In response to voters' opinions and recommendations on the renovation and repair of degraded roads, ensuring traffic safety and urban aesthetics, the People's Committee of Thien Huong Ward has directed the Department of Economic Infrastructure and Urban Areas to urgently implement the construction of project items.
In particular, renovating and repairing the Thien Huong - Hoa Dong - Lam Dong route (203 road), the section from the National Highway 10 intersection to the market entrance next to Aurora Vietnam Shoes Industrial Company Limited with the following items: treating rubber, potholes, patching asphalt concrete on the road surface; weeding, clearing the roadsides on both sides of the route to ensure the road surface is flat, airy, convenient for people to travel.
The ward also renovated and repaired the road from Provincial Road 351 to Thien Huong Market (belonging to Thien Huong 4 residential group), including the following tasks: building manholes, handling clogged drainage ditches, replacing collapsed ditches, pouring concrete on the road surface and painting the edge to slow down.

The projects are constructed on schedule, ensuring technical, quality and labor safety. During the implementation process, people in related areas have actively coordinated, creating favorable conditions for the construction unit, demonstrating the spirit of consensus, joining hands to build transport infrastructure and an increasingly spacious and civilized urban appearance.
Timely implementation of traffic repair and renovation items not only meets the legitimate aspirations of the people, but also contributes to improving the quality of technical infrastructure, promoting socio-economic development, towards the goal of building Thien Huong ward to be increasingly green, clean, beautiful, civilized and modern.