Just in the rainy season, Ca Mau has landslides everywhere

NHẬT HỒ |

Ca Mau - At the beginning of the rainy and stormy season, landslides have recurred in the province, causing many difficulties for people's production, daily life and travel.

Landslides are no longer seasonal

According to the Department of Irrigation of Ca Mau province, there are currently many dangerous landslides, directly threatening people's lives, transport infrastructure, protective forests and trade of the people.

Nhieu doan de bien Dong khong con rung, song danh vao chan de gay sat lo. Anh: Nhat Ho
Many sections of the East Sea dike are no longer forested, waves hit the foot of the dike, causing landslides. Photo: Nhat Ho

In the old Ca Mau area, many riverside and coastal locations are being severely eroded. For example, Sa Pho hamlet (Dat Moi commune), about 700m along Cua Lon river, is at risk of serious landslides. The Bo De estuary (Tam Giang Commune) has been eroded by 200m, damaging traffic routes and threatening the aquaculture area of the people, the total length of the danger zone is up to 750m.

Rung ven bien bi song danh troi, de bien Dong gong minh chan song. Anh: Nhat Ho
Coastal forests were washed away by waves, the East Sea dykes were blocking the waves. Photo: Nhat Ho

In Bac Lieu province (old), now in Ca Mau province, the risk of landslides exists in many key locations. The section of the canal west of the downstream of Nha Mat culvert (Nha Mat ward) and east of Cay Gua culvert (Phong Thanh commune) both show signs of serious instability.

Sat lo bo song xang Bac Lieu - Ca Mau doan phuong Gia Rai rang sang ngay 13.7 khien 5 can nha troi xuong song. Anh: Nhat Ho
The landslide on the banks of the Bac Lieu - Ca Mau canal in Gia Rai ward in the early morning of July 13 caused 5 houses to flow into the river. Photo: Nhat Ho

Notably, the section of Ganh Hao River adjacent to Tac Van canal (Dinh Thanh commune) has a 650m riverbank, which is under threat, directly affecting 68 households. The Gio Nguoc Bay route (Dinh Thanh commune) has sunk 30 m, leaving a mark on the deterioration of the geological foundation of the area.

In the face of the above situation, Mr. Le Van Su - Vice Chairman of the People's Committee of Ca Mau province - requested that any place at risk of insecurity must evacuate people to a safe place, organize the placement of signs and notify people about the landslide situation in the area. In particular, it is necessary to closely monitor weather developments, prevent the risk of widespread landslides, and have timely response plans when incidents occur.

Danger is still lurking

Mr. Nguyen Van Dong in Hamlet 3, Gia Rai Ward, Ca Mau Province - one of 5 households whose houses collapsed in the early morning of July 13 - said: In the middle of the night when everyone in the house was sleeping, he suddenly heard a loud shaking from houses on the riverbank, and just a few minutes later, they collapsed completely into the river".

Can nha cua ong Nguyen Van Dong, phuong Gia Rai, tinh Ca Mau bi sat lo nghiem trong. Anh: Nhat Ho
The house of Mr. Nguyen Van Dong, Gia Rai ward, Ca Mau province suffered a serious landslide. Photo: Nhat Ho

Mr. Tran Son Dung - resident of Bien Dong A hamlet, Hiep Thanh ward - said: "Previously, when there were no concrete pillars to protect the embankment, in this area, when there were big waves, strong winds hit the dike body, causing rocks and soil to rise to a meter, overflowing the dike body, water flowing into residential areas".

Ong Lam Da Rit dien ta lai canh nuoc tran qua de bien Dong, Ca Mau khi gia dinh dang to chuc dam cuoi cho con. Anh: Nhat Ho
Mr. Lam Da Ri described the scene of water overflowing the East Sea dyke in Ca Mau when his family was holding a wedding for his child. Photo: Nhat Ho

Having a house near the landslide area, Mr. Lam Da Riet shared: When there were no protective embankments, big waves overflowed the embankment, flowing straight into the house, the strong waves made my house shake, not daring to stay in the house. Every time we see big waves, we are afraid, but since the construction of the breakwater, people should be more assured, the big waves no longer hit the dike body hard.

The landslide section in Vinh Trach Dong commune, the old Bac Lieu province (now Hiep Thanh ward, Ca Mau province), bordering the old Soc Trang province (now Can Tho city) was built with an outer breakwater, reinforcing the foot of the embankment by pouring rocks into the houses damaged by waves. However, this dike section is still low, high tides and water still overflows into people's houses.

Tai nhung noi ke bien hoan thanh (khu vuc Ganh Hao), khong con sat lo, phia trong de rung da hoi sinh. Anh: Nhat Ho
In the places where the sea dyke has been completed (Ganh Hao area), there are no more landslides, and the forest dyke has been revived. Photo: Nhat Ho

In many East Sea dykes, there are no more forests so the waves hit the foot of the dykes directly. At the same time, when high tides combine strong winds at sea, they are likely to form strong waves that cause sea water to overflow the dykes into the production area and houses inside the fields (there are 60 households from the foot of the dykes to the field 100m and 800 households from the foot of the dykes to the field 2,000m), affecting the lives, production situation, safety of life and property of some households behind the dykes.

From the beginning of 2025 to now, the total damage caused by natural disasters in Ca Mau province has reached over 16.1 billion VND. In which: 10 fishing boats sank, killing 2 people, 4 people missing and 8 people drifting; 11 houses collapsed, 20 houses with roofs blown off, 1 roof covered with gasoline and oil damaged; flooded 1,955 hectares of Summer-Autumn rice, 0.03 hectares of vegetables damaged; 48 landslides along the river with a length of more than 1,200m (including 652m of concrete road), damaged 26 houses, 2 shrimp culverts, 1 shrimp square of the Forest Protection Management Board affected; high tides caused an 18m embankment tank, flooded 546m of rural traffic road...

NHẬT HỒ
TIN LIÊN QUAN

The project to raise cows and cows to reduce poverty in Ca Mau has been stripped of the intestines from the barn to vaccines

|

The incense sticky rice and dairy cow farming project aims to help people sustainably reduce poverty in Ca Mau, but is disadvantaged by vaccination fees to feed, barns...

The Ca Mau airport upgrade and expansion project has compensated 99%

|

Ca Mau - Compensation and site clearance for the Ca Mau Airport expansion and upgrade project are about to be completed.

The sea dike of West Ca Mau is struggling before the rainy and stormy season

|

Ca Mau - The West Sea dyke is struggling to cope with large waves and high tides in a state of frequent and serious landslides every rainy and stormy season.

Ca Mau - Dat Mui Expressway does not leave investors waiting for site clearance

|

Ca Mau - Chairman of the Provincial People's Committee requested that the implementation of the Ca Mau - Dat Mui expressway must be given top priority, especially site clearance.

The only waste treatment plant closed, by the end of July, Ca Mau had no more place to bury waste

|

Ca Mau - After the waste treatment plant closed, Ca Mau took the waste to bury. This is a temporary solution, but by the end of July there is no more burial place.

The only waste treatment plant closed, Ca Mau plans to bury waste

|

Ca Mau - Ca Mau's only waste treatment plant has temporarily stopped receiving waste since June 16, most of the province's household waste is planned to be buried.

Ca Mau will complete the civil service house for cadres from Bac Lieu to work as soon as possible

|

Ca Mau - Provincial leaders are directing construction units to complete the official housing as soon as possible, expected to be arranged for more than 400 cadres from Bac Lieu to work in Ca Mau.

Workplaces and accommodation are ready for Bac Lieu officials to return to Ca Mau after the merger

|

Ca Mau - Bac Lieu officials working in Ca Mau will be supported with VND 2,220,000/person/month, support period of 2 years.

The project to raise cows and cows to reduce poverty in Ca Mau has been stripped of the intestines from the barn to vaccines

NHẬT HỒ |

The incense sticky rice and dairy cow farming project aims to help people sustainably reduce poverty in Ca Mau, but is disadvantaged by vaccination fees to feed, barns...

The Ca Mau airport upgrade and expansion project has compensated 99%

NHẬT HỒ |

Ca Mau - Compensation and site clearance for the Ca Mau Airport expansion and upgrade project are about to be completed.

The sea dike of West Ca Mau is struggling before the rainy and stormy season

NHẬT HỒ |

Ca Mau - The West Sea dyke is struggling to cope with large waves and high tides in a state of frequent and serious landslides every rainy and stormy season.

Ca Mau - Dat Mui Expressway does not leave investors waiting for site clearance

NHẬT HỒ |

Ca Mau - Chairman of the Provincial People's Committee requested that the implementation of the Ca Mau - Dat Mui expressway must be given top priority, especially site clearance.

The only waste treatment plant closed, by the end of July, Ca Mau had no more place to bury waste

NHẬT HỒ |

Ca Mau - After the waste treatment plant closed, Ca Mau took the waste to bury. This is a temporary solution, but by the end of July there is no more burial place.

The only waste treatment plant closed, Ca Mau plans to bury waste

NHẬT HỒ |

Ca Mau - Ca Mau's only waste treatment plant has temporarily stopped receiving waste since June 16, most of the province's household waste is planned to be buried.

Ca Mau will complete the civil service house for cadres from Bac Lieu to work as soon as possible

NHẬT HỒ |

Ca Mau - Provincial leaders are directing construction units to complete the official housing as soon as possible, expected to be arranged for more than 400 cadres from Bac Lieu to work in Ca Mau.

Workplaces and accommodation are ready for Bac Lieu officials to return to Ca Mau after the merger

NHẬT HỒ |

Ca Mau - Bac Lieu officials working in Ca Mau will be supported with VND 2,220,000/person/month, support period of 2 years.