Reviewing shortcomings in traffic signs in Thanh Hoa

QUÁCH DU |

The functional sector and localities in Thanh Hoa are urgently conducting a general review and overcoming shortcomings in the traffic sign system.

On March 8, a representative of the Thanh Hoa Department of Construction said that after Deputy Prime Minister Tran Hong Ha requested the Ministry of Transport (after the merger, the Ministry of Construction) to preside over and coordinate with the Ministry of Public Security and the People's Committees of provinces and cities to conduct a general review and resolve shortcomings in the system of traffic signs and lights, the Thanh Hoa Department of Construction is coordinating with localities in the province to organize a review, inspection and overcoming.

Ra soat, khac phuc nhung bat cap ve cac bien bao giao thong tren dia ban tinh Thanh Hoa. Anh: Minh Hoang
Review and overcome shortcomings in traffic signs in Thanh Hoa province. Photo: Minh Hoang

Also according to the representative of the Thanh Hoa Department of Construction, during the review process, inappropriate traffic signs will be adjusted, and locations that lack signs will be supplemented. After completing the review, the Department will report specifically to the People's Committee of Thanh Hoa province and implement measures to overcome the shortcomings.

Regarding implementation costs, the Thanh Hoa Department of Construction will use regular maintenance costs. For national highways not under the management authority of the province, the Department will report to the Vietnam Road Administration for appropriate handling.

"Through a preliminary review, on some inner-city roads of the city, towns and district centers, there was a situation where traffic signs were obstructed from view due to trees or some obstacles. Faced with this situation, the Department has directed the authorities to clear and repair the missing signs, creating favorable conditions for traffic participants," informed a representative of the Thanh Hoa Department of Construction.

Currently, the Thanh Hoa Department of Construction has also issued a document requesting the People's Committees of districts, towns and cities in the area to proactively review and overcome shortcomings in traffic signs. After that, the units will synthesize the results and report to the People's Committee of Thanh Hoa province to have a thorough handling plan.

QUÁCH DU
RELATED NEWS

Need to repair roads and adjust signs on National Highway 19

|

Gia Lai - Many locally damaged locations on National Highway 19 need to be repaired promptly as well as traffic signs need to be adjusted.

Check and review the adjustment of signs in Ho Chi Minh City

|

Ho Chi Minh City will strengthen inspection, review, adjustment and addition of the road sign system to ensure traffic order and safety.

Repairing signs on Noi Bai - Lao Cai Expressway after reflection

|

The signs with incorrect instructions about information on the Noi Bai - Lao Cai Expressway passing through Phu Tho province have been adjusted after being reported by Lao Dong Newspaper.

Bao Phuong Vinh wins Asian carom runner-up at home

|

Bao Phuong Vinh lost to Kim Haeng Jik with a score of 42-50 in the final of the 2026 Asian Carom Championship, held on the afternoon of May 8 in Ho Chi Minh City.

Gasoline and oil prices simultaneously decrease sharply, imports of gasoline and oil decrease sharply

|

Domestic gasoline and oil prices continuously decreased after many adjustment periods, imports of crude oil and gasoline of all kinds also decreased sharply in the second half of April 2026.

Motorbike catches fire on Binh Loi bridge during rush hour

|

Ho Chi Minh City - A motorbike suddenly caught fire fiercely while going down Binh Loi bridge, causing traffic congestion in this area.

Arbitrarily leveling, subdividing, and selling agricultural land plots in the highlands of Lang Son

|

Lang Son - Thousands of square meters of forest land and agricultural land are plowed and illegally divided into plots for sale.

Chairman of Ho Chi Minh City People's Committee Nguyen Van Duoc receives additional important task

|

Ho Chi Minh City - Chairman of Ho Chi Minh City People's Committee Nguyen Van Duoc has just been assigned to be the Head of the Investment Task Force for the city's education sector.

Need to repair roads and adjust signs on National Highway 19

THANH TUẤN |

Gia Lai - Many locally damaged locations on National Highway 19 need to be repaired promptly as well as traffic signs need to be adjusted.

Check and review the adjustment of signs in Ho Chi Minh City

Huyền Trân |

Ho Chi Minh City will strengthen inspection, review, adjustment and addition of the road sign system to ensure traffic order and safety.

Repairing signs on Noi Bai - Lao Cai Expressway after reflection

Tô Công |

The signs with incorrect instructions about information on the Noi Bai - Lao Cai Expressway passing through Phu Tho province have been adjusted after being reported by Lao Dong Newspaper.