After heavy rain, many roads in Can Tho are flooded

Tạ Quang |

Can Tho - The prolonged heavy rain has caused many roads in the center of Can Tho to be seriously flooded.

Early in the afternoon of May 5, in Can Tho city, there was heavy rain lasting about 2 hours, causing many roads to be seriously flooded.

This situation not only makes it difficult for people to travel but also greatly affects daily business and daily activities.

Duong Cach mang Thang 8 menh mong nuoc sau con mua. Anh: Ta Quang
Cach Mang Thang 8 Street in Can Tho is flooded after the rain. Photo: Ta Quang

According to the reporter's records, on Cach Mang Thang 8 route (National Highway 91 in Cai Khe ward, Ninh Kieu district), heavy rain caused water to not yet drain and rise onto the road surface. A team of water supply and drainage workers is on duty to respond.

Observation shows that the water level was about 30cm deep. Even in some low-lying areas, the water level rises, making it difficult for many vehicles, especially motorbikes, to move.

"Every time it rains heavily, the road is flooded. Every year, we are so used to this scene. Going to work and sending my children to school becomes extremely difficult," said Ms. Minh Trang (a resident of Cai Khe ward, Ninh Kieu district).

Duong Nguyen Van Cu cung trong tinh trang ngap nang. Anh: Ta Quang
Nguyen Van Cu Street is also heavily flooded. Photo: Ta Quang

Next to Cach Mang Thang 8 Street, Nguyen Van Cu Street is also heavily flooded. Motorbikes must move close to the median strip to avoid stalking.

Duong Tran Viet Chau cung ngap nang. Anh: Ta Quang
Tran Viet Chau Street was also heavily flooded. Photo: Ta Quang

Not only traffic, but the daily life of traders is also seriously affected. Many houses were flooded, causing property damage. Business and trading activities have also been stalled due to flooded roads, making it impossible for customers to access.

Duong 30/4 va Tran Van Hoai co nhieu vi tri nuoc khong kip thoat. Anh: Ta Quang
30/4 and Tran Van Hoai streets have many locations where the water cannot drain in time. Photo: Ta Quang

On Tran Van Hoai Street, the road surface has just been upgraded, so the water overflows onto the sidewalk and cannot drain in time. In addition, 30/4 Street also appeared in many flooded locations.

Da co nhung xe bi chet may. Anh: Ta Quang
Some vehicles stalled. Photo: Ta Quang

According to the Can Tho City Hydrometeorological Station, the measured rainfall was 60.3mm, with rainfall from 12:50 - 15:20 minutes.

It is known that the project to upgrade and expand National Highway 91 (section from Km0 - Km7) with a total investment of nearly VND 7,238 billion is being urgently implemented by Can Tho City. This is a key project, of great significance in the city's socio-economic development.

The project has a total planned land area of about 27.25 hectares; affecting about 1,066 households, individuals and organizations; with a need for resettlement of about 300 plots.

The National Highway 91 Upgrade and Expansion Project (section from Km0 - Km7), Can Tho City is a Group A project, a level 1 road traffic project, with implementation period from 2023 - 2027. The overall goal of the project is to complete the transport infrastructure, striving to build Can Tho into a modern and civilized city, basically becoming an industrial city.

Tạ Quang
TIN LIÊN QUAN

Two ambulances collide in Can Tho

|

Can Tho - Two ambulances on duty collided at the Nguyen Van Linh intersection - 3/2 Street.

Hung Loi Bridge's residential road in Can Tho completed after 15 years of waiting

|

Can Tho - Asphalting the residential road on both sides of Hung Loi bridge not only helps people move easily, but also contributes to improving the urban beauty.

Projects in Can Tho are proposed to prioritize capital allocation

|

Can Tho - The Western Ring Road Project, Provincial Road 917, 918, and National Highway 91 are being implemented very slowly, so it is being proposed to pay attention to prioritizing capital allocation.

The schedule for worshiping the Buddha at 4 pagodas in Vietnam

|

The visit of the Buddha to Vietnam on the occasion of the 2025 United Nations Vesak will be honored at 4 famous pagodas from the South to the North.

20h News: Traders reveal surprises about super long-distance cigarette cars

|

20h News on January 7: Gasoline prices are forecast to decrease simultaneously; Two decades of selling pork, traders reveal surprises about super long-distance cigarette cars...

VNPT's abandoned project increases capital by more than 1,417 billion VND compared to 2024

|

An abandoned VNPT project with a total investment of VND2,796 billion announced in 2024 has been adjusted to VND4,213 billion in 2025.

The incident of encroachment on the king's mausoleum, the subjects studied the terrain

|

Thanh Hoa - The subjects rented a hotel and studied the terrain before encroaching on the king's tomb to find antiques.

Can't attract excellent students and young scientists with a salary of 2.34

|

The National Assembly delegate said that it will not be possible to attract an excellent graduate student or a young scientist from abroad with a starting salary of 2.34.

Two ambulances collide in Can Tho

Tạ Quang |

Can Tho - Two ambulances on duty collided at the Nguyen Van Linh intersection - 3/2 Street.

Hung Loi Bridge's residential road in Can Tho completed after 15 years of waiting

Tạ Quang |

Can Tho - Asphalting the residential road on both sides of Hung Loi bridge not only helps people move easily, but also contributes to improving the urban beauty.

Projects in Can Tho are proposed to prioritize capital allocation

Tạ Quang |

Can Tho - The Western Ring Road Project, Provincial Road 917, 918, and National Highway 91 are being implemented very slowly, so it is being proposed to pay attention to prioritizing capital allocation.