ho Chi Minh City University of Science and Technology - said: In the context that Tan Son Nhat airport still has enough capacity to serve and is not yet overloaded except for some peak holidays and Tet, it is unnecessary to transfer all international flights to Long Thanh airport as soon as this airport is put into operation from 2026.

Nha ga T3 - San bay Tan Son Nhat. Anh: HAC
Terminal T3 - Tan Son Nhat Airport. Photo: HAC

According to Mr. Tong, with the operation of terminal T3, the capacity of Tan Son Nhat airport has now been increased to 50 million passengers per year. Mr. Tong said that the core issue for an airport to operate effectively lies in connecting traffic. However, the main routes connecting Ho Chi Minh City (where there is the largest demand for travel) with Long Thanh are currently overloaded, while many key projects such as the expansion of Long Thanh - Dau Giay Expressway, Ben Luc - Long Thanh Expressway, Bien Hoa - Vung Tau Expressway or Ho Chi Minh City Ring Road 3 have not yet been able to ensure progress and smooth operation in the near future.

Thi cong tuyen T1, T2 ket noi san bay Long Thanh. Anh: HAC
Construction of routes T1 and T2 connecting Long Thanh airport. Photo: HAC

From there, Mr. Tong emphasized that if all international flights are postponed to Long Thanh, passengers will suffer the most. Instead of just taking 15-20 minutes to travel an 8-10 km distance to Tan Son Nhat airport, they will have to travel more than 40 km to Long Thanh, causing additional costs and the risk of flight delays if there is traffic congestion. In addition to the disadvantage for passengers, the transfer of all international operations also causes great disruption for airlines due to having to relocate the operating system.

Therefore, according to Mr. Tong, in the first phase, Long Thanh airport should only prioritize the exploitation of goods, development of logistics services and play a supporting role for Tan Son Nhat. Only when the connecting traffic infrastructure is completed should we consider gradually transferring international flights from Tan Son Nhat to Long Thanh airport.

Tan Son Nhat Airport will favor high-quality aviation

Dr. Ngo Viet Nam Son believes that we should not " spread the role" between Long Thanh and Tan Son Nhat, but that the two airports operate the same, both have international flights, short- and long-distance routes, domestic operations.

TSKH-KTS Ngo Viet Nam Son. Anh: HAC
Dr. Ngo Viet Nam Son. Photo: HAC

However, Tan Son Nhat airport with the advantage of being near the center will tend to be high-quality air with the best flights, higher tickets and for those who buy high-quality services to save travel time between the airport and the inner city of Ho Chi Minh City.

Dr. Ngo Viet Nam Son said that Long Thanh airport needs to be exploited according to a 3-step roadmap.

In the first phase, when the regional infrastructure and metro lines are not yet complete, the airport should only share some of the pressure with Tan Son Nhat, while focusing on developing freight transport.

In phase two, after completing the airport transportation and urban system, it is possible to transfer more international routes.

In the final step, Long Thanh airport will become a leading airport in Southeast Asia, integrated with an airport urban area, free trade zone and expressway network, metro - similar to the model of Singapore or Amsterdam.

"We should not give Long Thanh too much responsibility from the beginning. It is necessary to make adjustments to both make it convenient for passengers and economically efficient" - Mr. Son emphasized.

MINH QUÂN - ANH CHIẾN
RELATED NEWS

Traffic infrastructure determines the effectiveness of Long Thanh airport

|

The Prime Minister has requested an inspection and handling of the exploitation plan for Long Thanh and Tan Son Nhat airports.

Prime Minister requests to handle the plan to exploit 2 large airports after Lao Dong Newspaper's reflection

|

After the article of Lao Dong Newspaper, the Prime Minister requested an inspection and handling of the plan to exploit Long Thanh and Tan Son Nhat airports.

Dong Nai upgrades, expands and builds more than 110km of road connecting Long Thanh airport

|

Dong Nai - 3 provincial routes 769, 773 and 770B with an investment of more than VND18,000 billion connecting Long Thanh airport.

Opening of the Sports Festival to celebrate the 1st National Party Congress of the Fatherland Front and Central Trade Unions

|

The sports festival to welcome the 1st Congress of the Party Committee of the Fatherland Front and Central Organizations for the 2025-2030 term officially opened on the morning of September 20.

American tourists surprised by the strange actions of a Vietnamese woman on the plane

|

During her first trip to Vietnam, the American female tourist was constantly surprised by the rare experiences throughout the journey.

Proposal to select a consortium of 3 investors for the Long Thanh airport fuel pipeline project

|

Dong Nai - A 23km long aircraft fuel pipeline from Go Dau Industrial Park to Long Thanh airport, with a total investment of nearly 1,500 billion VND.

Incident of house construction on other person's land in Ho Chi Minh City: Landlord proposes to relocate the house soon

|

HCMC - The People's Committee of Chanh Hiep Ward, HCMC has sent a competent unit to receive the petition and resolve the case of mistakenly building a house on someone else's land.

Traffic infrastructure determines the effectiveness of Long Thanh airport

Lê Thanh Phong |

The Prime Minister has requested an inspection and handling of the exploitation plan for Long Thanh and Tan Son Nhat airports.

Prime Minister requests to handle the plan to exploit 2 large airports after Lao Dong Newspaper's reflection

PHẠM ĐÔNG |

After the article of Lao Dong Newspaper, the Prime Minister requested an inspection and handling of the plan to exploit Long Thanh and Tan Son Nhat airports.

Dong Nai upgrades, expands and builds more than 110km of road connecting Long Thanh airport

HÀ ANH CHIẾN |

Dong Nai - 3 provincial routes 769, 773 and 770B with an investment of more than VND18,000 billion connecting Long Thanh airport.