Society

Deadline for adjusting pensions and social insurance allowances according to Conclusion 206-KL/TW in 2025

|

Pensions and social insurance allowances according to Conclusion 206-KL/TW, to be completed no later than March 2026.

Unseasonal rain forecast continues to appear, affecting durian yield in the Mekong Delta

|

Mekong Delta - According to warnings, main-season durian in the Mekong Delta is at risk of reducing yield and quality due to unseasonal rain increasing the possibility of disease.

Domestic waste scattered on the 2.5 Ring Road project construction site

|

Hanoi - People living next to Ring Road 2.5 section passing through Cau Giay reflect that the project site has been turned into a spontaneous waste collection point.

Social insurance answers about transferring health insurance benefits from 80% to 100%

|

Ninh Binh Provincial Social Insurance informs about the necessary procedures when transferring health insurance benefits to near-poor households.

Green Transition" with smart investment in nature brings sustainable growth

|

Hanoi - March 3, 2026, a technical training workshop with the theme "Application of GTAP-InVEST model in spatial planning and integrated development" was held in Hanoi to promote green transformation.

Hanoi is dismantling a series of constructions to open a 21m wide road

|

Hanoi - Many housing projects have been and are being dismantled by the authorities to widen Nguyen Tuan Street to 21m, with an investment capital of nearly 400 billion VND.

Price database, ensuring sustainability in the supply of drugs and medical supplies

|

Despite many efforts by the medical sector, drug shortages still exist in some places at certain times and are only limited to certain items such as rare drugs, drugs that are too cheap, or items that medical facilities rarely treat. However, medical facilities believe that it is necessary to build a price database to help ensure the sustainability of drug and medical supplies supply.

How are the relic sites in Hue after storm Trami?

|

HUE - After being affected by storm Trami, the relics in Hue are safe, with only a small amount of damage to trees and light bulbs.

The moment when people in the mountainous region of Quang Binh abandoned their belongings and fled the flood

|

Quang Binh - People in the mountainous district of Le Thuy are still shocked by the sudden flood, forcing them to abandon their belongings and flee for their lives.

Nu Village "reborn" with new concrete stilt houses

|

After more than a month of construction, the first concrete stilt houses at the Lang Nu resettlement area, Phuc Khanh commune, Bao Yen district, Lao Cai province have been completed.

Quang Nam mountainous area faces risk of landslides after storm

|

Quang Nam mountainous area is continuously experiencing unusual subsidence and mountain cracks over a large area, leading to a high risk of landslides, threatening thousands of people.

Morning news: Many problems at urban area 379 in Thai Binh

|

Morning news on October 30: Many problems at urban area 379 in Thai Binh; Fishermen support the transportation of relief goods to the flood center of Quang Binh;...

Weather today October 30: Northern region has showers

|

Weather today October 30, the Northern region has scattered showers; the lowest temperature in the North is about 17 - 20 degrees Celsius, in mountainous areas some places are below 17 degrees Celsius.

After colliding with a car, he was run over and died by a trailer

|

Phu Yen - Colliding with a car going in the same direction, the man suddenly fell onto the road and was run over and killed on the spot by a tractor-trailer.

High-speed railway will be the project with the largest investment in history

|

According to Deputy Minister of Planning and Investment, the high-speed railway project with an estimated investment of 70 billion USD will be the project with the largest public investment in history.

Renovation of the longest canal in Ho Chi Minh City faces obstacles, risk of delay

|

The Tham Luong - Ben Cat - Rach Nuoc Len canal renovation project, the longest canal in Ho Chi Minh City, has only completed 37.9% of its volume after nearly two years of implementation.

Fear of fire with no escape in old apartment building in HCMC

|

HCMC - The degraded fire protection system and the "no-escape" design of apartment buildings are a nightmare for many households in case of a fire or explosion.

Soc Trang farmers still have income despite flood waters inundating their fields

|

Soc Trang - Water is rising across the fields in the low-lying areas of My Tu district and Nga Nam town. Farmers are busy going to the fields to exploit natural resources for extra income.

Nguyen Xien sidewalk is encroached and seriously degraded

|

The sidewalk of Nguyen Xien Street (Thanh Xuan District, Hanoi) has cracked, sunk and seriously degraded after a period of use.

3rd publication of Vietnam Immigration Profile

|

On October 29, in Hanoi, the Ministry of Foreign Affairs in collaboration with the International Organization for Migration (IOM) organized a workshop to announce the Vietnam Migration Profile 2023.