Quang Binh regulates reservoirs to cope with heavy rain

CÔNG SÁNG |

Quang Binh - On November 2, the Provincial People's Committee said it had directed the regulation of reservoirs and proactively prepared to respond to heavy rain.

Currently, the flood level on the rivers has dropped below the warning level II. According to the National Center for Hydro-Meteorological Forecasting, from November 4, there is a possibility of widespread heavy rain in the locality.

In order to proactively respond to natural disasters, especially large floods that may occur continuously and last for a long time in the coming time, the Provincial People's Committee requests localities and units to promptly and effectively implement disaster prevention, overcoming consequences, and rescue.

The goal is to follow the motto "4 on-site" with the most proactive, timely and drastic spirit to ensure safety of life and minimize damage to property of the people and the state.

Urgently implement measures to reinforce and protect key irrigation reservoir dams, especially medium and small reservoirs that are full of water and at high risk of insecurity; arrange forces to be on duty, have plans to proactively evacuate downstream residents to ensure safety in case of an incident; review and arrange forces, materials and means to be ready to deploy for rescue when an incident occurs.

Sectors, units and localities direct and organize the supervision of the safe operation of reservoirs and irrigation dams in the area according to approved operating procedures, and proactively handle and promptly report situations arising during operation.

For reservoirs with operating procedures, regulate the reservoir according to the lowest water supply restriction line to prevent adverse weather developments.

For reservoirs without gates, urgently operate and regulate the reservoir by releasing water through the intake culvert to catch floods during the next rains.

The authorities organize 24/7 duty during rain and flood periods; regularly report on the safety of irrigation works, construction incidents, water levels and construction operations to the authorities for timely handling.

CÔNG SÁNG
RELATED NEWS

Bad weather combination is about to cause heavy rain, over 500mm in some places

|

The meteorological agency said a series of bad weather conditions will cause very heavy rain in the Central region from November 3.

Central region warns of heavy rain, risk of flooding

|

The General Department of Hydrometeorology has just issued a warning that from November 3-10, the Central region may be affected by some bad weather patterns causing heavy rain.

Strong cold front is about to bring heavy rain and a series of bad weather

|

A representative of the meteorological agency said that in the first 10 days of November, the cold air will strengthen, bringing with it a series of bad weather conditions.

People's Artist Pham Phuong Thao and singer Ngo Lan Huong spread green lifestyle through music

|

Hanoi - Green Transformation Day 2026 attracts a large number of people and artists to participate with many activities experiencing green traffic and green lifestyles.

Green living, green walking, green development

|

From industrial parks, transportation to daily life, green transformation is clearly present, opening up new momentum for sustainable growth.

Green transformation - driving force for Vietnam's new growth model

|

Green transformation is becoming an important driving force of the new growth model, not only contributing to improving the competitiveness of the economy but also opening up opportunities to attract high-quality investment capital flows. This is also the "key" to help businesses participate more deeply in global supply chains according to sustainable development standards.

Instructions on switching from old gasoline cars to electric cars at Green Transit Day 2026

|

On Green Transformation Day 2026, people can bring old gasoline cars to participate in the "gasoline to electricity exchange" program and directly experience new electric vehicle lines.

Draft Report of the Executive Committee of the Vietnam General Confederation of Labor (XIII term) at the XIV Congress of the Vietnam Trade Union, term 2026 - 2031

|

Building a comprehensively strong Vietnam Trade Union; focusing on representing, caring for, and protecting union members and workers; promoting the pioneering role, spirit of innovation and creativity, contributing to realizing the aspiration to build a rich, prosperous, civilized, and happy country.

Bad weather combination is about to cause heavy rain, over 500mm in some places

AN AN |

The meteorological agency said a series of bad weather conditions will cause very heavy rain in the Central region from November 3.

Central region warns of heavy rain, risk of flooding

An Thượng |

The General Department of Hydrometeorology has just issued a warning that from November 3-10, the Central region may be affected by some bad weather patterns causing heavy rain.

Strong cold front is about to bring heavy rain and a series of bad weather

AN AN |

A representative of the meteorological agency said that in the first 10 days of November, the cold air will strengthen, bringing with it a series of bad weather conditions.