4 options to take the metro from Tan Son Nhat airport to Long Thanh

MINH QUÂN |

Ho Chi Minh City has been and is studying 4 options to connect Tan Son Nhat and Long Thanh airports by metro, aiming to form a rapid transit network between the two airports.

On May 28, the Ho Chi Minh City Urban Railway Management Board (MAUR) said that Ho Chi Minh City has been and is researching 4 options for connecting Tan Son Nhat and Long Thanh airports by urban railway (metro), aiming to form a smooth, fast and convenient travel journey for people.

Option 1: Metro No. 2 combined with Thu Thiem - Long Thanh railway

According to this plan, passengers from Tan Son Nhat airport will move to Ba Queo station to take Metro Line 2 (Tham Luong - Ben Thanh - Thu Thiem). After that, passengers continue to switch to the Thu Thiem - Long Thanh railway line at Thu Thiem station to go to Long Thanh airport.

Option 2: Metro line 6 connects directly to the East

In the second option, passengers travel from Tan Son Nhat airport by Metro Line No. 6 phase 1 (Tan Son Nhat International Airport - Phu Huu).

From Phu Huu intersection, passengers continue to connect with the Thu Thiem - Long Thanh railway line to move to Long Thanh airport.

Option 3: Combine Metro No. 4 and Metro No. 2

With this option, passengers traveling on Metro Line No. 4 (Dong Thanh - Hiep Phuoc) from Tan Son Nhat airport area to Ben Thanh station. Here, passengers switch to Metro Line No. 2 to reach Thu Thiem station, then continue to the Thu Thiem - Long Thanh railway line.

Option 4: Metro connection between Ho Chi Minh City and Dong Nai

This is the option with the longest connecting journey, combining many metro lines of Ho Chi Minh City and Dong Nai.

Passengers from Tan Son Nhat airport take Metro Line 2 to Ben Thanh station, then switch to Metro Line 1 (Ben Thanh - Suoi Tien). Next, passengers connect to Metro Line 2 of Dong Nai province and continue to Thu Thiem - Long Thanh railway to Long Thanh airport.

According to MAUR, Ho Chi Minh City is currently prioritizing investment in a connecting axis through Metro Line No. 2 combined with Thu Thiem - Long Thanh railway line.

In which, the Ben Thanh - Tham Luong section and the Ben Thanh - Thu Thiem section are under construction, expected to be completed and put into operation in 2030.

For the Thu Thiem - Long Thanh railway line, the project is expected to start construction before July 2, 2026 and be completed in 2030.

In parallel, Metro Line 6 is also prioritized for investment to supplement the transport corridor, meet travel needs and enhance connectivity between the two airports in the future.

MINH QUÂN
RELATED NEWS

Ho Chi Minh City requests commencement of Thu Thiem - Long Thanh railway before July 2nd

|

Ho Chi Minh City requests to focus maximum resources to complete procedures and ensure the commencement of the Thu Thiem - Long Thanh railway line before July 2, 2026.

Ben Thanh - Thu Thiem Metro opens axis connecting Ho Chi Minh City with Long Thanh airport

|

Ho Chi Minh City - Ben Thanh - Thu Thiem Metro, 6 km long, with a total capital of 46.300 billion VND, will start construction tomorrow morning (April 29), helping to increase connectivity between the center of Ho Chi Minh City and Long Thanh airport.

Ho Chi Minh City accelerates the extension of Metro Line No. 1 to Long Thanh airport

|

Ho Chi Minh City urgently implements preparation steps to extend Metro Line No. 1 (Ben Thanh - Suoi Tien) directly connecting to Long Thanh International Airport.

Ministry of Industry and Trade responds to concerns about the compatibility of car engines when using E10 gasoline

|

According to Deputy Minister Nguyen Sinh Nhat Tan, most cars and motorbikes currently in circulation in Vietnam can use E10 gasoline as recommended by manufacturers.

Strong El Nino is coming soon, forecast of increased risk of intense heatstroke

|

When the El Nino phase begins to have a strong impact, hot weather in Vietnam will continue to last and increase pressure in both intensity and frequency in the coming months.

Thai Nguyen Chairman directs inspection of ash and slag storage yard on the Cau River bank

|

After the reflection of Lao Dong Newspaper, the Chairman of Thai Nguyen Provincial People's Committee directed functional sectors to inspect the ash and slag storage yard near the Cau River bank and strictly handle violations if any.

US launches new airstrike on Iran

|

US launches new airstrike on Iran on the morning of May 28, Vietnam time.

Summoning 780 official delegates to attend the 14th Vietnam Trade Union Congress

|

The Presidium of the Vietnam General Confederation of Labour has just issued a Decision on convening delegates to attend the 14th Vietnam Trade Union Congress, term 2026-2031 (Decision).

Ho Chi Minh City requests commencement of Thu Thiem - Long Thanh railway before July 2nd

MINH QUÂN |

Ho Chi Minh City requests to focus maximum resources to complete procedures and ensure the commencement of the Thu Thiem - Long Thanh railway line before July 2, 2026.

Ben Thanh - Thu Thiem Metro opens axis connecting Ho Chi Minh City with Long Thanh airport

MINH QUÂN |

Ho Chi Minh City - Ben Thanh - Thu Thiem Metro, 6 km long, with a total capital of 46.300 billion VND, will start construction tomorrow morning (April 29), helping to increase connectivity between the center of Ho Chi Minh City and Long Thanh airport.

Ho Chi Minh City accelerates the extension of Metro Line No. 1 to Long Thanh airport

MINH QUÂN |

Ho Chi Minh City urgently implements preparation steps to extend Metro Line No. 1 (Ben Thanh - Suoi Tien) directly connecting to Long Thanh International Airport.