On May 15, the Traffic Police Department of Ho Chi Minh City Police announced that in order to ensure traffic safety and order, the organization of the Ho Chi Minh City Night Run 2025 - HO CHI MINH CITY NIGHT RUN 2025 will temporarily suspend vehicles on a number of routes, including:
At the starting location, the distances of 5 km, 10 km and 21 km
From 11pm on May 16 to 6am on May 17: Vehicles will be temporarily suspended from circulating on Truong Dinh Street (from Nguyen Du to Nguyen Thi Minh Khai for the construction of the starting gate).
From 7:00 p.m. on May 17 to 4:30 a.m. on May 18: Vehicles will be temporarily suspended from Truong Dinh Street (from Nguyen Du to Nguyen Thi Minh Khai to serve the race).
Alternative route: Truong Dinh Street - Nguyen Du Street - Cach Mang Thang Tam Street - Nguyen Thi Minh Khai Street - Truong Dinh Street.
On Vo Van Kiet Street (mixed lane), from Huynh Man Dat Street to Le Loi + Pasteur intersection:
From 11pm on May 17 to 4:30am on May 18, 2-wheeled vehicles are prohibited from entering the mixed lane from District 5 to District 1, from Huynh Man Dat Street to Le Loi + Pasteur intersection (Roundabout in front of the State Bank of Vietnam) to serve the running race.
Alternative route: Vo Van Kiet - Huynh Man Dat - Tran Hung Dao - In District 1.
On routes of night-time running distances: Vehicles will be restricted on the route of the distances, as follows:
21 km distance
Starting - finishing location: Truong Dinh Street (Tao Dan Park).
Starting time: 23:55 on May 17. The running track was closed at 3:35 a.m. on May 18.
Lo trinh: Xuat phat di thang duong Truong Dinh - re phai duong Nguyen Thi Minh Khai - re phai duong Pham Ngoc Thach - di thang Cong Xa Paris - di thang duong Dong Khoi - re phai duong Ton Duc Thang - re phai duong Nguyen Hue - re trai duong Le Thanh Ton - re trai duong Nguyen Hue (quay dau huong nguoc lai) - re phai duong Ton Duc Thang - re phai duong Ham Nghi - quay dau tai giao lo duong Ham Nghi + duong Nam Ky Khoi Nghia - di thang duong Ham Nghi - re phai duong Ton That Dam - re phai duong Vo Van Kiet - Go straight in the opposite direction to Vo Van Kiet Street in a mixed lane close to Ben Nghe canal - Turn the head of Vo Van Kiet street to follow the 2 -wheel lane close to Ben Nghe canal (at the intersection of Huynh Man Dat Street + Vo Van Kiet) - Go straight to Vo Van Kiet - Go straight to Ton Duc Thang (towards the tunnel under Khanh Hoi Bridge) - Turn the right Ba Son Bridge - go straight R12 - Turn the right -hand road - Turn on the right of Nguyen Co Thach Right. Binh Khiem - Turn left Le Duan Street - Turn left Nam Ky Khoi Nghia - Turn right Nguyen Du - Turn right Truong Dinh - Turn Nguyen Thi Minh Khai - enter the gate of the Labor Cultural Palace - to the finish line.
District 10 km
Starting - finishing location: Truong Dinh Street (Tao Dan Park).
Starting time: 0:20 on May 18. The running track was closed at 2:20 a.m. on May 18.
Lo trinh: Xuat phat di thang duong Truong Dinh - re phai duong Nguyen Thi Minh Khai - re phai duong Pham Ngoc Thach - di thang Cong Xa Paris - di thang duong Dong Khoi - re phai duong Ton Duc Thang - re phai duong Nguyen Hue - re trai duong Le Thanh Ton - re trai duong Nguyen Hue (quay dau huong nguoc lai) - re phai duong Ton Duc Thang - re phai duong Ham Nghi - quay dau tai giao lo duong Ham Nghi + duong Nam Ky Khoi Nghia - di thang duong Ham Nghi - re phai duong Ton That Dam - re phai duong Vo Van Kiet - Go straight in the opposite direction to Vo Van Kiet street in a mixed lane close to Ben Nghe canal - Turn the head of Vo Van Kiet street to follow the 2 -wheel lane close to Ben Nghe canal (at the area at the foot of Calmette Bridge) - Go straight to Vo Van Kiet - go straight to Ton Duc Thang (towards the tunnel under Khanh Hoi Bridge) - Go straight to Ton Duc Thang at the foot of Ba Son Bridge - Turn on the right and turn right in the right road - Entering the gate of labor culture - finishing.
5 km distance
Starting - finishing location: Truong Dinh Street (Tao Dan Park).
Starting time: 0:35 on May 18. The running track was closed at 1:45 a.m. on May 18.
Route: Starting straight to Truong Dinh - Turn right Nguyen Thi Minh Khai - Turn right Pham Ngoc Thach Street - Go straight to Paris commune - Go straight to Dong Khoi street - Turn on Ton Duc Thang Street - Turn Right Road Nguyen Hue - Turn left Le Thanh Ton Street - Turn left on Nguyen Hue Street (turn your head in the opposite direction) - Turn Le Loi Street - Turn right Pasteur Street - Turn left on Nguyen Du - Turn Truong Dinh - Labor, Labor, Labor
Alternative routes: vehicles traveling on the remaining route and following the instructions of the authorities and participants ensuring traffic order and safety on the race routes.