Prime Minister directs handling of erosion on 10,853 billion VND expressway

PHẠM ĐÔNG |

The Prime Minister assigned the Minister of Construction to inspect and handle the erosion on the Vinh Hao - Phan Thiet expressway, and report the results before September 25.

The Government Office has just issued Document No. 8744/VPCP-CN dated September 16, 2025, conveying the direction of Politburo member and Prime Minister Pham Minh Chinh on inspecting and handling the erosion on the Vinh Hao - Phan Thiet Expressway.

According to the reflection, after heavy rains, many locations along the Vinh Hao - Phan Thiet expressway in the north-south direction from Ham Thuan Bac commune to Ham Liem commune (on the more than 10km route) were damaged. Rainwater overflowed onto the roadbank, forming large ditches and erosion holes.

Regarding this issue, Prime Minister Pham Minh Chinh assigned the Minister of Construction to inspect and handle; report to the Prime Minister on the implementation results before September 25.

Previously, Lao Dong Newspaper published an article reflecting "Erdosion and dangerous frog jaw openings on the Vinh Hao - Phan Thiet Expressway".

According to the article, after more than 2 years of operation, on the Vinh Hao - Phan Thiet expressway, a location of roadbed erosion and a frog jaw opening appeared at km213+750 (right of the route) in Ham Liem commune, Lam Dong province.

It is worth mentioning that the erosion has eaten deep into the roadbed, causing open jaw blades, forming holes and seeing a layer of rock falling onto the roadbed.

This erosion poses a risk to the safety of vehicles running on the expressway. In particular, if it continues to rain heavily and overloaded vehicles pass by, there is a high risk of subsidence of the road surface.

The Vinh Hao - Phan Thiet Expressway through the old Binh Thuan with a total investment of VND10,853 billion was opened to traffic more than two years ago.

This expressway, over 100km long, is a section of the North-South expressway in the East, connecting the South Central region with the Southeast region, helping to shorten travel time from Phan Thiet to Nha Trang, Ho Chi Minh City.

PHẠM ĐÔNG
RELATED NEWS

Vinh Hao - Phan Thiet Expressway shows erosion, dangerous frog jaw openings

|

Lam Dong - The roadbed of the Vinh Hao - Phan Thiet expressway has eroded and has open frog jaw, causing a risk of insecurity for vehicles participating in traffic.

Vinh Hao - Phan Thiet Expressway faces difficulties due to site clearance problems

|

Lam Dong - items related to the Vinh Hao - Phan Thiet expressway are facing problems with site clearance, affecting progress.

Complete 5 component projects of the North - South expressway in Ha Tinh, Quang Tri in 2025

|

The Deputy Prime Minister requested ministries, branches and localities to accelerate the implementation of 5 component projects of the North - South expressway in Ha Tinh and Quang Tri provinces.

Electricity consumption deviates from GDP growth: Statistics Department explains the reason

|

GDP in 2025 grew at a high level of 8.02%, but the total commercial electricity output of the entire system only increased by 4.9%, much lower than the previous year.

Suoi Sap is encroached upon, people worry about landslides

|

Son La - People in Long Sap commune are worried about the situation of soil and rock encroachment on the Sap stream, causing the flow to narrow, risk of landslides, and unsafety during the rainy and flood season.

Houses in Hanoi emit many explosions and then catch fire, 3 people injured and killed

|

Hanoi - The 2nd floor of a house in a residential area suddenly caught fire after many loud explosions. Initial determination shows 3 casualties.

Athletes receive increased salaries and nutrition

|

The new Government Decree adjusts the spending level on salary, training wages, nutrition and achievement allowances for coaches and athletes.

Types of housing projects are exempt from construction permits from July 1st

|

From July 1st, individual houses with a scale of less than 7 floors with a total floor area of less than 500m2 are eligible for exemption from construction permits.

Vinh Hao - Phan Thiet Expressway shows erosion, dangerous frog jaw openings

Duy Tuấn |

Lam Dong - The roadbed of the Vinh Hao - Phan Thiet expressway has eroded and has open frog jaw, causing a risk of insecurity for vehicles participating in traffic.

Vinh Hao - Phan Thiet Expressway faces difficulties due to site clearance problems

Duy Tuấn |

Lam Dong - items related to the Vinh Hao - Phan Thiet expressway are facing problems with site clearance, affecting progress.

Complete 5 component projects of the North - South expressway in Ha Tinh, Quang Tri in 2025

PHẠM ĐÔNG |

The Deputy Prime Minister requested ministries, branches and localities to accelerate the implementation of 5 component projects of the North - South expressway in Ha Tinh and Quang Tri provinces.