The inter -regional road project connecting Ho Chi Minh road with Highway 70B, Highway 32C of Phu Tho province to Yen Bai province - with the total after -adjustment of 2,120 billion VND has officially handed over and handed over and brought and brought Use the main route longer than 53 km passing through Tam Nong, Cam Khe and Ha Hoa districts of Phu Tho province, connecting to Tran Yen district, Yen Bai province.
The main route of inter -regional road through the territory of Cam Khe district has a total length of nearly 30 km, many households of this district are in the area of land acquisition, including households losing houses arranged by the State. .

As noted by the Lao Dong Newspaper reporter in the morning of 8.2, the resettlement areas of the project were built in many communes along the main route of inter -regional roads. The common characteristics of these resettlement areas are all arranged in the new road, although the total area of each area is not large (the resettlement areas are less than 10 households), but are built quite technical infrastructure quite synchronously. With concrete roads, sidewalks, electricity, drainage ...
Mr. Nguyen Si Giap - people living in the resettlement area in Zone 7, Yen Tap commune (former Ta Xa commune before the merger) - shared: "My family after being arranged resettlement land has lived It is more than 1 year. Difficulties but through time is also gradually stabilizing. "

With Ms. Do Thi Tam - people living in the resettlement area of Nhat Tien commune (former Chuong Xa commune before the merger), the movement to live a new place to bring more hope about a better life: " I am the first household in Chuong Xa (the name of the old commune) to the resettlement area to build a house. New accommodation, new roads and new spring will open up new opportunities for my family, my hometown to develop the economy. "
According to the representative of the Management Board of the Construction, Civil and Industrial Project Construction Project, Phu Tho province, with inter -regional route through Cam Khe district, 5 resettlement areas have been built, Completed from the middle of 2024. Specifically in 5 communes: Yen Duong, Nhat Tien, Phu Khe, Huong Lung and Tien Luong.

According to the records, the technical infrastructure construction project of resettlement areas for site clearance is implemented in the inter -regional road project with a total investment of more than 10.8 billion dong.
Currently, the inter -regional road project connects Ho Chi Minh road with Highway 70B, Highway 32C Phu Tho Province to Yen Bai Province - is continuing to deploy bidding packages to build technical infrastructure of resettlement area for resettlement. Serving site clearance in Lam Son commune, Tam Nong district (at the beginning of the route) and the Leading commune, Cam Khe district (belonging to the branch road connecting to Cam Khe industrial park).