Series of abandoned villas and townhouses in a super ward in Dong Nai

MINH CHÂU |

Dong Nai - A series of villas located right in the center of Buu Long ward, Bien Hoa city (now Tran Bien ward) are abandoned, overgrown with weeds.

High-class residential area deserted

According to records of Lao Dong Newspaper reporters at the beginning of September 2026, right in the center of Buu Long ward, former Bien Hoa city (now Tran Bien ward, Dong Nai city), there are a series of abandoned townhouses and villas, overgrown with weeds, and sparsely populated.

Một căn biệt thự mới xây phần thô, cỏ mọc um tùm. Ảnh: HAC
A newly built villa with rough construction, overgrown with grass. Photo: HAC

Although many villas and townhouses are built high-class, spacious and beautiful, residents in many areas only have a few households coming to live. Among them, there is a building that has completed the rough construction but is surrounded by corrugated iron outside, and no construction activities are seen here.

Right from Huynh Van Nghe street leading to the main road to the front of the residential area project with commercial services, high-class housing and resettlement in Buu Long ward, many villas and townhouses are abandoned, gate locks are rusty, grass grows tall and no one cleans them, many villas are being advertised for sale.

Limitations on bidding to select investors and investors

At the end of July 2026, the Inspectorate of Dong Nai City concluded on the Residential Area Project with commercial services, high-class housing and resettlement in Buu Long ward, Bien Hoa City (now Tran Bien ward, Dong Nai City) invested by Dong Nai Housing Business Joint Stock Company.

Accordingly, the project has been temporarily suspended and cannot be continued due to limitations in bidding to select project investors and bidding to select project investors.

Cỏ mọc cao chắn lối đi vào căn biệt thự nằm tại phường Bửu Long, TP Biên Hòa (nay là phường Trấn Biên, TP Đồng Nai). Ảnh: HAC
Grass grows tall blocking the entrance to the villa located in Buu Long ward, Bien Hoa city (now Tran Bien ward, Dong Nai city). Photo: HAC

The project has a population scale of about 7,300 - 7,500 people, according to the investment project proposal, the products are villa houses (150 plots), terraced houses with gardens (174 plots), terraced houses (shophouses, 51 plots), terraced resettlement land (512 plots), social housing (505 plots), kindergarten (7,314.5 m2), primary school (12,100.9m2), urban services).

The total land area for the project is about 49.63 ha; investment capital is more than 834 billion VND. The origin of the land is used by households, individuals, and organizations.

To date, the project is still in progress. The investor has built 469 completed rough houses on the outside including: 360 townhouses, 31 garden townhouses, 56 villas, 22 shophouses.

According to the conclusion of the Inspectorate of Dong Nai City, although the project was allocated land and is in the implementation phase, it has not been completed, so there is not enough basis to assess the effectiveness according to the project's objectives; slow project implementation and prolongation may lead to reduced land use efficiency and waste of land resources.

Also according to the inspection conclusion, the main violation in project implementation is that the advisory agency, based on inappropriate regulations, did not advise on the implementation of bidding to select investors and bidding to select investors.

Close-up of a series of abandoned villas and townhouses in Buu Long ward, Bien Hoa city (now Tran Bien ward, Dong Nai city):

Toàn cảnh khu biệt thự, nhà phố tại phường Bửu Long, TP Biên Hòa (nay là phường Trấn Biên, TP Đồng Nai). Ảnh: HAC
Overview of villa and townhouse area in Buu Long ward, Bien Hoa city (now Tran Bien ward, Dong Nai city). Photo: HAC
Theo ghi nhận, một khu nhà đã xây dựng phân thô và chưa tiếp tục xây dựng. Ảnh: HAC
According to records, a building has been roughly built and construction has not resumed. Photo: HAC
Bên ngoài một khu nhà đã quây tôn, bên trong cỏ mọc um tùm. Ảnh: HAC
Outside a house area that has been surrounded by corrugated iron, inside is overgrown with grass. Photo: HAC
Một dãy nhà xây thô nằm lộ thiên, không che chắn. Ảnh: HAC
A row of roughly built houses located outdoors, without cover. Photo: HAC
Biển Dự án Khu dân cư với các dịch vụ thương mại, nhà ở cao cấp và tái định cư tại phường Bửu Long. Ảnh: HAC
Project sign Residential area with commercial services, high-class housing and resettlement in Buu Long ward. Photo: HAC
Một loạt căn nhà được đầu tư xây dựng bài bản, đến nay vẫn bỏ không. Ảnh: HAC
A series of houses are invested in and built methodically, but are still abandoned to this day. Photo: HAC
Một căn biệt thự cửa đóng, then cài. Ảnh: HAC
A villa with closed doors and locks. Photo: HAC
Cỏ mọc um tùm, cửa cổng có dấu hiệu xuống cấp. Ảnh: HAC
Grass grows lushly, gates show signs of degradation. Photo: HAC
Bên cạnh đó là những căn nhà xây thô chưa hoàn thiện. Ảnh: HAC
Besides, there are unfinished rough houses. Photo: HAC
Lối vào dự án bị chặn bởi những ống nước. Ảnh: HAC
The project entrance is blocked by water pipes. Photo: HAC
Một căn biệt thự được xây dựng rất cao cấp. Ảnh: HAC
A spaciously built villa... Photo: HAC
...đang treo biển bán nhà. Ảnh: HAC
...hanging signs selling houses. Photo: HAC
Một căn biệt thự khác cũng treo biển bán với giá 20 tỉ đồng. Ảnh: HAC
Another villa also hangs a sign for sale at 20 billion VND. Photo: HAC
Theo Thanh tra TP Đồng Nai, việc chậm triển khai dự án, kéo dài có thể dẫn đến làm giải hiệu quả sử dụng đất, gây lãng phí tài nguyên đất đai. Ảnh: HAC
According to the Inspectorate of Dong Nai City, the slow and prolonged project implementation may lead to reduced land use efficiency, causing waste of land resources. Photo: HAC
Dự án Khu dân cư với các dịch vụ thương mại, nhà ở cao cấp và tái định cư tại phường Bửu Long, TP Biên Hòa (nay là phường Trấn Biên, TP Đồng Nai) do Công ty Cổ phần Kinh doanh nhà Đồng Nai làm chủ đầu tư. Ảnh: HAC
Residential Area project with commercial services, high-class housing and resettlement in Buu Long ward, Bien Hoa city (now Tran Bien ward, Dong Nai city) invested by Dong Nai Housing Business Joint Stock Company. Photo: HAC

Tran Bien ward is likened to a "super ward" of Dong Nai city with a scale of about 200,000 people.

MINH CHÂU
RELATED NEWS

Auction of 17 land plots in villa and adjacent areas in Phu Tho

|

Phu Tho - The locality is about to organize an auction of 17 land plots in Thanh Thuy commune, starting price from over 400 million VND.

Suspicion of a villa area severely damaged after a storm in Ha Tinh has not yet built a sea embankment according to the design

|

Ha Tinh - In the construction permit issued by the Ha Tinh Department of Construction, at Hoa Tien Xuan Thanh Resort, there is a 850m long sea embankment.

After the rain, the million-dollar villa in Hanoi is still submerged in water

|

Hanoi - Many villas and townhouses on both sides of Hoang Tung Street (An Khanh Commune) were still deeply submerged in water even though it had stopped raining on October 8.

Vice Chairman of Ho Chi Minh City visits the charity class of the 80-year-old "lottery ticket teacher" after Lao Dong's article

|

Ho Chi Minh City - Mr. Nguyen Manh Cuong - Vice Chairman of Ho Chi Minh City People's Committee visited the charity class of Ms. Nguyen Thi Ba in Thu Dau Mot ward.

Central Inspection Committee proposes to consider disciplinary action against Deputy Minister of Health Tran Van Thuan

|

The Central Inspection Committee proposed that competent authorities consider and discipline Deputy Minister of Health Tran Van Thuan.

Strengthening bilateral cooperation relations between the VGCL and FKTU

|

Seoul - In the afternoon of September 7, Mr. Nguyen Anh Tuan, Member of the Party Central Committee, Vice Chairman of the Central Committee of the Vietnam Fatherland Front, President of the Vietnam General Confederation of Labor visited and worked with the Korean Trade Union Federation (FKTU).

The first cold air wave of this year arrives early, the North is about to have thunderstorms

|

The meteorological agency predicts that the North is about to welcome the first cold air of the season, and the Central region is about to face moderate to heavy rain.

Phá nhanh vụ đập kính ôtô trộm tài sản tại khu biệt thự ở Lạng Sơn

Khánh Linh |

Lạng Sơn - Công an đã làm rõ và tóm gọn 2 đối tượng có hành vi đập vỡ kính hàng loạt xe ôtô để trộm cắp tài sản tại khu biệt thự Catalan.

Auction of 17 land plots in villa and adjacent areas in Phu Tho

Tân Văn |

Phu Tho - The locality is about to organize an auction of 17 land plots in Thanh Thuy commune, starting price from over 400 million VND.

Suspicion of a villa area severely damaged after a storm in Ha Tinh has not yet built a sea embankment according to the design

TRẦN TUẤN |

Ha Tinh - In the construction permit issued by the Ha Tinh Department of Construction, at Hoa Tien Xuan Thanh Resort, there is a 850m long sea embankment.

After the rain, the million-dollar villa in Hanoi is still submerged in water

Vương Trần |

Hanoi - Many villas and townhouses on both sides of Hoang Tung Street (An Khanh Commune) were still deeply submerged in water even though it had stopped raining on October 8.