Society
Many passengers return train tickets, rush to take passenger cars due to Ghenh bridge incident in Dong Nai
|
Ho Chi Minh City - The failure of Ghenh bridge (Dong Nai province) caused many trains to stop running, and many passengers had to wander for hours at Saigon station to wait for new route arrangements.
Newborn baby body found in vacant land in Dak Lak
|
Dak Lak - People in Tan An ward have just discovered a newborn baby's body in an empty lot.
Paradox of streets in Hanoi, 2-way streets but vehicles travel like 1-way
|
Hanoi - Although motorbikes are allowed to circulate in both directions, vehicles in the opposite direction often encroach on the lane, no different from one-way traffic.
Severe shortage of fresh water in the dry season in Ca Mau
|
Ca Mau - Many rural areas continue to face the risk of domestic freshwater shortage due to degraded water supply works, largely dependent on groundwater.
Ferry collision with Ghenh bridge in Dong Nai: Proposal for consideration and prosecution
|
Dong Nai - In the barge collision with Ghenh bridge, the Vietnam Railways Department has a document proposing consideration and prosecution if violating regulations on waterway transport.
Rescued 5 crew members on a ship sunk by waves
|
Quang Tri - 5 crew members on fishing boat numbered Quang Binh - 88991 TS that was sunk by waves were rescued by a fishing boat in Nghe An.
Abandoned and wasteful park in Hanoi is about to be rescued
|
Phung Khoang Lake Park, although some items have been completed, has not been put into use and has been abandoned and wasted for many years.
Determined to eliminate temporary and leaky houses for people in Thai Binh
|
Thai Binh - The province is mobilizing and calling on social resources to join hands in striving to eliminate 100% of temporary and leaky houses for poor and near-poor households by September 2025.
More than 100 billion VND to support Yen Bai to overcome storm number 3 is left behind and has not been allocated
|
Up to now, 113/246 billion VND to support Yen Bai province to overcome natural disasters is still outstanding and has not been allocated.
Ben Dam Port demands shipping company pay 389 million VND in overdue debt
|
Ba Ria - Vung Tau - A passenger transport company going to Con Dao has just been asked by the Ben Dam Port Management Board to settle overdue debts of hundreds of millions of dong.
Forecast of rain in the South from now until the end of November
|
According to the Southern Hydrometeorological Station, from now until the end of November, rain will tend to decrease, temperatures will increase and noon will be quite hot.
The old teacher built a museum that set a Vietnamese record
|
Ha Tinh - Leaving the university lecture hall, the old teacher Nguyen Quang Cuong built a private museum with a large and diverse number of artifacts, which has just been recognized as a Vietnamese record.
Focus on solving the coastal road through Quang Binh
|
Quang Binh - Component project 1 - Coastal road is still stuck in land clearance, the locality has had thorough implementation plans to speed up progress.
A different Lo River after historic storm and flood
|
More than two months after the historic flood, the Lo River through Tuyen Quang has begun to dry up, although it is not yet the peak of the dry season.
Reinstalling the railing of Binh Thanh bridge after the garbage truck crashed into the river
|
HUE - Authorities are reassembling the railing of Binh Thanh Bridge, which was damaged after a garbage truck crashed into the bridge and plunged into the river.
Current status of the historic wharf in Yen Bai after 14 billion VND investment in renovation
|
Yen Bai - The historical site of Ben Au Lau, once a transit point in the campaigns against French colonialism, contributed significantly to the victory of Dien Bien Phu.
Warning about young people suffering from psychosis due to drug use
|
The problem of young people suffering from psychosis due to substance abuse is becoming a major threat, affecting physical, psychological, academic and social health.
Urgently implement the trillion-dollar project to beautify Vung Tau
|
Ba Ria - Vung Tau - After nearly 1 month of construction, the urban beautification project with a total investment of 1,094 billion VND in Vung Tau is being urgently constructed.
Bridge connecting Dong Nai and Ho Chi Minh City to be completed before Lunar New Year 2025
|
Dong Nai - Nhon Trach bridge project under component 1A of Ho Chi Minh City Ring Road 3 is expected to be completed before Lunar New Year 2025.
988 billion VND road embankment in Lang Son cracked
|
Lang Son - After storm No. 3, many embankment locations of the National Highway 4B Renovation and Upgrade Project (section Km3+700 to Km18) have cracked.