Traffic
Workers stay up all night repairing Truong Tien bridge
|
HUE - Workers work overnight on Truong Tien bridge to keep up with the repair and maintenance progress of the iconic project of Hue.
Tank truck collision on National Highway 51 causes chemicals to spill onto the road
|
Dong Nai - Fire and Rescue Police promptly respond to chemical spill incidents on National Highway 51.
Hanoi handles 17 congestion points, switches to regulation according to route axis
|
Hanoi handles 17/51 congestion points, promotes traffic regulation along routes, applies AI and invests in infrastructure towards the 2030 target.
Ho Chi Minh City proposes more than 23,600 billion VND to open 2 strategic roads connecting Tay Ninh
|
Ho Chi Minh City proposes more than 23,600 billion VND to build 2 new strategic traffic routes including Vo Van Kiet extended road and National Highway 50B to strengthen connectivity with Tay Ninh province.
Spending more than 157 billion VND to build an additional bridge across the Ky Cung River connecting 2 border super wards
|
Lang Son - Cua Nam bridge, about 286 m long, is expected to shorten travel time between the two central wards across the Ky Cung River.
Ha Giang informs about granting and exchanging driving licenses
|
The work of issuing and exchanging driving licenses (GPLX) in Ha Giang will continue to be carried out by the Department of Transport until there is an official handover document.
Roadmap for the construction of Ngoc Hoi bridge connecting Hanoi with Hung Yen
|
The Ngoc Hoi bridge construction project connecting Hanoi with Hung Yen is divided into 2 component project groups, with implementation period from 2025-2030.
Prosecution of the bus driver in the accident on National Highway 6 that killed 6 people
|
Son La - The police have prosecuted the driver who caused a serious accident on National Highway 6, killing 6 people and injuring many others.
Exams in Can Tho continue to take place normally
|
Can Tho - Although it is in the process of transferring management units, the exam is still taking place normally, without interruption.
Results of alcohol and drug concentration of the driver in the accident that killed 6 people
|
Son La - The authorities have conducted an alcohol and drug test for the two drivers in the traffic accident that killed 6 people on National Highway 6.
Scene of the accident that killed 6 people on National Highway 6
|
Son La - On the night of February 21, on National Highway 6, a traffic accident occurred between a passenger car and a tractor-trailer, causing many casualties.
Determining the cause of the accident that killed 6 people on National Highway 6
|
Son La - The authorities have determined the preliminary cause of the traffic accident between a passenger bus and a tractor-trailer on National Highway 6, which killed 6 people.
Identities of 6 people who died in a passenger bus accident on National Highway 6
|
Son La - The authorities have identified the victim of the traffic accident between a passenger bus and a tractor-trailer on National Highway 6 that killed 6 people.
5 urgent projects to prevent traffic jams in Ho Chi Minh City are only half open to traffic
|
HCMC - The My Thuy and An Phu intersections, the Tran Quoc Hoan - Cong Hoa connecting road, the Duong Quang Ham road expansion, and National Highway 50 are only half open to traffic due to land clearance problems.
8-lane road in Hanoi after traffic light adjustment
|
The Tran Huu Duc - Trinh Van Bo road (Nam Tu Liem district, Hanoi) has had its traffic light signal adjusted after a persistent traffic jam.
Ho Chi Minh City residents look forward to the day of building a 1,000 billion VND pedestrian bridge
|
HCMC - The pedestrian bridge across the Saigon River connecting Bach Dang Wharf Park with the Saigon Riverside Park is about to start construction, expected on March 29.
Overturning a truck, a car was turned across, dragged on the road
|
Long An - The dashcam recorded images of a 5-seat car crossing the front of a truck at close range and the accident occurred.
Repairing damaged suspension bridge after Lao Dong Newspaper's reflection
|
Thai Nguyen - The Nhat Waterfall suspension bridge (Dong Hy) is damaged, causing difficulties in travel and trade, and has been repaired and overcome.
Current status of the billion-dollar intersection in Ho Chi Minh City has been congested for 9 years due to land clearance
|
HCMC - Construction started in 2016, but the My Thuy intersection (Thu Duc City) has not yet been completed due to land clearance problems.
Preventing fence crossing on unfinished Hai Phong coastal road
|
Although the Hai Phong coastal road project is still unfinished and littered with materials, many people still ignore the danger and travel back and forth.
