Construction of the second largest cable-stayed bridge in Vietnam underway

PHƯƠNG ANH |

Tra Vinh - Dai Ngai 1 Bridge crosses Dinh An channel of Hau River connecting Tra Vinh and Soc Trang provinces and is expected to be completed in 2028.

On December 9, Project Management Board 85 (Ministry of Transport) held a ceremony to launch the construction of Package 15-XL to construct Dai Ngai 1 Bridge and the approach roads at both ends of the bridge, part of the Dai Ngai Bridge Construction Investment Project.

Lanh dao Bo GTVT, tinh Tra Vinh, Soc Trang, chu dau tu, nha thau thuc hien nghi thuc khoi cong cau Dai Ngai 1. Anh: Phuong Anh
Leaders of the Ministry of Transport, Tra Vinh and Soc Trang provinces, investors and contractors performed the groundbreaking ceremony of Dai Ngai 1 Bridge. Photo: Phuong Anh

Package 15-XL for construction of Dai Ngai 1 bridge and approach roads at both ends of the bridge has a total construction value of 3,907 billion VND.

Dai Ngai 1 Bridge is over 3km long, the main bridge is 2.59km long, 21.5m wide, crossing Dinh An channel of Hau River, near the East Sea estuary, connecting Tra Cu district (Tra Vinh province) to Cu Lao Dung district (Soc Trang province).

The main cable-stayed bridge has 2 A-shaped towers 110m high (from the bridge deck), main span diagram (210+450+210)m. This is the 2nd largest cable-stayed bridge in Vietnam, after Can Tho bridge and equal to Vam Cong bridge.

Package 15-XL is implemented by a consortium led by Deo Ca Group. The implementation period is 1,250 days, expected to be completed in June 2028.

Phoi canh cau Dai Ngai 1. Anh: To Hung
Perspective of Dai Ngai 1 bridge. Photo: To Hung

When completed, Dai Ngai 1 Bridge, together with Rach Mieu Bridge, Ham Luong Bridge, and Co Chien Bridge, will improve the transportation capacity of the Mekong Delta region, creating convenient traffic connections between the southern coastal provinces and Ho Chi Minh City; shortening travel time, reducing transportation costs, expanding trade and breaking the monopoly of National Highway 1A.

The Dai Ngai Bridge construction investment project is located on National Highway 60 with a length of 15km, starting at the intersection with National Highway 54 in Hung Hoa Commune, Tieu Can District (Tra Vinh Province), and ending at the intersection with Nam Song Hau National Highway in Long Duc Commune, Long Phu District (Soc Trang Province). This is a Group A project, a special-grade road traffic project, with an investment capital of VND 7,962 billion. The entire project has 5 intersections, 7 bridges, divided into 4 bidding packages.

PHƯƠNG ANH
TIN LIÊN QUAN

Close-up of Hau River overpass about to close

|

Soc Trang - Dai Ngai 2 Bridge is expected to close at the end of December 2024 or early January 2025, striving to basically complete the bridge by April 2025.

Which contractor will build the second largest cable-stayed bridge in Vietnam

|

Soc Trang - Deo Ca Group consortium won the bid to construct Dai Ngai 1 bridge worth nearly 3,900 billion VND.

Techcombank and the confusing interest rate bonus program

|

The 0.5%-1% interest rate increase program at Techcombank attracts customers, but shows signs of a lack of transparency and clear commitment, raising many big questions.

General Department of Taxation thoroughly implements the work of streamlining and streamlining the apparatus

|

The General Department of Taxation has issued Official Dispatch No. 5712/TCT-TCCB directing the entire Tax sector on the work of restructuring the apparatus.

Working towards the goal of achieving net zero emissions by 2050

|

Mr. Nguyen Tuan Quang - Deputy Director of the Department of Climate Change, Ministry of Natural Resources and Environment believes that with the participation of the entire political system, people and businesses, the goal of achieving zero net emissions will become a reality.

New storm appears heading towards the East Sea on Christmas

|

New storm Querubin is forecast to form around Christmas. This is the latest storm expected to form near the South China Sea.

Workers pioneer in environmental protection

|

On the afternoon of December 12, in Hanoi, Lao Dong Newspaper organized an online forum "Workers' Forum for the Environment in 2024".

Close-up of Hau River overpass about to close

PHƯƠNG ANH |

Soc Trang - Dai Ngai 2 Bridge is expected to close at the end of December 2024 or early January 2025, striving to basically complete the bridge by April 2025.

Which contractor will build the second largest cable-stayed bridge in Vietnam

PHƯƠNG ANH |

Soc Trang - Deo Ca Group consortium won the bid to construct Dai Ngai 1 bridge worth nearly 3,900 billion VND.

2 tháng nữa sẽ lắp dầm cầu vượt sông Hậu cho cầu Đại Ngãi 2

PHƯƠNG ANH |

Dự kiến tháng 11.2024, nhà thầu sẽ tiến hành lắp dầm cầu Đại Ngãi 2.