Proposal to build Phu Yen - Dak Lak expressway

Hoài Luân - Chí Long |

The Dak Lak - Phu Yen Inter-provincial People's Committee has just submitted a proposal for an investment plan to build a high-speed road under the public-private partnership method.

According to the submission submitted by leaders of the two localities to Prime Minister Pham Minh Chinh and Deputy Prime Minister Tran Hong Ha on an investment plan to build the Phu Yen - Dak Lak expressway, from the North - South expressway in the East to National Highway 14 under the public-private partnership (PPP) method, the BOT contract has State capital participation.

Regarding the total investment scale, the expected length is 122km, the starting point intersects with the North-South expressway in the east, the end point intersects with National Highway 14. The scale of 4 lanes is complete, with continuous emergency lanes, roadbed width is 24.75m, designed speed of 100km/h.

The total investment capital is about VND 29,655 billion, the project implementation period is from 2025 to 2029.

The investment in the Phu Yen - Dak Lak expressway aims to form an East - West horizontal axis connecting the Central Highlands with the South Central Coast, connecting the vertical axis system (North - South expressway in the East, North - South expressway in the West, Ho Chi Minh road, Truong Son Dong road, National Highway 1, coastal road).

At the same time, promoting the effectiveness of projects that have been and are being invested in, meeting transportation needs; creating room and momentum for regional spatial development with a synchronous and modern technical infrastructure system, social infrastructure, connecting economic centers, seaports, dry ports, border gates, economic zones, industrial parks, connecting the North - South and East - West economic corridors to open up new development space.

According to the leaders of the two localities, currently, National Highway 29 connecting the main provinces of Phu Yen - Dak Lak still has many sections with narrow roads, small curved road radius, low road surface structure, locally damaged, only to ensure smooth traffic needs.

The policy of merging Phu Yen and Dak Lak provinces, the administrative center located in Dak Lak province, the above expressway is to meet the transportation needs, connect Tuy Hoa - Buon Ma Thuot cities and connect ports, industrial parks, economic zones to serve tourism development, economy - society, and ensure national defense - security.

Therefore, the two localities recommended that the Government prioritize investment in the Phu Yen - Dak Lak expressway from the North - South expressway in the East to National Highway 14 with an investment process before 2030.

The Prime Minister is requested to consider approving investment in projects under the PPP method, BOT contract and adding the project to the investment portfolio from the central budget in the medium-term plan for the period 2026 - 2030. Assign the People's Committee of Phu Yen province (before the merger of provinces) and the People's Committee of the new Dak Lak province (when the province is merged) to be the competent authority to implement the investment project to build the Phu Yen - Dak Lak expressway, the section from the North - South expressway in the East to National Highway 14.

Hoài Luân - Chí Long
RELATED NEWS

Phu Yen conducts a trial of a new commune-level government model in 2 localities

|

Phu Yen selected Binh Kien ward and Phu Hoa 1 commune (Tuy Hoa city) to organize a trial operation of the new commune-level government model, from June 16-20,

sad news

|

Mr. Ngo Duy Son, born in 2013, passed away at 1:45 p.m. on December 10, 2025 (ie October 21, At Ty year), at the age of 93.

The role of the Vietnam Fatherland Front in the market economy and international integration in the current period

|

On December 10, in Hanoi, the Standing Committee of the Central Committee of the Vietnam Fatherland Front organized a scientific workshop on "New factors of market economy and international integration affecting the gathering work, promoting the strength of national solidarity and the role of the Vietnam Fatherland Front in implementing a market economy in our country".

SEA Games 33 Medal Schedule on December 10: Vietnam temporarily ranked 4th

|

Updated the total score for the 33rd SEA Games medal table after the end of the competition on December 10.

Image processing process of AI cameras is about to spread in Hanoi

|

Hanoi - The City Police are about to put into operation more than 1,800 AI cameras, installed at nearly 200 intersections in the area.

Hour 9: Divorced but still living together - Part 1

|

Hour 9 No. 180 - Postpartum depression, the pressure to take care of 2 young children makes the wife exhausted. Too stuck, she filed for divorce. Can this marriage be saved?

Unusual stem cell liposuction service at Chang Cosmetic Clinic

|

Many promotional videos of AI claiming to be doctors, along with strange activities at the CW Endocrinology and Aesthetics Institute (Chang Cosmetic Clinic) performing absorbed stem cell services.

Cựu cán bộ UBKT Tỉnh ủy Phú Yên lừa chạy án để chiếm đoạt 600 triệu

Hoài Luân |

Phú Yên - Ngày 16.6, TAND tỉnh mở phiên tòa xét xử sơ thẩm và tuyên phạt bị cáo Lê Hải (nguyên Phó phòng Nghiệp vụ 1 Cơ quan UBKT Tỉnh ủy Phú Yên) 8 năm tù.

2 nhóm thanh thiếu niên mang dao, bom xăng hỗn chiến trong đêm ở Phú Yên

Hoài Luân |

Phú Yên - Cơ quan công an đã khởi tố nhiều đối tượng liên quan đến vụ hỗn chiến xảy ra trong đêm, trên Quốc lộ 25, đoạn qua địa phận huyện Sơn Hòa.

Phu Yen conducts a trial of a new commune-level government model in 2 localities

Hoài Luân |

Phu Yen selected Binh Kien ward and Phu Hoa 1 commune (Tuy Hoa city) to organize a trial operation of the new commune-level government model, from June 16-20,