Allocating 304,000m2 of land to the Sun Group consortium to build Nha Trang mixed-use urban area

Hữu Long |

Khanh Hoa allocates more than 304,000m2 of land to the joint venture of Sun Group and Asean Ha Long to implement the Nha Trang mixed-use urban area

In August 2025, the People's Committee of Khanh Hoa province issued a decision to allocate land and lease land in phase 1 to the Joint Venture of Ha Long Sun Company Limited and Asean Ha Long Tourism Joint Stock Company to implement the Nha Trang City Mixed-use Urban Area project with a total area of 304,703m2.

Accordingly, urban land: 66,825.97m2, land allocation with land use fees, long-term.

Commercial - service land: 23,940m2, leased land with one-time payment for the entire lease term (50 years).

Land for theme parks, parking lots, public trees: More than 78,784m2, land lease with annual fees.

Land for construction of education - sports - water surface: nearly 44,600m2, leased land with annual rental payments.

Non-business land for traffic and public infrastructure: 90.553.4m2, land allocated without payment, after construction is completed, it will be handed over to the State for management.

The regional road system ensuring traffic connection between the project and neighboring areas will be managed by the State.

Internal roads are the responsibility of investors to manage and operate to ensure synchronization and safety in urban areas.

The form of land allocation and land lease is implemented through bidding to select investors for projects using land.

The Ha Long Sun - Asean Ha Long consortium is responsible for coordinating with the People's Committee of Nam Nha Trang ward to ensure other legal land use rights within the project scope.

It is known that the Nha Trang City Mixed-use Urban Area project has a scale of more than 226 hectares, with a total investment of more than 17,000 billion VND.

In the future, a new public park and administrative center of Khanh Hoa province will be planned here.

The project is designed with 3 large islands - 3 sub-areas of Area 1 "Smart Ecological Urban Peninsula" of 68.55 hectares, adjacent to the new administrative center of Khanh Hoa province.

Area 2 of the 51ha " enough to entertain the international park" includes 2 main parks: international theme park and public park, with the mission of reshaping the tourism and night-time economy map of Khanh Hoa.

Area 3 named "Paradise Island" with an area of over 44 hectares, positioning a luxurious living space, separate for the upper class.

Hữu Long
RELATED NEWS

Early handover of construction site for 2 expressway rest stops in Khanh Hoa

|

Khanh Hoa - The locality is completing compensation and land acquisition procedures to construct 2 rest stop projects on the expressway.

The highest determination to soon put 4 projects with a total capital of 22,000 billion VND in Khanh Hoa into operation

|

Khanh Hoa - The locality requires investors to promote their capacity, reputation and the highest determination to soon put projects into operation.

Assigning the investor to build a social housing project worth VND2,200 billion without bidding in Nha Trang

|

The locality decided to assign investors to implement social housing projects in Nha Trang without bidding, because this project has been approved for investment.

Billionaire Pham Nhat Vuong in the top 200 richest people in the world

|

On the afternoon of August 26, Forbes recorded Mr. Pham Nhat Vuong's assets at 13.6 billion USD - the highest ever, an increase of nearly 1 billion USD compared to the previous day.

It rained heavily, the water of the Tich River rose, overflowing the dykes, isolating nearly a hundred households in Hanoi

|

Due to rising water levels of the Tich River, the Ta Tich dike area overflowed the dike surface, leading to the entire Doi O hamlet, Phuc Tho commune, Hanoi being isolated.

Car owner spectacularly escaped death in landslide at Sa Pa toll station

|

Lao Cai - Rocks and soil at Sa Pa BOT station continue to overflow onto National Highway 4D, causing traffic congestion.

Parents overcome storms to go to Hanoi to send their children to university

|

Despite storms, floods, and traffic jams, thousands of parents and new students have come to the Vietnam Women's Academy to enroll.

The job market in the AI whirlwind

|

At this time, not only unskilled workers have unstable job opportunities, but even skilled people who have been trained are at risk of losing their jobs due to AI.

Early handover of construction site for 2 expressway rest stops in Khanh Hoa

Hữu Long |

Khanh Hoa - The locality is completing compensation and land acquisition procedures to construct 2 rest stop projects on the expressway.

The highest determination to soon put 4 projects with a total capital of 22,000 billion VND in Khanh Hoa into operation

Hữu Long |

Khanh Hoa - The locality requires investors to promote their capacity, reputation and the highest determination to soon put projects into operation.

Assigning the investor to build a social housing project worth VND2,200 billion without bidding in Nha Trang

Hữu Long |

The locality decided to assign investors to implement social housing projects in Nha Trang without bidding, because this project has been approved for investment.