New information about building a second airport in Hanoi

Hoài Anh |

Hanoi - Regarding the construction of the 2nd airport, the city will study and calculate to compare with the option of placing it in neighboring provinces to save land funds.

Hanoi City People's Committee has just submitted a report to Hanoi City People's Council on the approval of the master plan of Hanoi Capital with a 100-year vision.

Hanoi People's Committee said that the consulting consortium has summarized the comments of ministries on the master plan of Hanoi capital with a 100-year vision.

In which, in Appendix 2 of the submission, there is a proposal to build a second airport in the former Ung Hoa district area, now Tram Long, Dong Tan, Minh Duc and Kim Duong communes (Hanoi).

Accordingly, many opinions believe that the second airport is the airport of the entire Capital Region. If it is located in Ung Hoa, it will waste national resources.

Therefore, it is possible to consider placing it in neighboring localities such as Hung Yen and Ninh Binh to save land funds for Hanoi. If located in Hanoi, the airport space must be associated with conference centers, hospitals, offices, not just simply logistics.

Accepting opinions on the second airport, the consulting consortium said that the project will thoroughly grasp the view that this is the airport of the entire capital region, and will study and calculate comparisons with the plan to locate in neighboring provinces (Hung Yen, Ninh Binh) to save land funds.

In case it is located in Hanoi, the airport space must be connected to the convention center, hospital, and office area.

According to the planning orientation in the draft submitted for comments earlier, the new airport has an area of about 1,500 hectares; with an expected capacity of 30-50 million passengers/year and about 1 million tons of cargo/year.

The construction investment time will be determined based on the assessment of development needs in each stage.

The plan also orients the airport to connect with Phu Xuyen urban area according to the "airport urban area" model. This area is expected to form a central hub for integrated transportation services, connecting many types of transport such as aviation, railway, waterway and road.

The transportation system connecting the airport is expected to include two expressways: Phap Van - Cau Gie and Cho Ben - Yen My; two urban axes: Ngoc Hoi - Phu Xuyen and the southern economic axis.

In addition, urban railway line No. 9 is expected to connect from Ngoc Hoi - Thuong Tin - the second airport in the Capital region - Phu Xuyen. The plan also plans to arrange a high-speed railway station near the airport area.

The city also plans to reserve development corridors for southern traffic routes, including East-West connecting axes and urban railway lines connecting from the center of Hanoi to the airport.

In addition, the city will also adjust the capacity of Noi Bai International Airport to meet development needs.

Hoài Anh
RELATED NEWS

People protest against the plan to relocate hundreds of thousands of people to build the Red River avenue

|

Hanoi - People protest "option 2" of the Red River Landscape Avenue Axis project (clearance 2. 100 ha, relocating hundreds of thousands of people).

Hanoi reveals location for building the 2nd airport

|

Hanoi is studying to put Gia Lam and Hoa Lac airports into dual-use operation, and reserve land funds in Ung Hoa to build a second airport in the Capital region.

After the case of a teacher punishing a student with a syringe, the Principal requested a job transfer

|

Ho Chi Minh City - After the incident of a teacher punishing a student for self-injecting a needle into his hand, the Principal self-criticized in front of the School Council and requested a job transfer.

"7th Wonderful Day" is about to take place in Ha Long Bay

|

Quang Ninh - The "7 Wonders Day" event is expected to take place on July 7, 2026, in Ha Long Bay with a large scale and many activities.

Instructions on switching from old gasoline cars to electric cars at Green Transit Day 2026

|

On Green Transformation Day 2026, people can bring old gasoline cars to participate in the "gasoline to electricity exchange" program and directly experience new electric vehicle lines.

Draft Report of the Executive Committee of the Vietnam General Confederation of Labor (XIII term) at the XIV Congress of the Vietnam Trade Union, term 2026 - 2031

|

Building a comprehensively strong Vietnam Trade Union; focusing on representing, caring for, and protecting union members and workers; promoting the pioneering role, spirit of innovation and creativity, contributing to realizing the aspiration to build a rich, prosperous, civilized, and happy country.

People protest against the plan to relocate hundreds of thousands of people to build the Red River avenue

HOÀI ANH |

Hanoi - People protest "option 2" of the Red River Landscape Avenue Axis project (clearance 2. 100 ha, relocating hundreds of thousands of people).

Đề xuất không chuyển Trường Đại học Dược Hà Nội thành bảo tàng

HOÀI ANH |

Hà Nội - Giới trí thức và sinh viên kiến nghị bảo tồn Trường Đại học Dược Hà Nội gắn liền với chức năng đào tạo.

Hanoi reveals location for building the 2nd airport

KHÁNH AN |

Hanoi is studying to put Gia Lam and Hoa Lac airports into dual-use operation, and reserve land funds in Ung Hoa to build a second airport in the Capital region.