Traffic
Man dies after motorbike crashes into truck in Lam Dong
|
Lam Dong - A man died after driving a motorbike into the rear of a truck traveling in the same direction through Thuan Hanh commune.
Boat not yet operating, students still cross the Cau River to school by canoe
|
Thai Nguyen - While the ferry terminal is completing procedures to resume operation, students are still moving to school by specialized canoe.
The largest barge stuck at My Chanh bridge has been relocated
|
Quang Tri - The largest barge trapped at My Chanh bridge and the railway bridge has been successfully moved and towed to a safe location by rescue forces.
Rushing to construct a nearly VND 2,970 billion intersection connecting the Ben Luc - Long Thanh expressway
|
Ho Chi Minh City - After more than two months of construction, the Rung Sac road intersection project connecting the Ben Luc - Long Thanh expressway is being urgently constructed.
Hai Phong adjusts ferry schedule from Dong Bai - Cai Vieng wharf to Cat Ba
|
Hai Phong - The management unit adjusts the ferry schedule at Dong Bai - Cai Vieng wharf to Cat Ba island to suit the travel needs of people and tourists.
Subjects that will be affected when applying motorbike emission standards
|
The motorbike emission standards will apply to agencies, organizations and individuals with activities related to motorbikes and mopeds.
Relocating the Ho Chi Minh City - Vung Tau high-speed train terminal at Bach Dang terminal to build a 1,000 billion VND pedestrian bridge
|
HCMC - The high-speed train line from the center of HCMC to Vung Tau has been suspended since May 5 to serve the construction of a pedestrian bridge across the Saigon River at Bach Dang wharf (District 1).
High-speed railway is mentioned in Resolution 68
|
The Central Executive Committee has just issued Resolution 68-NQ/TW on private economic development (Resolution 68). The Resolution mentions the high-speed railway project.
Hanoi reclaims land from more than 500 households to build overpasses, build a 10-lane road
|
Hanoi will reclaim land from more than 500 households to build an overpass at the intersection of Provincial Road 70 - Pham Tu and Tay Thang Long Road after many years of delay.
Image of the underpass at the largest intersection in Ho Chi Minh City about to open to traffic
|
HCMC - After many delays, the HC1 underpass - an important item at the An Phu intersection - is preparing to be put into operation from May 9.
HCMC builds bridges, opens roads, builds metro to go to sea
|
HCMC - Can Gio Metro, Can Gio Bridge, the southern coastal road, the intersection of Rung Sac Road and Ben Luc - Long Thanh Expressway help the city develop towards the sea.
Oil splatts cover the surface of the Bac Hong railway overpass
|
Hanoi - Concrete pumps traveling on the Bac Hong railway overpass, even though they are on the runway, cause oil stains to cover the bridge surface. The authorities quickly arrived.
taxi driver dies after colliding with a truck on National Highway 6
|
Hoa Binh - The authorities are clarifying the cause of the traffic accident on National Highway 6 that killed a taxi driver.
Construction progress of more than 23km of Hoa Lac - Hoa Binh Expressway
|
The Hoa Lac - Hoa Binh Expressway is expected to be completed in 2027.
HCMC abolishes 2 old decisions, revives Binh Tien bridge and road project worth nearly 6,300 billion VND
|
Ho Chi Minh City abolishes 2 old decisions on the Binh Tien bridge and road project (District 6, 8, Binh Chanh) to implement according to the new investment policy with a budget capital of nearly 6,300 billion VND.
Plan to start construction of 6 bridges connecting Dong Nai and Binh Duong in the next 2 years
|
Dong Nai - 6 bridges connecting Dong Nai province with Binh Duong province have been agreed on investment plans, expected to start construction in 2025 and 2026.
Hanoi to enforce land acquisition to build 40m wide, 6-lane road
|
Hanoi - The authorities will forcibly reclaim land from some households to implement the construction of a 41km long southern axis road, with an investment capital of more than VND6,000 billion.
People and businesses hope to soon upgrade National Highway 29
|
Dak Lak - People and businesses are looking forward to upgrading and repairing National Highway 29 to promote the socio-economic development of mountainous and marine areas.
The main road in Bac Kan is seriously degraded, danger lurks
|
Provincial road 256 connecting Cho Moi district and Na Ri district (Bac Kan) has seriously degraded after many years of use. The road surface is peeling, full of "potholes", posing a potential risk of accidents but has not been completely fixed.
People return to Hanoi conveniently, surprised by gateway traffic
|
Hanoi - By 6:00 p.m. on May 4, traffic on the gateway routes leading to the city center was not congested, vehicles moved smoothly.
