Hanoi spends more than 500 billion VND to build a wastewater treatment plant in Son Tay town

KHÁNH AN |

Hanoi - The city invested more than 500 billion VND to build a Son Tay wastewater collection system and treatment plant.

The Hanoi People's Committee has just issued a decision approving the project to invest in the construction of a wastewater collection system and treatment plant in Son Tay town.

According to the decision, the project's goal is to build a wastewater treatment system for 7/15 inner-city wards of Son Tay town, synchronously about 400 hectares.

The project includes a network of main sewers, spillways, sewers, and centralized wastewater treatment stations as a basis for building a completely separate wastewater drainage system, and after-treatment wastewater meets permitted standards before being discharged into the environment. Ensure the development capacity, expand the connection of the drainage system of Son Tay basin according to the Hanoi drainage plan to 2030 and vision to 2050.

The City People's Committee assigned the Management Board of Investment Projects for Construction of Technical Infrastructure and Agriculture as the investor with a total investment of nearly 501 billion VND, implemented in 2024 - 2027. The project is a technical infrastructure project of Group B, level II and the term of use is not less than 50 years.

The investor is responsible before the law for the accuracy of the volume and funding; results of structural calculation and legality of the dossier submitted to the approval; The capacity of organizations and individuals conducting surveys and projects. At the same time, responsible for researching and reviewing regional technical infrastructure systems, updating the technical infrastructure connection plan to ensure thrift, efficiency and optimal economic - technical optimization, ensuring synchronous operation of technical infrastructure inside and outside the project.

The People's Committee of Son Tay Town organizes the implementation of site clearance for the Investment Project to build a Son Tay wastewater collection system and treatment plant, Son Tay Town according to regulations to ensure site conditions for the Investor to implement the Project according to the approved schedule.

KHÁNH AN
TIN LIÊN QUAN

Wastewater treatment plant in Hanoi has been shelved for many years

|

Son Dong wastewater treatment plant (Hanoi) was invested with hundreds of billions of dong but has been "shelved" for a long time.

Nghe An has many options for naming new communes after the arrangement

|

Nghe An - Some localities named new communes after districts with serial numbers, some other localities named them with historical and traditional cultural elements.

The Ministry of Public Security informs about new features on VNeID for flying

|

The VNeID application has just integrated a new feature to serve passengers getting on a plane from buying tickets, going through security checkpoints... the entire process without paperwork.

List of 65 expected commune-level administrative units in Thai Binh after the reorganization

|

Thai Binh - According to the draft project, after the arrangement, the whole Thai Binh province will now decrease from 242 to 65 commune-level administrative units.

The scale of Hai Phong City after merging with Hai Duong province

|

Hai Phong - Hai Phong City is collecting voters' opinions on the draft Project to merge with Hai Duong province.

Co-opBank celebrates 30 years of establishment, affirming its role as a community bank

|

After 3 decades of development, Co-opBank has become a pillar connecting the people's credit fund system.

Dong Anh District requires officials not to go sightseeing or relaxation when reorganizing the apparatus

|

Hanoi - Dong Anh District People's Committee requires cadres, civil servants, and public employees not to go sightseeing or vacations until the restructuring of the apparatus is completed.

VEC sues many partners, demands land for Noi Bai - Lao Cai expressway rest stop

|

Vietnam Expressway Corporation (VEC) has sued many investors in rest stops on the Noi Bai - Lao Cai Expressway for breach of contract.

Wastewater treatment plant in Hanoi has been shelved for many years

NGỌC THÙY |

Son Dong wastewater treatment plant (Hanoi) was invested with hundreds of billions of dong but has been "shelved" for a long time.

Nhà máy xử lý nước thải Yên Xá có tổng mức đầu tư gần 11.197 tỉ đồng

KHÁNH AN |

Ngày 10.12, HĐND TP Hà Nội thông qua chủ trương đầu tư và điều chỉnh chủ trương đầu tư 14 dự án, trong đó có dự án Nhà máy xử lý nước thải Yên Xá.

Vận hành thử Nhà máy xử lý nước thải Yên Xá

Minh Hạnh |

Hà Nội - Nhà máy xử lý nước thải Yên Xá bắt đầu vận hành thử nghiệm 6 tháng sau 8 năm khởi công xây dựng.