Will spend 9 billion to repair lights on Trung Luong highway in 2025

Xuyên Đông |

The Ministry of Transport said that in 2025, the unit plans to spend 9 billion VND to repair the lights on the Ho Chi Minh City - Trung Luong expressway.

Long An voters reported that the light bulbs on the Ho Chi Minh City - Trung Luong Expressway (section through Nhi Thanh Commune, Thu Thua District) are not burning or are dim... which can easily cause traffic accidents when traveling on this route.

Voters recommend that the Ministry of Transport review and replace the light bulbs on this road section.

Voters also recommended considering opening a median strip and installing traffic lights at the intersection of National Highway 1A and Provincial Road 835B, to facilitate people's travel and trade.

Responding to this issue, the Ministry of Transport said that in recent years, the Ministry of Transport has directed the highway management and maintenance unit to regularly inspect and arrange periodic repair works to overcome shortcomings in the lighting system on the Ho Chi Minh City - Trung Luong highway, details as follows:

In 2023, implemented 1 portfolio with a budget of about 5 billion VND, completed in December 2023.

2024: Implement 1 portfolio with a budget of about 8 billion VND, completed in August 2024.

In 2025, the unit plans a portfolio with a budget of 9 billion VND.

"Thus, after completing the projects to repair the damaged lighting system, it will basically meet the lighting needs on the highway," the Ministry of Transport affirmed.

Regarding the proposal to open the median strip and arrange traffic lights, the Ministry of Transport informed that the location where voters proposed to open the median strip on National Highway 1 at Km1927+100 is the intersection with Provincial Road 853B.

Current status of adjacent median strip opening points, about 160m away in the direction of Ho Chi Minh City (intersection with Bo Kenh Street), about 600m away in the direction of Tien Giang (intersection with Provincial Road 835).

Thus, within a 1000 m radius, there are 02 points where the median strip has been opened. To ensure safety and prevent traffic congestion at intersections, during the investment phase of the National Highway 1 upgrading and renovation project, no median strip opening point was designed at the intersection of Provincial Road 835B, only the 2 above mentioned median strip locations were opened.

To ensure convenience and safety for vehicles traveling from the intersection of Provincial Road 835B to and from National Highway 1, the Ministry of Transport requests the People's Committee of Long An province to direct the Department of Transport of Long An to study and build a deceleration and acceleration road, separating lanes according to standards to connect from Provincial Road 835B to National Highway 1.

Xuyên Đông
TIN LIÊN QUAN

Removing obstacles in forest conversion at highway tunnels worth over 1,000 billion VND

|

Ha Tinh - The road tunnel of the North-South expressway, Eastern phase 2021 - 2025 in Ha Tinh has now had its natural forest conversion procedures cleared.

Request for quality control of Nha Trang - Cam Lam expressway before opening day

|

Khanh Hoa – The joint venture of contractors proposed to allow the Nha Trang - Cam Lam expressway to operate, the Ministry of Transport requested the investor to closely monitor the quality of the project.

Many obstacles in moving the landfill blocking the highway

|

Can Tho - The deeper they dig, the more leachate is released from landfill No. 8, blocking the Can Tho - Ca Mau expressway, forcing the unit to dig temporary pits to contain it.

After a meal in Quang Ninh, 1 person died, 4 people in critical condition

|

Quang Ninh - After the meal, 5 people suspected of food poisoning were taken to the emergency room, of which 1 person did not survive. Authorities are investigating the cause of the incident.

Quang Ninh stops pilot exam to recruit leaders

|

Quang Ninh - The Standing Committee of the Quang Ninh Provincial Party Committee agreed to stop the pilot exam to recruit leaders and managers at the department and division levels.

Peach and kumquat trees for Tet are "lying" on the streets waiting for buyers

|

According to many traders, the price of peach and kumquat trees for Tet this year has not increased significantly, but purchasing power is not as high as previous years.

Coach Kim Sang-sik wants to celebrate Tet in Vietnam and travel with his family

|

In the Sports Perspective program No. 197, coach Kim Sang-sik said he is thinking about staying in Vietnam to celebrate Tet and taking his family there for a vacation.

Ukraine wants to replace EU member

|

Ukraine has announced that it is ready to replace Hungary in the EU if Budapest leans towards Russia.

Removing obstacles in forest conversion at highway tunnels worth over 1,000 billion VND

TRẦN TUẤN |

Ha Tinh - The road tunnel of the North-South expressway, Eastern phase 2021 - 2025 in Ha Tinh has now had its natural forest conversion procedures cleared.

Request for quality control of Nha Trang - Cam Lam expressway before opening day

Hữu Long |

Khanh Hoa – The joint venture of contractors proposed to allow the Nha Trang - Cam Lam expressway to operate, the Ministry of Transport requested the investor to closely monitor the quality of the project.

Many obstacles in moving the landfill blocking the highway

Tạ Quang - Yến Phương |

Can Tho - The deeper they dig, the more leachate is released from landfill No. 8, blocking the Can Tho - Ca Mau expressway, forcing the unit to dig temporary pits to contain it.