The degraded road in Quang An ward is about to be renovated

NGỌC THÙY |

According to the People's Committee of Tay Ho district, To Ngoc Van street (Quang An ward) is included in the district's construction and renovation plan and is expected to be implemented in 2025.

Theo ghi nhan cua Lao Dong, duong To Ngoc Van co long duong nho hep va xuat hien nhieu ranh nut, sut lun. (Anh chup doan dau duong To Ngoc Van giao voi duong Xuan Dieu).
According to Lao Dong, To Ngoc Van Street has a narrow roadbed and many cracks and subsidence. (Photo taken at the beginning of To Ngoc Van Street intersection with Xuan Dieu Street).
Con duong nhieu doan khong co via he, trong khi mat duong xuong cap da khien nguoi di bo va nguoi dieu khien phuong tien giao thong gap kho khan khi di chuyen.
Many sections of the road have no sidewalks, while the degraded road surface has made it difficult for pedestrians and drivers to move.
Mat duong bi hu hong nang khong chi gay mat my quan, ma con gay kho khan cho nguoi dan di lai.
The badly damaged road surface not only affects the aesthetics, but also makes it difficult for people to travel.
Ong Vu The Hao (tru phuong Quang An, Tay Ho) cho biet, nguoi dan sinh song va buon ban quanh khu vuc duong To Ngoc Van deu mong muon du an tu sua con duong nay som trien khai de thuan tien cho viec di lai, tranh nhieu rui ro tai nan khi luu thong.
Mr. Vu The Hao (residing in Quang An ward, Tay Ho) said that people living and doing business around To Ngoc Van street all hope that the project to repair this road will be implemented soon to facilitate travel and avoid many risks of traffic accidents.
Long duong nho hep, rac thai bi do tran lan khien cho con duong tro nen nhech nhac.
The narrow road and littered garbage make the road look dirty.
Truoc do, ngay 18.11. 2024, bao Lao Dong cung co bai phan anh ve tinh trang xuong cap tai con duong nay, dong thoi ghi nhan nguyen vong cua nguoi dan ve viec chinh quyen dia phuong can som co phuong an tu sua lai hien trang duong To Ngoc Van.
Previously, on November 18, 2024, Lao Dong newspaper also published an article reflecting on the deterioration of this road, and at the same time acknowledged the people's wishes that the local government should soon have a plan to repair the current status of To Ngoc Van street.
Ve viec nay, moi day, theo thong tin tu UBND quan Tay Ho, tuyen duong To Ngoc Van da nam trong ke hoach xay dung, cai tao cua quan.
Regarding this, recently, according to information from the People's Committee of Tay Ho district, To Ngoc Van street is included in the district's construction and renovation plan.
Khu vuc tien hanh cai tao, nang cap co tong chieu dai toan tuyen la 436m, diem dau giao voi duong Xuan Dieu, diem cuoi giao voi ngo 67 To Ngoc Van.
The area being renovated and upgraded has a total length of 436m, starting at the intersection with Xuan Dieu Street and ending at the intersection with Lane 67 To Ngoc Van.
Theo thiet ke, tuyen duong se co quy mo 2 lan xe, be rong mat duong la 7,5m. Be rong he pho 2 ben la 6m, be rong nen duong 13,5m. Tong muc dau tu cua du an hon 195 ti dong, trong do chi phi boi thuong, ho tro va tai dinh cu gan 158 ti dong.
According to the design, the road will have 2 lanes, the road surface width is 7.5m. The sidewalk width on both sides is 6m, the roadbed width is 13.5m. The total investment of the project is more than 195 billion VND, of which the cost of compensation, support and resettlement is nearly 158 billion VND.
Tuyen duong cung se duoc dau tu dong bo ha tang ky thuat, thoat nuoc, cay xanh, chieu sang, to chuc giao thong.
The route will also be invested in synchronous technical infrastructure, drainage, trees, lighting, and traffic organization.
De thuc hien du an, cac don vi chuc nang quan Tay Ho du kien se thu hoi khoang 2.121,5m2 dat. Trong do, 95 truong hop co dat nam trong chi gioi giai phong mat bang. Du kien du an se thuc hien trong nam 2025.
To implement the project, Tay Ho District authorities plan to reclaim about 2,121.5 square meters of land. Of these, 95 cases have land within the clearance boundary. The project is expected to be implemented in 2025.

NGỌC THÙY
TIN LIÊN QUAN

Estimated 3,000 billion VND to renovate weak bridges and temporary bridges in Hanoi

|

Hanoi - Currently, the city has about 172 weak bridges and temporary bridges that need to be rebuilt or renovated. The city People's Committee has just budgeted nearly 3,000 billion for repairs.

On the construction site of the renovation of 3 key national highways in Yen Bai

|

Yen Bai - After the storm and flood, many key routes connecting National Highway 37 and National Highway 70 from IC12 intersection to Van Hoi are being renovated and upgraded.

The project to renovate the longest canal in Ho Chi Minh City needs an additional 830 billion VND

|

The Tham Luong - Ben Cat - Nuoc Len canal renovation project, the longest canal in Ho Chi Minh City, needs an additional VND830 billion in capital due to the addition of some items.

8pm News: The reason why more than 9,000 red books in Tuyen Quang were revoked

|

News at 8pm on November 20: Teachers do not accept living richly, surrounded by poor people; After inspection, more than 9,000 red books in Tuyen Quang were revoked...

Appointing 2 more Deputy Directors of Binh Duong Provincial Police

|

Lieutenant Colonel Bui Thanh Truc and Lieutenant Colonel Phan Huy Van were appointed as Deputy Directors of Binh Duong Provincial Police.

Don't skip Nam Dinh to go straight to Da Nang quickly

|

According to the delegate, the North-South high-speed railway must reach all densely populated areas, not bypass Nam Dinh to run straight to Da Nang quickly.

Ho Chi Minh City has rectified the case of collecting additional fees when registering for residence

|

Ho Chi Minh City - Trung My Tay Ward Police, District 12 promptly corrected the information "Paying online fees still being charged additional fees for residence registration" posted on Lao Dong Newspaper.

The Secretariat appoints Deputy Chief of the Central Party Office

|

The Secretariat appointed Mr. Vo Thanh Hung - Deputy Minister of Finance - to hold the position of Deputy Chief of the Party Central Office.

Estimated 3,000 billion VND to renovate weak bridges and temporary bridges in Hanoi

Đền Phú - Minh Thương |

Hanoi - Currently, the city has about 172 weak bridges and temporary bridges that need to be rebuilt or renovated. The city People's Committee has just budgeted nearly 3,000 billion for repairs.

On the construction site of the renovation of 3 key national highways in Yen Bai

Trần Bùi |

Yen Bai - After the storm and flood, many key routes connecting National Highway 37 and National Highway 70 from IC12 intersection to Van Hoi are being renovated and upgraded.

The project to renovate the longest canal in Ho Chi Minh City needs an additional 830 billion VND

MINH QUÂN |

The Tham Luong - Ben Cat - Nuoc Len canal renovation project, the longest canal in Ho Chi Minh City, needs an additional VND830 billion in capital due to the addition of some items.