Order to open 2 floodgates of Thac Ba hydroelectric reservoir this afternoon, 4 provinces and cities must ensure safety

Huy Hùng |

The Ministry of Agriculture and Environment has just issued a telegram on opening the Thac Ba hydroelectric reservoir surface spillway.

The dispatch clearly stated: At 7:00 a.m. on July 28, 2025, the upstream water level of Thac Ba Lake was at 56.21 m, the downstream water level was 24.12 m, the flow to the lake was 490 m3/s, the total downstream flow was 413 m3/s.

Implement the Inter-reservoir operation process in the Red River basin in Decision No. 740/QD-TTg dated June 17, 2019 of the Prime Minister, Decision No. 922/QD-TTg dated May 14, 2025 of the Prime Minister amending and supplementing a number of articles of the Inter-reservoir operation process in the Red River basin; Resolution No. 102/NQ-CP dated June 29, 2024 of the Government on ensuring the direction and operation of natural disaster prevention and control during the period of perfecting the direction and command of civil defense agencies at all levels, Document No. 3995/VPCP-NN dated May 8, 2025 of the Government Office on organizing monitoring, supervision and implementation of natural disaster prevention and control work, Minister of Agriculture and Environment of the Director of Hydropower Joint Stock Company: Ms.

Open 2 floodgates (No. 01 and No. 03) at 4:00 p.m. on July 28, 2025 to urgently bring the upstream water level of the lake to the elevation of 56.0m; then adjust the opening level to maintain the upstream water level not exceeding the elevation of 56.0m.

Closely monitor the development of floods, safety of works, flow to the reservoir, water levels upstream and downstream of the reservoir and promptly report to the Ministry of Agriculture and Environment.

On the same day, the Ministry of Agriculture and Environment also sent an official dispatch to the People's Committees of the provinces and cities: Lao Cai, Tuyen Quang, Phu Tho, Hanoi on ensuring safety downstream when operating Thac Ba hydropower reservoir.

To ensure the safety of works and activities along the river, the Ministry of Agriculture and Environment recommends that People's Committees of provinces and cities immediately notify authorities at all levels, people, organizations operating on rivers and along rivers; aquaculture facilities, water transport vehicles; ferry terminals, vertical boats; review and ensure the safety of works under construction; sand and gravel mining activities, and transit to know about flood discharge in Thac Ba hydroelectric reservoir to proactively take preventive measures to ensure safety of people and property.

Timely report and propose solutions to handle unusual situations that may occur during the flood discharge process to the Ministry of Agriculture and Environment.

Huy Hùng
TIN LIÊN QUAN

Order to close 2 consecutive bottom spillways of Hoa Binh hydroelectric reservoir, 6 provinces and cities must ensure safety

|

The Ministry of Agriculture and Environment has just issued a telegram on closing the bottom spillway of Hoa Binh Lake.

Order to open another bottom spillway gate of Hoa Binh hydroelectric reservoir this afternoon

|

Another bottom spillway of Hoa Binh hydroelectric reservoir was ordered to open this afternoon.

Localities will screen and classify civil servants, opening new recruitment opportunities

|

According to the Minister of Home Affairs, there will be documents directing localities to screen civil servants, thereby opening up recruitment opportunities and adding new tasks to meet the requirements of the task.

Quickly arrange and rearrange the team of civil servants, perfecting commune-level leaders

|

The Prime Minister requested to quickly arrange and reassign the appropriate team of cadres and civil servants, especially to perfect the leadership at the commune level.

Destroyed after floods, people in the mountainous areas of Son La struggle to rise up

|

Son La - The horrific flood on the evening of July 26 with the sweep of soil and rocks that collapsed caused great damage to people and property.

Liquidity explodes, stocks hit a historic peak after 25 years

|

The VN-Index set the highest score in the trading history of the stock market with a record liquidity of nearly 2 billion USD.

Electric vehicle charging stations flourish in Ho Chi Minh City

|

HCMC - The shortage of legitimate charging infrastructure has caused many households, cafes, and parking lots in HCMC to set up charging stations for electric vehicles.

Mass shooting in the Thai capital, many casualties

|

A mass shooting incident occurred in the capital Bangkok, Thailand, causing many casualties.

Triệu tập đối tượng tung tin đồn vỡ đập thủy điện Bản Vẽ

QUANG ĐẠI |

Nghệ An - Tin giả vỡ đập thủy điện Bản Vẽ khiến hàng trăm người dân hoảng loạn kéo nhau bỏ chạy lên núi.

Order to close 2 consecutive bottom spillways of Hoa Binh hydroelectric reservoir, 6 provinces and cities must ensure safety

Huy Hùng |

The Ministry of Agriculture and Environment has just issued a telegram on closing the bottom spillway of Hoa Binh Lake.

Order to open another bottom spillway gate of Hoa Binh hydroelectric reservoir this afternoon

Huy Hùng |

Another bottom spillway of Hoa Binh hydroelectric reservoir was ordered to open this afternoon.