Hoa Binh Hydropower Plant continues to close another floodgate

Minh Nguyễn |

Hoa Binh Hydropower Plant continues to close another floodgate under the order of the Minister of Agriculture and Rural Development.

Accordingly, at 05:00 on September 23, the upstream water level of Hoa Binh Lake was at 116.79m, the inflow to the lake was 4.14m3/s, and the discharge was 5,658m3/s.

To implement the regulations on the operation process of inter-reservoirs in the Red River basin and to ensure the direction and operation of natural disaster prevention and control, the Minister of Agriculture and Rural Development ordered the Director of Hoa Binh Hydropower Company to close another bottom spillway gate of Hoa Binh Hydropower Reservoir at 7:00 a.m. on September 23.

At the same time, closely monitor the developments of floods, construction safety, flow to the lake, upstream and downstream water levels of the reservoir, and promptly report to the Ministry of Agriculture and Rural Development (through the Department of Dike Management and Disaster Prevention and Control) and relevant agencies as prescribed.

Thus, up to now, Hoa Binh Hydropower Plant is maintaining 1 bottom spillway.

Previously, on September 22, Hoa Binh Hydropower Plant opened three floodgates at 12:00, 13:00 and 15:00. At 1:00 a.m. on September 23, the unit closed one floodgate under the order of the Minister of Agriculture and Rural Development.

Minh Nguyễn
RELATED NEWS

Polling stations in Van Mieu - Quoc Tu Giam ward are ready for the country festival

|

Hanoi - Voting stations in Van Mieu - Quoc Tu Giam ward have completed preparations, decorated with colorful flags and flowers, ready for election day.

Images of the most overloaded road in Ho Chi Minh City waiting for expansion

|

Nguyen Tat Thanh Street is one of the most congested roads in Ho Chi Minh City, about to expand to at least 8 lanes, associated with the renovation of Nha Rong - Khanh Hoi area.

Mobilizing financial resources effectively for high and sustainable growth

|

Credit is the "blood vessel" of the financial market. The pressure to unlock capital is increasing sharply, requiring safe, directional, and effective cash flow.

Stocks have not shown a sustainable recovery trend

|

The stock market is entering a sensitive phase, short rallies may only be of the nature of a "trap for price increases".

Polling stations in Tu Liem ward are ready for the great festival of the whole people

|

Hanoi - In the atmosphere of preparing for election day, polling stations in Tu Liem ward are ready to welcome voters.

Hoa Binh Hydropower Plant closed one floodgate at night

Minh Nguyễn |

Hoa Binh Hydropower Plant just closed a floodgate at 1:00 a.m. on September 23 under the order of the Minister of Agriculture and Rural Development.

Water level rises to over 60m, largest hydroelectric reservoir in the South releases floodwaters

HÀ ANH CHIẾN |

Dong Nai - Tri An Hydropower Reservoir will discharge flood water through the spillway from 10am on September 23.

Hoa Binh Hydropower Plant opens 3 flood gates in a row

Minh Nguyễn |

Hoa Binh Hydropower Plant opened three flood gates consecutively at 12:00, 13:00 and 15:00 on September 22.