Society
Lam Dong allows the recovery of more than 446,000m3 of topsoil covering the quarry as filling material
|
Lam Dong - The Provincial People's Committee confirmed that a business is allowed to recover more than 446,000m3 of topsoil at the Tay Dai Lao construction quarry to make filling materials.
Ho Chi Minh City to open a new 40m wide road to reduce traffic congestion at the Northwest gateway
|
Ho Chi Minh City - The Phan Van Hon parallel road, 9 km long, 40m wide, with a capital of more than 6,800 billion VND, is expected to reduce congestion at the Northwest gateway of Ho Chi Minh City.
Accelerate completion of non-stop toll collection system on Cao Bo - Mai Son expressway
|
Ninh Binh - The investor is focusing on deploying a smart transportation system, controlling vehicle load and toll stations on the Cao Bo - Mai Son expressway.
Preparing to complete 58km of expressway connecting the Mekong Delta to Long Thanh airport
|
The 58km long Ben Luc - Long Thanh expressway is expected to be fully opened in September, connecting the Mekong Delta provinces with Long Thanh airport, reducing traffic congestion for Ho Chi Minh City.
Quang Ngai traces each trace to search for and repatriate more martyrs' remains
|
Quang Ngai - From eyewitness accounts to remaining artifacts, functional forces are tracking each trace to search for martyrs' remains.
