Hundreds of people have been evacuated from areas at risk of flooding and landslides

HƯNG THƠ |

In two mountainous districts of Quang Tri province, local authorities have evacuated hundreds of people from areas at risk of flooding and landslides caused by storm No. 4.

On the afternoon of September 19, storm No. 4 made landfall in Quang Tri province and weakened into a low pressure area, causing widespread rain.

As of 4:00 p.m. on September 19, the entire Quang Tri province had evacuated 1,073 households/2,937 people to safe places in Gio Linh district: 90 households/198 people; Dong Ha city: 52 households/144 people; Hai Lang district: 5 households/9 people; Huong Hoa district: 32 households/143 people; Trieu Phong: 33 households/39 people; Quang Tri town: 129 households/516 people; Cam Lo: 644 households/1,554 people; Dakrong: 88 households/143 people.

Nguoi dan duoc luc luong cong an, bien phong, chinh quyen dia phuong van dong di doi de tranh sat lo, ngap lut. Anh: P.Vinh.
People were mobilized by the police, border guards, and local authorities to evacuate to avoid landslides and flooding. Photo: P. Vinh

Up to this point, heavy rains have caused water levels to rise, inundating the spillways from 0.4 to 1.5 meters; causing many points to be cut off. In Dakrong district, A Ngo - A Bung spillway on National Highway 15D, Ta Rut - A Ngo spillway, Ly Ton spillway in Ta Long commune, Lang Cat village spillway in Dakrong commune, spillway in resettlement area of ​​Huc Nghi commune, Ba Long spillway, Ba Long commune are cut off due to rising water.

Nguoi dan o xa Huong Lap, Huong Viet (huyen Huong Hoa, tinh Quang Tri) duoc di doi toi noi an toan. Anh: P.Vinh.
People in Huong Lap and Huong Viet communes (Huong Hoa district, Quang Tri province) were evacuated to a safe place. Photo: P. Vinh

On Ho Chi Minh road through Dakrong district, a landslide occurred at Km 267 + 700 with a volume of about 50m3 spilling over 2/3 of the road surface.

The road from Huong Tan commune to Huong Linh (Huong Hoa district) is experiencing slight landslides at Km2+150 to Km 3+300.

The heavy rains and floods caused the water level to rise, inundating the spillways from 0.3m to 1m in Huong Hoa district, causing many points to be isolated. Such as the spillway in Cooc village, Huong Linh commune; the spillway in Loa village, the spillway in Trum village, Ba Tang commune; the spillway in Ban Bu village, the spillway in Tan Trung village, Tan Lap commune, the spillway in Lia Di commune, Xy commune; the spillway in Huc Thuong, the spillway in Van Ri commune, Huc commune; the spillway in Cheng village, Tan Lien commune; the spillway in A Doi Co commune, A Doi commune; the spillway in Trang Ta Puong village, the new resettlement area in Huong Viet commune; the spillway in Ta Xia village, the spillway in Cu Ta Ka commune, Huong Loc commune; the spillway in Thanh O village, the bridge in Ban 10 village, Thanh commune; the spillway in Nguon Rao village, the bridge in Tria village, the bridge in Ho village, Huong Son commune; the spillway in Xi Nuc village, Tan Long commune; the spillway in Ban 3 commune, Thuan commune.

Currently, at deeply flooded and isolated areas and landslide areas, localities have deployed shock forces, police, and military to organize guarding; set up barriers to ensure safety for people and vehicles passing by.

HƯNG THƠ
RELATED NEWS

Iran elects new Supreme Leader, Israel declares it will eliminate any successor

|

Iran elected cleric Mojtaba Khamenei as Supreme Leader, replacing his father Ayatollah Ali Khamenei who died in a US-Israel airstrike.

Caring for ornamental plants after Tet in Da Nang, prices range from a few hundred to several million VND

|

Da Nang - After the Lunar New Year, many gardeners are taking care of and nurturing ornamental apricot blossoms and bonsai with prices ranging from several hundred thousand to several million VND per tree.

More than 694 billion VND to build 6 km of road in Quang Ngai, still unfinished after 6 years

|

Quang Ngai - More than 6 km long, but the Thach Bich - Tho Phong road project has not been completed for many years due to site clearance problems, provincial leaders directly inspected and removed it 4 times.

Ho Chi Minh City proposes businesses not to work overtime on March 15 to allow workers to vote

|

Ho Chi Minh City proposes that businesses not organize overtime and overtime to create conditions for workers and laborers to participate in elections on March 15, 2026.

High school learning case before graduating from secondary school: Handling is under the authority of the locality

|

Quang Tri - After the reflection of Lao Dong Newspaper, studying high school before graduating from secondary school is determined to be under the authority of the local Party Committee to consider and handle according to regulations.

Da Nang voters trust in the qualifications and bravery of National Assembly Deputy candidates

|

Da Nang - Voters highly appreciate the qualifications and capacity of National Assembly candidates and expect elected delegates to pursue issues of concern to the people to the end.

Bão vào đất liền, sông suối ở miền núi Quảng Trị nước dâng

HƯNG THƠ |

Bão số 4 đi vào đất liền và gây mưa lớn ở tỉnh Quảng Trị, khiến ngầm, tràn ở khu vực miền núi bị ngập, gây chia cắt, cô lập một số bản làng.

“Seal” the storm prevention class No. 4 in Quang Tri

HƯNG THƠ |

To prevent storm No. 4, teachers with the support of forces in Quang Tri went to the school to evacuate teaching equipment and "seal" the classrooms.

Landslide in Quang Binh mountain area causes cracks in houses

CÔNG SÁNG |

A large amount of landslides caused cracks in people's houses in Quang Binh.