Hundreds of people have been evacuated from areas at risk of flooding and landslides

HƯNG THƠ |

In two mountainous districts of Quang Tri province, local authorities have evacuated hundreds of people from areas at risk of flooding and landslides caused by storm No. 4.

On the afternoon of September 19, storm No. 4 made landfall in Quang Tri province and weakened into a low pressure area, causing widespread rain.

As of 4:00 p.m. on September 19, the entire Quang Tri province had evacuated 1,073 households/2,937 people to safe places in Gio Linh district: 90 households/198 people; Dong Ha city: 52 households/144 people; Hai Lang district: 5 households/9 people; Huong Hoa district: 32 households/143 people; Trieu Phong: 33 households/39 people; Quang Tri town: 129 households/516 people; Cam Lo: 644 households/1,554 people; Dakrong: 88 households/143 people.

Nguoi dan duoc luc luong cong an, bien phong, chinh quyen dia phuong van dong di doi de tranh sat lo, ngap lut. Anh: P.Vinh.
People were mobilized by the police, border guards, and local authorities to evacuate to avoid landslides and flooding. Photo: P. Vinh

Up to this point, heavy rains have caused water levels to rise, inundating the spillways from 0.4 to 1.5 meters; causing many points to be cut off. In Dakrong district, A Ngo - A Bung spillway on National Highway 15D, Ta Rut - A Ngo spillway, Ly Ton spillway in Ta Long commune, Lang Cat village spillway in Dakrong commune, spillway in resettlement area of ​​Huc Nghi commune, Ba Long spillway, Ba Long commune are cut off due to rising water.

Nguoi dan o xa Huong Lap, Huong Viet (huyen Huong Hoa, tinh Quang Tri) duoc di doi toi noi an toan. Anh: P.Vinh.
People in Huong Lap and Huong Viet communes (Huong Hoa district, Quang Tri province) were evacuated to a safe place. Photo: P. Vinh

On Ho Chi Minh road through Dakrong district, a landslide occurred at Km 267 + 700 with a volume of about 50m3 spilling over 2/3 of the road surface.

The road from Huong Tan commune to Huong Linh (Huong Hoa district) is experiencing slight landslides at Km2+150 to Km 3+300.

The heavy rains and floods caused the water level to rise, inundating the spillways from 0.3m to 1m in Huong Hoa district, causing many points to be isolated. Such as the spillway in Cooc village, Huong Linh commune; the spillway in Loa village, the spillway in Trum village, Ba Tang commune; the spillway in Ban Bu village, the spillway in Tan Trung village, Tan Lap commune, the spillway in Lia Di commune, Xy commune; the spillway in Huc Thuong, the spillway in Van Ri commune, Huc commune; the spillway in Cheng village, Tan Lien commune; the spillway in A Doi Co commune, A Doi commune; the spillway in Trang Ta Puong village, the new resettlement area in Huong Viet commune; the spillway in Ta Xia village, the spillway in Cu Ta Ka commune, Huong Loc commune; the spillway in Thanh O village, the bridge in Ban 10 village, Thanh commune; the spillway in Nguon Rao village, the bridge in Tria village, the bridge in Ho village, Huong Son commune; the spillway in Xi Nuc village, Tan Long commune; the spillway in Ban 3 commune, Thuan commune.

Currently, at deeply flooded and isolated areas and landslide areas, localities have deployed shock forces, police, and military to organize guarding; set up barriers to ensure safety for people and vehicles passing by.

HƯNG THƠ
RELATED NEWS

The approach road to Ba Ngan bridge was swept away by floodwaters, Da Nang deploys emergency construction

|

Da Nang declares an emergency situation to repair the eroded Duy Phuoc bridge approach road.

Mr. Lo Minh Hung was elected Chairman of the People's Council of Son La province

|

Son La - On the afternoon of November 21, the Provincial People's Council held its 37th thematic meeting to complete the positions of Chairman, Vice Chairman of the Provincial People's Council and Member of the Provincial People's Committee.

Vietnam Journalists Association improves journalism efficiency, shares with people in flooded areas

|

Lam Dong - Chairman of the Vietnam Journalists Association emphasized that in the flood, the press must put responsibility and humanity first.

Rescuing 14 workers who have been hungry for many days at the highway construction site

|

Dak Lak - Authorities have approached the scene to rescue a group of workers trapped in flooded areas while constructing the North-South Expressway.

Floods exceed historical levels, the Central region needs friends right now

|

Let's look towards the Central region through the Golden Heart Social Charity Fund so that people are not alone in the midst of the fierce flood.

Selling 15 bowls of pho per day is exceeding the taxable revenue threshold of 200 million VND/year

|

Many business households said that the revenue of 200 million VND/year is no longer suitable when costs increase sharply, causing them to still exceed the taxable threshold even though the profit is very low.

Bão vào đất liền, sông suối ở miền núi Quảng Trị nước dâng

HƯNG THƠ |

Bão số 4 đi vào đất liền và gây mưa lớn ở tỉnh Quảng Trị, khiến ngầm, tràn ở khu vực miền núi bị ngập, gây chia cắt, cô lập một số bản làng.

“Seal” the storm prevention class No. 4 in Quang Tri

HƯNG THƠ |

To prevent storm No. 4, teachers with the support of forces in Quang Tri went to the school to evacuate teaching equipment and "seal" the classrooms.

Landslide in Quang Binh mountain area causes cracks in houses

CÔNG SÁNG |

A large amount of landslides caused cracks in people's houses in Quang Binh.