Tay Bac Evening News: Cutting mountains to make roads costs more than 50 billion VND/km

NHÓM PV |

Cutting mountains to build roads costs over 50 billion VND/km; Losing sleep in houses at the foot of the hill with cracks; Female football player in the highlands still competes on the field before her wedding day...

NHÓM PV
RELATED NEWS

Female highland player competes on the field before wedding day

|

Cheers continuously resounded in the stadium of Tua Chua district, Dien Bien province every time female player from the mountainous region Tan Thi Pen got on the ball.

Loss of sleep in the cracked houses at the foot of the hill

|

Yen Bai - After the historic flood, many landslides appeared in Yen The town, Luc Yen district, threatening people's lives and homes.

Digging mountains and filling fields to build roads costs more than 50 billion VND/km in Tuyen Quang

|

After nearly 3 years of digging mountains and filling fields, the nearly 9km long road connecting Tuyen Quang - Phu Tho expressway with National Highway 2D is gradually taking shape.

Update on gasoline and oil prices on April 11: World oil prices reverse sharply

|

Update on gasoline and oil prices on April 11: In today's trading session, world oil prices reversed to decrease.

Live volleyball VTV Binh Dien Long An vs Geleximco Hung Yen

|

Live VTV Binh Dien Long An and Geleximco Hung Yen at the national volleyball championship, taking place at 5:00 PM today (April 11).

Forecast of the risk of very strong storms in 2026

|

In 2026, the ENSO phase transition - atmosphere - ocean conditions are forecast to be unstable, which may be the cause of very strong storms.

The appearance of the 10-lane road in Dong Nai connecting Ho Chi Minh City is about to open to traffic

|

Dong Nai - Road 25B (Ton Duc Thang road) from National Highway 51 to the center of Nhon Trach commune is about to be opened to traffic with 10 lanes.

Explaining why the 72 billion VND irrigation project has not been handed over after many pipe bursts

|

Dak Lak - The Provincial Department of Agriculture and Environment has explained the reason for not being able to hand over the 72 billion VND irrigation project after many pipe bursts.

Female highland player competes on the field before wedding day

Nhóm PV |

Cheers continuously resounded in the stadium of Tua Chua district, Dien Bien province every time female player from the mountainous region Tan Thi Pen got on the ball.

Loss of sleep in the cracked houses at the foot of the hill

Trần Bùi |

Yen Bai - After the historic flood, many landslides appeared in Yen The town, Luc Yen district, threatening people's lives and homes.

Digging mountains and filling fields to build roads costs more than 50 billion VND/km in Tuyen Quang

Việt Bắc |

After nearly 3 years of digging mountains and filling fields, the nearly 9km long road connecting Tuyen Quang - Phu Tho expressway with National Highway 2D is gradually taking shape.