Traffic
Long Thanh airport is about to open, Ho Chi Minh City urgently completes connectivity
|
Ho Chi Minh City - Long Thanh Airport will be operational from mid-2026. Ho Chi Minh City directs acceleration of connecting transport projects to avoid congestion when the airport comes into operation.
Following Phu Tho Riverine Police to ensure safety during the festival season on the lake
|
Phu Tho - The Riverine Police force strengthens inspections on Hoa Binh Lake, resolutely preventing violating vehicles from leaving port.
People agree to expand Lang road, hoping for reasonable compensation
|
Hanoi - Before the proposal of the Department of Construction on the Lang road expansion project, many households supported the policy and hoped for satisfactory compensation.
Multiple car accident, local congestion on Bao Loc Pass
|
Lam Dong - A multi-vehicle accident between 3 cars in heavy rain caused local traffic congestion on Bao Loc Pass.
Commencement of a new road connecting National Highway 32 with National Highway 21A, investment of more than 572.3 billion VND
|
Hanoi - Phuc Tho Commune People's Committee simultaneously started construction of 6 large projects, including the project of the road connecting National Highway 32 with National Highway 21A.
Hot news in Saigon: Current status of gateway road will be expanded to 10 lanes
|
Hot News Saigon November 28: Current status of gateway road to be expanded to 10 lanes; Developments of rainy season, high tides in the South;...
People feel more secure when Phu Huu roundabout is divided into lanes
|
HCMC - After renovation, traffic at Phu Huu roundabout (Thu Duc City) has had positive changes, congestion has decreased.
Expanding 30m of the road leading to the 150-hectare park project in Ho Chi Minh City
|
District 12, Ho Chi Minh City is expanding the road leading to the 150-hectare park project to 30m, while renovating many canals and building roads along the canals.
Ho Chi Minh City faces shortage of 250,000 driver's license blanks
|
Ho Chi Minh City is short of 250,000 driver's license blanks due to a sudden increase in demand, partly due to people's misunderstanding about the validity of old driver's licenses.
Ninh Binh - Hai Phong expressway cannot start construction in 2024
|
Ninh Binh - Due to some difficulties and procedural problems, the Ninh Binh - Hai Phong expressway project, the section through Ninh Binh, cannot start construction in 2024.
Current status of National Highway 22 will be expanded to 10 lanes
|
HCMC - National Highway 22 (from An Suong intersection to Ring Road 3) 8.7 km long through District 12 and Hoc Mon district will be expanded to 60 m with 10 lanes.
People happily walk on the new 512 billion VND bridge in Ho Chi Minh City
|
HCMC - Many people in District 7 and Nha Be district were overwhelmed when they could travel conveniently on the new Rach Dia bridge after more than a year of waiting.
The Ho Chi Minh City Ring Road 3 project through Binh Duong has disbursed 9,248 billion
|
Binh Duong - The working delegation of the Standing Committee of Binh Duong Provincial Party Committee has supervised the implementation of the Ho Chi Minh City Ring Road 3 project on urgent issues.
About to build a 200km strategic road connecting Ho Chi Minh City and 4 provinces
|
Beltway 4 is more than 200 km long, connecting Ho Chi Minh City with Long An, Binh Duong, Dong Nai, and Ba Ria - Vung Tau provinces. Construction is expected to start in 2026 and be completed in 2028.
Traffic in District 7 and Nha Be will change dramatically with the 500 billion VND bridge
|
HCMC - Tomorrow morning (November 28), the Rach Dia bridge worth over 500 billion VND will officially open to traffic, bringing about a major change in traffic between District 7 and Nha Be district.
2 people injured after multiple accidents on Highway 6
|
Son La - An accident occurred on National Highway 6 through Thuan Chau district, injuring 2 people.
Consecutive accidents involving foreigners riding motorbikes
|
Binh Thuan – Within 1 month, there have been 3 accidents involving foreigners driving motorbikes on the tourist route Ham Tien - Mui Ne, Phan Thiet.
Speeding up construction of 571 billion VND intersection in Ho Chi Minh City Ring Road 3 project
|
In the last months of the year, contractors are speeding up the construction progress of the Binh Chuan intersection of the Ho Chi Minh City Ring Road 3 project through Binh Duong.
Reason for removing steel fences on the busiest street in Hanoi
|
Hanoi - The steel fence on the median strip of Giai Phong Street is being dismantled.
Disagreements between Metro Line 1 contractors remain unresolved
|
HCMC - Internal disagreements between the joint venture contractors of package CP1a (underground section from Ben Thanh to City Theater) of Metro line 1 have not yet been resolved.