Traffic

Demolishing the last construction to expand the central street of Hanoi

|

Hanoi - 2-story apartment building - the last project within the Nguyen Tuan road expansion project to be demolished to serve construction work.

The current condition of Vo Chi Cong street is being restored to its road surface

|

Hanoi - Vo Chi Cong Street is being restored to its road surface after a long period of partial barricades to serve the construction of the flood control system.

Ho Chi Minh City residents take free buses in the last 6 months of 2026

|

Ho Chi Minh City - From July 1 to the end of 2026, Ho Chi Minh City residents will be able to take free buses on 135 inter-provincial routes.

Starting traffic diversion for metro station construction on Van Cao street, Hanoi

|

Hanoi - Functional agencies begin barricading a part of Van Cao street to construct station S1 - Quan Ngua belonging to metro line No. 5.

Self-propelled truck crashes into power pole on National Highway 20 in Lam Dong

|

Lam Dong - A coffee truck suddenly drifted on its own, damaging many vehicles and breaking an electric pole on National Highway 20, fortunately no casualties were caused.

VND7,238 billion project in Can Tho faces difficulties

|

Can Tho - The project to upgrade and expand National Highway 91 (section from Km0 - Km7) with a total investment of VND 7,238 billion is being urgently implemented by the city.

Handling cars parked in a wrong manner, violating regulations in front of the bus station gate in Hanoi

|

Hanoi - In front of the gate of Yen Nghia bus station (Ha Dong district), there is a sign allowing cars and taxis to park for no more than 5 minutes. However, many drivers deliberately park overtime.

The country's largest bus station increases ticket prices from Da Nang on April 30

|

HCMC - The new Mien Dong Bus Station (Thu Duc City) - the largest and most modern in the country, will increase ticket prices by 40% on routes from Da Nang on April 29 and 30.

The section of Ring Road 1 through Ba Dinh District still has many premises waiting for clearance

|

Hanoi - Along the Ring Road 1 project section through Ba Dinh district, there are still many many premises waiting for clearance.

Latest images of the Hanoi Ring Road 4 project

|

Hanoi - Contractors are speeding up the construction progress, bringing the Ring Road 4 parallel road project to the finish line in October 2025 under the direction of the Chairman of the City People's Committee.

Opening a 2km long road through 2 districts of Dong Nai connecting to the airport

|

Dong Nai - The project to build a 25C road of more than 2km long from National Highway 51 to Huong Lo 19 through Long Thanh and Nhon Trach districts connects Long Thanh airport.

Morning in the West: The trillion-dong expressway is urgently reaching the finish line in 2026

|

Morning in the West on March 22: Before April 30, the landslide section in Vung Liem will be completed; the trillion-dong expressway will urgently reach the finish line in 2026;...

Removing obstacles to site clearance for Tam Trinh road expansion project

|

Hanoi - Many policies beneficial to people subject to site clearance for the Tam Trinh road expansion project have been submitted to the city by the competent authorities for consideration.

Early include the metro line connecting District 7 - Can Gio in the planning of Ho Chi Minh City

|

HCMC - The metro line project from District 7 to Can Gio proposed by Vingroup Corporation should be soon added to the general planning of HCMC as a basis for implementation.

Traffic police pick up and handle a three-wheeled vehicle traveling on the elevated Ring Road 3

|

Hanoi - Monitoring cameras discovered homemade three-wheeled vehicles traveling on the elevated Ring Road 3, the Traffic Police force then picked them up and handled them.

The 3,500 billion VND project in Quang Ngai is facing difficulties due to lack of land

|

The construction of the Hoang Sa - Doc Soi road project in Quang Ngai is delayed due to the low and not seamless site clearance.

HCMC uses the central area for the April 30 grand ceremony

|

Ho Chi Minh City will temporarily relocate 30/4 Park, part of Pasteur and Le Duan streets to prepare for activities to celebrate the 50th anniversary of the country's reunification.

Speed up the progress of expressway rest stops after having the site

|

Binh Thuan - People have handed over nearly 10 hectares of land in advance to construct the Vinh Hao - Phan Thiet expressway rest stop at Km205.

Scene of the accident that injured 8 people in Quang Binh

|

Quang Binh - The accident between a passenger bus, a tractor-trailer and a truck on National Highway 1 through Bo Trach district caused 8 people to be hospitalized for emergency care.

Adjusting the plan, reviewing the construction site of the Western Expressway

|

Can Tho - Investors and contractors are adjusting the plan, reviewing the construction teams of Chau Doc - Can Tho - Soc Trang expressway, urgently speeding up the progress.