HCMC starts construction of Ben Thanh - Can Gio Metro line on December 19

MINH QUÂN |

Ho Chi Minh City - The Ben Thanh - Can Gio Metro Line, nearly 53 km long with a total investment of more than VND 86,650 billion, will officially start construction on December 19.

This information was announced by a representative of the Ho Chi Minh City Department of Construction on November 15.

Recently, Ho Chi Minh City Party Secretary Tran Luu Quang - Head of the Steering Committee for the Development of the Ho Chi Minh City Urban Railway Network, requested relevant departments and branches to deploy many tasks in parallel to ensure the progress of the work, avoiding waiting or congestion due to lack of coordination.

The Ben Thanh - Can Gio Metro project is proposed for investment by VinSpeed High-Speed Railway Investment and Development Joint Stock Company.

The metro line is nearly 53 km long, passing through 8 communes and wards including: Ben Thanh, Xom Chieu, Tan Thuan, Tan My, Nha Be, Binh Khanh, An Thoi Dong and Can Gio (formerly in districts 1, 4, 7, Nha Be district and Can Gio district).

The Ben Thanh - Can Gio Metro is built according to double track standards, 1,435 mm track gauge, designed speed up to 350 km/h.

Phase 1 of the project includes two main stations, Ben Thanh and Can Gio. In phase 2, when demand increases, the line can add four more stations: Tan Thuan, Tan My, Nha Be and Binh Khanh. The depot and control center (OCC) will be located in Can Gio commune.

The total estimated investment of the project is more than VND 86,650 billion, of which the construction cost is about VND 37,000 billion, the equipment cost is more than VND 24,740 billion and the project management cost is more than VND 7,400 billion.

Metro Ben Thanh - Can Gio co diem cuoi gan Khu do thi du lich bien Can Gio.  Anh: Anh Tu
Ben Thanh - Can Gio Metro has an end point near Can Gio Coastal Urban Tourism Area. Photo: Anh Tu

Right after the groundbreaking ceremony at the end of this year, the project will enter the construction and equipment installation stage, expected to last until the third quarter of 2027.

The Ben Thanh - Can Gio Metro Line can be put into trial operation from the fourth quarter of 2027 and put into commercial operation from the first quarter of 2028.

The metro line uses an 8-carry train, with a capacity of about 600 passengers. The train will run from 6am to 11pm every day, with a frequency of 20 minutes/trip.

On average, there are 3 pairs of two-way trains per hour, meeting about 43,680 passengers/day, equivalent to more than 15.9 million passengers per year.

About 50 km from the center of Ho Chi Minh City, Can Gio is over 71,300 hectares wide, of which 70% is mangrove forests and canals. Currently, connecting from here to the center is mainly via Binh Khanh ferry.

With large scale and modern technology, the Ben Thanh - Can Gio Metro is expected to become a vital traffic route, shortening travel time, opening up new development space for the southern area of Ho Chi Minh City, especially Can Gio.

MINH QUÂN
RELATED NEWS

HCMC assigns Vingroup to establish a sea-crossing road project connecting Can Gio and Vung Tau

|

Ho Chi Minh City assigned Vingroup to study and prepare a report on the investment policy for the project to build a sea-crossing road connecting Can Gio with Ba Ria - Vung Tau (formerly).

HCMC will extend Can Gio Metro line to Ben Thanh Station, some sections underground to Tan Thuan

|

Ho Chi Minh City supports the adjustment of the starting point of the Can Gio Metro line from Tan Thuan station to Ben Thanh station; the section from Ben Thanh to Tan Thuan will be underground.

HCMC proposes Prime Minister to speed up 2 metro lines connecting Tan Son Nhat and Long Thanh airports

|

Ho Chi Minh City proposed to prioritize speeding up the progress of urban railway line No. 2 and Thu Thiem - Long Thanh line to connect Tan Son Nhat and Long Thanh airports.

The Korea Tourism Administration to Phu Quoc thanks the fruit shop owner for helping tourists find their mother

|

An Giang - The Korea Tourism Administration in Vietnam visited the home of a fruit shop owner in Phu Quoc to express gratitude for helping Korean tourists.

Ham Rong beach in Hue devastated after natural disasters, risk of erosion "erased"

|

HUE - The food is deeply eaten on the coast of Ham Rong (Vinh Loc commune), many shops of local people have collapsed, facing the risk of being "erased".

Vietnamese films suffered consecutive losses after the "seismic" Red Rain, Death in the Air

|

Vietnamese films are congested but the box office hit rock bottom after the fever of "Red Rain" and "Fall in the Air". Currently, the film "Truy tim dragon dien huong" creates new hope.

Even when buying gold online, people were scammed out of hundreds of millions of VND

|

Recently, many people have been scammed out of tens to hundreds of millions of VND when trading to buy gold through fanpages impersonating famous brands.

4-storey house fire in Nha Trang, people saved in a flash

|

Khanh Hoa - A house fire broke out this morning, November 15, in the Dam Market area, Nha Trang Ward, Khanh Hoa Province.

HCMC assigns Vingroup to establish a sea-crossing road project connecting Can Gio and Vung Tau

MINH QUÂN |

Ho Chi Minh City assigned Vingroup to study and prepare a report on the investment policy for the project to build a sea-crossing road connecting Can Gio with Ba Ria - Vung Tau (formerly).

HCMC will extend Can Gio Metro line to Ben Thanh Station, some sections underground to Tan Thuan

MINH QUÂN |

Ho Chi Minh City supports the adjustment of the starting point of the Can Gio Metro line from Tan Thuan station to Ben Thanh station; the section from Ben Thanh to Tan Thuan will be underground.

HCMC proposes Prime Minister to speed up 2 metro lines connecting Tan Son Nhat and Long Thanh airports

MINH QUÂN |

Ho Chi Minh City proposed to prioritize speeding up the progress of urban railway line No. 2 and Thu Thiem - Long Thanh line to connect Tan Son Nhat and Long Thanh airports.