Plan to put the school back into operation with more than 23 billion VND after 1 year of abandonment

QUANG ĐẠI |

Nghe An - After more than a year of abandonment, Vinh Phu ward is discussing a plan to put the school into use with more than 23 billion VND.

On November 3, information from the People's Committee of Vinh Phu Ward (Nghe An) said that the unit had held a meeting to discuss the plan to put Nghi An Secondary School, campus 2 (a project worth over VND23 billion, completed for more than a year but not yet in use) into operation, to serve the 2025 - 2026 school year.

The meeting was chaired by Mr. Vo Khac Hung - Vice Chairman of Vinh Phu Ward People's Committee, aiming to find solutions to effectively use the second facility. The meeting was attended by representatives of the Department of Culture - Society, the Department of Economics, Infrastructure and Urban Areas and the Board of Directors of Nghi An Secondary School.

Tuyen duong dan vao truong moi nho hep, nuoc dong thuong xuyen. Anh: Ngoc Anh
The road leading to the new school is narrow, with frequent water stagnation. Photo: Ngoc Anh

After a field survey, listening to the reports of the Board of Directors and the opinions of departments, Mr. Vo Khac Hung agreed on the plan to organize parallel teaching at both facilities in the immediate future. Accordingly, Facility 1 will continue to teach the main subjects, while Facility 2 will be used to organize teaching of gift-aking subjects such as music, fine arts, physical education, enhanced English and culinary learning.

The People's Committee of the ward assigned Nghi An Secondary School to review facilities and make the most of existing equipment; the Department of Culture - Society coordinated with the Department of Economics, Infrastructure and Urban Areas to appraise teaching plans; at the same time, advise on allocating funds to renovate the access road to the school and add necessary equipment. These tasks must be completed before November 20, 2025.

Co so 2  truong THCS Nghi An se duoc su dung de to chuc day cac mon nang khieu nhu am nhac, my thuat, giao duc the chat, tieng Anh tang cuong va hoc phu dao. Anh: Ngoc Anh
The facilities of Nghi An Secondary School will be used to organize teaching of talents such as music, fine arts, physical education, enhanced English and culinary learning. Photo: Ngoc Anh

The representative of Vinh Phu Ward People's Committee affirmed that they will continue to strongly direct and mobilize the participation of specialized departments, in order to soon put the facilities of Nghi An Secondary School into use, avoid waste after investment and meet the teaching needs in the area.

Previously, as reported by Lao Dong Newspaper, Nghi An Secondary School, Facility 2, was invested with more than 23 billion VND, started in 2023 and completed in October 2024. Although more than a year has passed, the new school with a 3-storey building and 18 classrooms is still locked, located in the middle of a field, with a narrow access road and frequent water stagnation. The new facility does not have a headquarters, departmental classrooms, playgrounds, practice areas and still lacks many teaching equipment.

QUANG ĐẠI
RELATED NEWS

Strange story of a junior high school with over 23 billion VND built and left unused for over a year

|

Nghe An - A secondary school in Vinh Phu ward was invested with more than 23 billion VND, completed more than a year ago but is being left unused due to many shortcomings.

A series of resettlement houses left unused for many years, tired of waiting for people to move in

|

A series of resettlement housing projects in Hanoi have been completed for many years but there are still no people living there, leading to deterioration and waste of investment resources.

Billion-dollar bridge in Thai Nguyen is completed and then abandoned, becoming a dumping ground

|

Thai Nguyen - Kieu Chinh Bridge (Phu Binh Commune) has been completed for many years but has been abandoned, becoming a place to collect waste and construction materials.

Gold prices increase and decrease alternately, buyers enter 2 taels, sellers take profits

|

In Hanoi, the queue is no longer bustling, however, the quantity of gold sold is still limited.

Heavy rain causes bridge abutments collapse in Hue, traffic disruption

|

HUE - Prolonged heavy rain caused the Phu Mau bridge abutment on Provincial Road 14B to collapse, cutting off traffic in the area.

Social network managers will have to authenticate the identity of livestream sellers

|

In reality, there have been livestream sales sessions worth billions of dong but the state has not collected taxes or international beauty queens sell vegetable candy, inflate products.

Russian Prime Minister visits China during important visit

|

The visit of Russian Prime Minister Mikhail Mishustin is considered to be of special significance in the context of increasingly extensive Russia-China cooperation.

Typhoon Kalmaegi upgrades to typhoon, could become super typhoon

|

Typhoon Tino (international name Kalmaegi) strengthened into a typhoon near the Philippines on the morning of November 3.

Strange story of a junior high school with over 23 billion VND built and left unused for over a year

QUANG ĐẠI |

Nghe An - A secondary school in Vinh Phu ward was invested with more than 23 billion VND, completed more than a year ago but is being left unused due to many shortcomings.

A series of resettlement houses left unused for many years, tired of waiting for people to move in

Việt Bắc |

A series of resettlement housing projects in Hanoi have been completed for many years but there are still no people living there, leading to deterioration and waste of investment resources.

Billion-dollar bridge in Thai Nguyen is completed and then abandoned, becoming a dumping ground

Đặng Vũ |

Thai Nguyen - Kieu Chinh Bridge (Phu Binh Commune) has been completed for many years but has been abandoned, becoming a place to collect waste and construction materials.