Regulating reservoir water in Hue to prevent floods

PHÚC ĐẠT |

HUE - Thua Thien Hue province regulates water in two reservoirs to prevent floods and ensure safety downstream.

On October 30, the Steering Committee for Natural Disaster Prevention and Control and Search and Rescue (PCTT&TKCN) of Thua Thien Hue province said that it had issued an order to operate and regulate the Huong Dien hydropower reservoir (Huong Tra) and an order to operate and increase the flow of the Ta Trach reservoir (Huong Thuy).

According to the provincial Hydrometeorological Station, in the past 3 hours, there has been heavy rain and very heavy rain in Phong Dien, Quang Dien, A Luoi, Phu Vang districts, Huong Tra and Huong Thuy towns and Hue city.

Total rainfall from 7am to 10am on October 30th is generally 25 - 90mm, some places are higher such as Phong Dien 105.4mm, Dien Huong 106.2mm, Phong Dien town 106.4mm. Currently, there is continuing moderate rain, heavy rain, some places have very heavy rain.

In order to gradually lower the water level of the reservoir, increase the flood prevention capacity, and ensure the safety of the dam and the downstream area in the coming time, the Provincial Steering Committee for Flood and Storm Prevention and Control requests to adjust the flow rate of the Ta Trach reservoir through the spillway and turbine with a gradually increasing flow rate, avoiding sudden changes of about 350 - 700m3/s. Adjust the operation depending on the actual flow rate to the reservoir. The time to gradually increase the flow rate is at 2:00 p.m. on October 30.

Similarly, operate and regulate Huong Dien hydropower reservoir through spillway and turbine with gradually increasing flow, avoiding sudden changes of about 400 - 700m3/s. Adjust operation depending on actual flow to the reservoir. Time to gradually increase flow at 3:00 p.m. on the same day.

The Provincial Steering Committee for Disaster Prevention and Search and Rescue noted that localities downstream of Ta Trach and Huong Dien reservoirs strictly prohibit boating, firewood collection, fishing, etc. on rivers and lakes (except in special cases and with approval from competent authorities), and at the same time notify people to proactively prevent.

PHÚC ĐẠT
RELATED NEWS

Body of man swept away by flood found

|

Quang Binh - Mr. C's body was found more than 300m from the accident site.

The moment when people in the mountainous region of Quang Binh abandoned their belongings and fled the flood

|

Quang Binh - People in the mountainous district of Le Thuy are still shocked by the sudden flood, forcing them to abandon their belongings and flee for their lives.

From QR code to smart tours, Hanoi travel breaks through the customer market

|

Hanoi - The application of digital technology is becoming the "key" to help travel businesses break through and refresh customer experiences.

Proposal to increase the support level for preschool children who are children of workers to 300,000 VND/month

|

Vinh Long - The level of support for preschool children and teachers in industrial parks is proposed to be built in a specific direction, suitable to the actual lives of workers.

Hand, foot and mouth disease vaccine licensed in Vietnam

|

The Ministry of Health has just licensed the circulation of the hand, foot and mouth disease vaccine due to the EV71 virus, opening up more options to protect young children from the risk of serious complications.

Russia declares it has seized more territory in Sumy and Donetsk from Ukraine

|

Russia claims control of 2 more settlements in Sumy and Donetsk, while Moscow and Kiev continue to make contradictory assessments of the situation.

Details of the rearrangement plan for universities and vocational education in Ho Chi Minh City

|

After the arrangement, Ho Chi Minh City will reduce the number of vocational schools, increase the scale of colleges and convert continuing education centers into vocational high schools.

Lao Cai social housing project shows signs of illegal dumping

|

Many people in Yen Bai and Van Phu wards, Lao Cai province expressed their frustration when wastewater from the Yen Ninh social housing project was transported and dumped by units in many different areas, causing dust and affecting daily life.

Khắc phục lan can đá bị lũ xô đổ ở đền Bảo Hà trước 30.11

Nhóm PV |

Lào Cai - Sau khi thực tế hiện trường cùng PV, chủ đầu tư và nhà thầu đã đưa ra lý giải cùng phương án khắc phục đoạn lan can đá bị gãy đổ mà Lao Động phản ánh.

Body of man swept away by flood found

CÔNG SÁNG |

Quang Binh - Mr. C's body was found more than 300m from the accident site.

The moment when people in the mountainous region of Quang Binh abandoned their belongings and fled the flood

CÔNG SÁNG |

Quang Binh - People in the mountainous district of Le Thuy are still shocked by the sudden flood, forcing them to abandon their belongings and flee for their lives.